AQUASUB ENGINEERING UNIT IV

FOUNDRY DIVISION III

ZONE –6
SHOP FLOOR
5S REVIEW
ISO 9001 : 2015 5S ADHERENCE Page 1
5S LAYOUT

IMPLEMENTATION AREA

U T
Y O
LA
N E
Z O

ISO 9001 : 2015 5S ADHERENCE Page 2


ZONE MEMBERS LIST

ZONE 6 LEADER

J LAWRANCE

MURUGAN VENKATESH SAJU DOS JITENDAR MANJI

Page 3
5S STATUS - BEFORE and AFTER

LOCATION: 2S –TRAIL PATTERN AREA

BEFORE AFTER
27/02/2024 29/02/2024

INTANGIBLE BENEFITS

PATTERNS ARE NOT PROPER ARRANGEMENT PATTERNS ARE ARRANGED IDENTIFIELD LOCATION WITH
MARKING BAY FOR IDENTIFICATION NUMBER

ISO 9001 : 2015 5S ADHERENCE Page 4


5S STATUS - BEFORE and AFTER

LOCATION: 2S –SHOP FLOOR FEROTO

BEFORE AFTER
19/01/2024 27/01/2024

INTANGIBLE BENEFITS

PATTERN ARE STORED IN VERITICAL STORAGE WITH


PATTERN ARE STORED IN VERTICAL STORAGE
IDENTICATIONR TRAY NUMBER AND PATTERN LOCATION A B C D
WITHOUT IDENTIFICATION AND MASTER LIST CREATED FOR EASY RETRIVEL

ISO 9001 : 2015 5S ADHERENCE Page 5


5S STATUS - BEFORE and AFTER

LOCATION: 1S,2S –SHOP FLOOR FILE CABINET

BEFORE AFTER
23/02/2024 27/02/2024

INTANGIBLE BENEFITS

UNWANTED FILE, PAPER ARE REMOVED IDENTIFICATION STICKER ARE DISPLAYED

ISO 9001 : 2015 5S ADHERENCE Page 6


5S STATUS - BEFORE and AFTER

LOCATION: 1S,3S :SAND PLANT CABIN OUT SIDE

BEFORE AFTER
19/12/2023 21/12/2023

INTANGIBLE BENEFITS

CABIN AC UNIT FIX DISTURBED IN PATHWAY AC UNIT FIXED OUTSIDE WITH CENTRELISED
DUCTING SYSTEM

ISO 9001 : 2015 5S ADHERENCE Page 7


5S STATUS - BEFORE and AFTER

LOCATION:1S,2S,3S HELMET STORAGE CUPBOARD

BEFORE AFTER
23/02/2024 24/02/2024

INTANGIBLE BENEFITS

MISMATCH ARRANGE AND NOT IDENTIFICATION IDENTIFCATION ON HELMET RACK AND EACH HELMET

ISO 9001 : 2015 5S ADHERENCE Page 8


5S STATUS - BEFORE and AFTER

LOCATION:KANBAN STORAGE AREA

BEFORE AFTER
23/02/2024 24/02/2024

INTANGIBLE BENEFITS

MULTIPILE ITEM MIXED IN A SINGLE PALLET CASTING ARE SEPARATE IN A PALLET WITH
DIFFICULT TO IDENTIFY THE ITEM IDENTIFICATION ITEM NAME AND QUANTITY

ISO 9001 : 2015 5S ADHERENCE Page 9


FUTURE IMPLEMENTATION

S.NO ACTION PLAN RESPONSIBILITY TARGET DATE

PATTERN IDENTIFICATION STICKER ON PATTERN AND


1 PATTERN STAND TO BE PLANNED LAWRANCE

EASY TO SEARCH THE PATTERN NAME OR DCODE ON


ELECTRICAL
2 VERTICAL STORAGE MONITOR TO BE PLANNED
MAINTAINENCE

DAILY PLANNING PATTERN STORAGE TRAY NUMBER


3 DISPLAYED IN PLANNING REPORT LAWRANCE

FOUNDRY DIVISION ISO 9001,14001,45001 & TPM COMPANY


ISO 9001 : 2015 5S ADHERENCE Page 10
FUTURE IMPLEMENTATION

PATTERN D CODE

 PATTERN D CODE
MARKED ON PATTERN
TO BE PLANNED
 EASY TO IDENTIFLY

FOUNDRY DIVISION ISO 9001,14001,45001 & TPM COMPANY


ISO 9001 : 2015 5S ADHERENCE Page 11
FUTURE IMPLEMENTATION

PATTERN STAND

 PATTERN NAME
DISPLAYED ON
PATTERN STAND TO
BE PLANNED
 EASY TO IDENTENIFLY

FOUNDRY DIVISION ISO 9001,14001,45001 & TPM COMPANY


ISO 9001 : 2015 5S ADHERENCE Page 12
FUTURE IMPLEMENTATION

PATTERN NAME

 PATTERN NAME
DISPLAYED ON
PATTERN TO BE
PLANNED
 EASY TO IDENTIFLY

FOUNDRY DIVISION ISO 9001,14001,45001 & TPM COMPANY


ISO 9001 : 2015 5S ADHERENCE Page 13
ZONE-VI SHOP FLOOR

STEERING COMMITTEE MEETING

REQUIREMENT FROM MANAGEMENT


CRANE FOR PATTERN HANDLING
VERTICAL STORAGE SYSTEM

Page 14
CRANE FOR PATTERN HANDLING

 UNAVAILABLITY OF CRANES PATTERNS UNLOADING NEAR VERTICAL STORAGE AREA


 PATTERN ARE LOADING AT THE TIME OF IDLE / BREAKDOWN /SUNDAY MAINTENCE TIME PATTERN
LOADING AT VERTICAL STORAGE
 TWO CRANES USED FOR FURNACE MATERIAL CHAREGING AND METAL TRANSFER
 DAILY PATTERNS TO BE LOADING AND UNLOADING FROM VERTICAL STROAGE AND DISAMATIC
MACHINE
 DAILY USING AVERAGE 20 PATTERN
 WE REQUIRED DEDICATED CRANE FACILITY FOR PATTERN LOADING AND UNLOADING

Page 15
VERTICAL STORAGE SYSTEM

 NO OF ACTIVE PATTERNS : 396


 CURRENT PATTERN STORAGE CAPACITY : 192( 16TRAY x 4 PATTERN ) x 3 VERTICAL STORAGE )
 BALANCE PATTERN TO STORAGE : 204
 WE REQUIRE 3 VERTICAL STORAGE SYSTEM TO STORE CURRENT PATTERN
QUANTITY

Page 16