Mechanical workshop
4th week of Jan-2024 Report
COMPLETED WORKS
CONTENTS
PLAN FOR NEXT WEEK
STUMBLING BLOCKS
INTRODUCTION
1 Machinery Maintenance
2 Mechanical Maintenance
2 Iveco tool Indode maintain oil engine 1 (one) one oil filter,6L
car service engine oil
A79682
5 Iveco tool Indode adjusts brake system and add 1 (one) l.5L brake
car A22504 brake fluid oil fluid
oil/DOT4
6 railcar matahara air compressor is 1 (one) -
maintained and
assembled back
Engine over head oil leak
point is identified
Mechanical maintenance workshop
Weekly Report in jan-2024
Completed works
S/N Equipment, Equipment, Maintenance highlight No of Spare and
Vehicles or V/M name equipment/m material used
machinery's Use unit achinery
name maintained
7 water truck Labu adjust air brake system, 1 (one) fuel line hose
plate ET front right side brake
55462 shoe finished and lower
arm bolt damage,
changed fuel line hose
8 Isuzu Double indode hanged old brake shoe 1(one) 0.50kg grease ,
cab tool car for front two wheels from used brake
A66485 damage car shoe
Completed works
S/
N
Equipment,
Vehicles or
Equipment,
V/M name
Maintenance highlight
machinery's Use unit
name
11 kitchen door Indode Made of door for the cafteria by using the
cafeteria welding materials and metal sheet also angle
irons
Mechanical maintenance workshop
Weekly Report in jan-2024
Completed works photographs
Mechanical maintenance workshop
Weekly Report in jan-2024
Planned vs completed
S.
N
Equipment/ machinery/ requested Completed PERCENTAG
vehicle E
Thanks