Date: APP 08-APP 11 / 2024 G.C
INTRODUCTION

COMPLETED WORKS
CONTENTS
PLAN FOR NEXT WEEK

STUMBLING BLOCKS
INTRODUCTION

Mechanical Workshop is responsible for the maintenance


of machine, machineries and equipment's such as railcars,
tamping machines, stabilizer machine, ballast collector
machine, generators, pumps, Hydraulic track lining
machine, cranes, Internal combustion Track wrench and
Vehicles . Besides, it builds and maintains different
structures by welding.
INTRODUCTION

• Based On New organizational Structure Mechanical


Maintenance Workshop Has 3 Teams

1 Machinery Maintenance

2 Mechanical Maintenance

3 Large Machine Operation


STAFF SIZE
S/N Staff position Number of Remark
staffs

1 Mechanical workshop manager 1

2 Team leaders 3 1 vacant


3 Operator, Tamping Machine 6 4 vacant
4 Operator, Stabilizer Machine 1 1 vacant
5 Operator, Ballast distributor 1 1 vacant
6 Technician, Electrical 1
7 Welder 4 1 vacant
8 Electrical Mechanical Fitter 4
STAFF SIZE continued …

S/N Staff position Number Remark


of staffs
9 Assistant Technician, Mechanical 4

10 Technician, Vehicle Maintenance 2

11 Technician, Generator Maintenance 2 1 vacant

12 Technician, Pump Maintenance 2 2 vacant

13 Technician, Gantry Crane Maintenance 2 2 vacant

14 Technician, Mechanical 4 2 vacant

Total no of staffs 37 15 vacant


Mechanical maintenance workshop
Weekly Report in APP. 2024
Completed works

S/N Equipment, User unit Maintenance highlight Quantity of Spares and


Vehicles or equipment/v materials used
machinery's ehicle/
name machinery
maintained

1 isuzu double indode maintenance clutch and 01 1 old clutch disc


cab tool car changed old clutch disc

2 iveco tool mieso Welding work and Painting 01 3L paint, welding


car(crashed crashed parts, changed electrode,
car) windshield 1windshield
3 water track labu changed gear select lever, 01 1 used gear
maintain horn, air cleaner, select lever,
welding door 1used horn
Mechanical maintenance workshop
Weekly Report in APP.2024
Completed works

S Equipment, Equipment, Maintenance highlight No of Spare and


/ Vehicles or Vehicles or equipment/ material used
N machinery's machinery's machinery
name Use maintained
name
unit

4 iveco tool Indode Maintain right and left 01 -


car(plate no AA turn signal
A64686)
Mechanical maintenance workshop
Weekly Report in APP.2024

Planned vs completed

S.N Equipment/ machinery/ Requested Completed PERCENTAG


vehicle E

1 TRACK JACK YQB 4 - 0% (spare


parts issue)
2 ISUZU Light duty truck 2 2 100%

3 Water truck 1 1 100%

4 Iveco tool car 2 2 100%


Pictures during maintenance work
Pictures during maintenance work
Mechanical maintenance workshop.
Work Plan For The Next Week
1. Emergency maintenance of vehicles, generators and other
machines will be done according to the priority given in
consideration.
2. 1 Loader, 1 Excavator, Maintenance of one starter motor , Mieso
iveco tool car and, mieso railcar.
Mechanical maintenance workshop.
stumbling blocks
1. Delay of supply of spare parts is a serious issue. Most of the
time the delay is significantly too much.
2. Staff issue
• skill gaps
• staffs not recruited in some critical positions
Mechanical Maintenance