PROJECT

ARABIAN RANCHES III

PHASE
PHASE- 4C, 4D & 3D (ANYA 1 &2 , MAY)

CLIENT
M/S EMMAR

C O N S U LTA N T
POST POUR MIRAGE LEISURE & DEVELOPMENT LLC

CONCRETE C O N T R A C TO R
GINCO GENERAL CONTRACTING LLC, DUBAI

REPORT D AT E
31 May 2024
Click icon to add picture

AR3-PH– 4C, ANYA – 1 (B.N0- 51)


 Major Honeycomb found on the staircase’s spandrel beam due to improper vibration
during the concrete pouring.
Click icon to add picture

AR3-PH– 4C (ANYA – 1) B.N0- 51


 Major Honeycomb found on the staircase’s riser because of the improper vibration.
Click icon to add picture

AR3-PH– 4C, ANYA – 1 (B.N0- 50)


 Major Honeycomb found on the slab soffit and the beam surface.
Click icon to add picture

AR3-PH– 4C, ANYA – 1 (B.N0- 50)


 Honeycomb found on the slab soffit and the beam surface.
Click icon to add picture

AR3-PH– 4C, ANYA – 1 (B.N0- 51)


 Major Honeycomb found on the staircase’s spandrel beam and near to the Mid Landing
due to improper vibration during the concrete pouring.
Click icon to add picture

AR3-PH– 4C, ANYA – 1 (B.N0- 51)


 Major Honeycomb found on the staircase’s spandrel beam due to improper vibration
during the concrete pouring.
Click icon to add picture

AR3-PH– 4C, ANYA – 1 (B.N0- 50)


 Due to improper Vibration at the Beam-Column Junction, resulting the Honeycomb.
Click icon to add picture

AR3-PH– 4C, ANYA – 1 (B.N0- 50)


 Due to improper Vibration at the Beam-Column Junction, resulting the Honeycomb.
AR3-PH– 4C, ANYA – 1 (B.N0- 50)
 The Hand Gloves of the Workers has also been Concreted in the Column.
AR3-PH– 4C (ANYA – 1) B.N0- 51
 The Finished time of the Column casting was 1:30 Am and the De-shuttering time of the
Freshly casted Column is Started at 6:30 AM of Building N0 – 34 in May. (Within 41/2 Hours).
AR3-PH– 4D, ANYA – 2 (B.N0- 29)
 Due to minimum clear cover between rebar and concrete, honeycomb appears in the
column and the lack proper vibrator caused honeycomb..
AR3-PH– 4D, ANYA – 2 (B.N0- 29)
 Due to minimum clear cover between rebar and concrete, honeycomb appears in the
column and the lack proper vibrator caused honeycomb.
AR3-PH– 4D & 3D, ANYA – 2 & MAY (B.N0- 29 & 35)
 Due to minimum clear cover between rebar and concrete, honeycomb appears in the
column and the improper vibration execution during the concrete pouring.
AR3-PH– 3D, MAY (B.N0-35 & 33)
 Due to minimum clear cover between rebar and concrete, honeycomb appears in the
column.
Click icon to add picture

NCR
 Regarding the Concern of the Honeycomb, Consultant is raised NCR & SOR.