REV.1JDI Intermill Template 2024
REV.1JDI Intermill Template 2024
Project Leader Jaka Pamungkas NIK 01111036 Division Engineering Section MTC Utility
Collaborate Team 1. Billy Ahmad 2. Angga 3. Nova
BEFORE AFTER
Description Description
Before JDI pump OPU#2 Capitation because Affter JDI pump OPU#2 good condition and ready
level river water low supply raw water to process FWT.
BENEFIT
Quantitative Qualitative
1. Reduce cost spare part Impeller Pump 3. Reduce Cost Loss Pump OPU#2 Q = Reduce Customer Complain
1 Unit Impeller IDR 60.000.000 Cost Per kwh = IDR 1.114,74 C = Reduce Cost IDR 119.874.915
D = Continue Supply Raw Water to Process at FWT
2. Reduce loss energy pump OPU#2 = 111,9 kwh x 16 jam x IDR 1.114,74 S = Improve A void Work Accident
Loading pump (Capitation Condition) , I =200 A = IDR 1.995.831 /day M = Skill Employee
(P) = √3 x V x I x Cosϸ = IDR 59.874.915 /Month
= ( √3 x 380 x 200 x 0.05) x 1 Hour
= 111,9 kwh
Background
Analysis Problem : Impeller Centrifugal Pump Root Cause :
Impact low level river can
1 cause capitation
Machine design
The impact dry season on centrifugal
pump can cause capitation Cracked impeller pump
2
Materials science
Cracked impeller pump.
LEVEL
6
Fluid mechanics 5
Capitation centrifugal pump. Centrifugal Pump - D 4
OPU #2 3
2
1
Implementation
Lay Out Process Centrifugal Pump - OPU #1 & OPU#2
OPU #2
OPU #1
Lagoon #2
Implementation
Material Process modification Check & Monitoring
Before Action
To Process FWT
Before Action : Prepare Tool & - Prepare parts - After adding the pump,
- The pump experiences Material : - Fabrikasi it did not experience
capitation - Valve 3” - Welding capitation
- Vibrasi - Pipe 3” - No vibration occurs
- can't suck it - Elbow 3” - The process of supplying
- Flange 3” water to the FWT LEVEL
becomes smooth
6
5
Centrifugal Pump - D
4
OPU #2
3
2
1
Benefit & User Satisfaction
Total Benefit
USD 7.626,12