• Local demand in Hisar for BioCNG; fulfilled locally or at Delhi NCR (cheaper)
• Configuration of BioCNG unit such that it can accept biogas only from Biogas Plant
• If biogas plant is only used for BioCNG and all BioCNG is sold locally to vendor at Rs. 40/kg:
2
BioCNG demand
Bio CNG:
Demand:
Hisar - Sold at a station between Hisar and Hansi, market price = Rs. 72/kg
Delhi/Gurgaon – taxi drivers in Hisar who have CNG vehicles, prefer to fill at Delhi/Gurgaon as there
CNG is sold at Rs. 45-55/kg
3
BioCNG – process diagram and technical specs
Bio CNG:
Supply:
Vehicle
g
s in dispenser
en
sp
Di
Source (Biogas Booster
Purification
Plant/Dry Blower compressor
Unit S to
Digester) rag
e
Cascade
cylinders
4
BioCNG – technical specs
Bio CNG:
Supply:
5
BioCNG – technical specs
Bio CNG:
Supply:
• Single cylinder capacity = 15 m3 (75 L water capacity) (**75 L water capacity would make volume
0.075 m3; 15 m3 means 15,000 L which is clearly not the capacity of the cylinders on site)
• Max. pressure inside cylinder = 200 bar
6
BioCNG – output analysis on basis of specs given
Bio CNG:
Supply:
Calculations:
** Density of biomethane 0.4 kg/m3 @ 0.5 bar and 180 kg/m3 @ 200 bar (literature)
1. Volume inflow rate of biomethane into booster compressor = 20 m3/h @0.5 bar
2. Mass inflow rate of biomethane into booster compressor = 8 kg/h
3. Mass inflow rate booster compressor = mass outflow rate booster compressor
4. Volume outflow rate booster compressor = 8 kg/h / 180 kg/m 3 = 0.045 m3/h
5. Time taken to fill one cylinder (75 L ~ 0.075 m3 @200 bar) = 1.66 h
6. Time taken to fill 48 such cylinders = 80 hours (~4 days)
7
BioCNG – output analysis on basis of specs given
Bio CNG:
Supply:
Amount of BioCNG in one cylinder = 13.5 kg (75 L @ 200 bar ; 0.18 kg/L)
Amount of BioCNG in all 48 CBG cylinders = 650 kg
Assuming all the sale being made to the station at Hansi, and a transport/loading/unloading/return
time of 2 day, total turnaround time (TAT) for all cylinders comes out to be 6 days.
Avg. sales per month (if the biogas plant is run only for BioCNG production) = Rs. 1,30,000