MMM Geo Dept Period Nov 2016
MMM Geo Dept Period Nov 2016
G EO LO GY
D E PA R T M E N T
2016
G EO LO GY
ORGANIZATION CHART DEPARTMENT D E PA R T M E N T
QUALITY OBJECTIVE
GENERAL SUMMARY
SUMMARY HIGHLIGHT
PLAN VS ACTUAL
BUDGET UTILIZED
HR REPORT
PROBLEM SOLVING
MMM (MANAGEMENT MONTHLY MEETING)
ACTIVITIES
PERIOD NOVEMBERIN PICTURE
2016
Management Monthly Meeting 3
2016
YUSTIANUS LOBO
ADMINISTRATION
MARIA BETI DS
GEOLOGY
ALFIRMANSYAH
AMD
GEO DRILLING GEOTECH ENGINEER DATA & MODELLING
GEOLOGIST
2. QUALITY OBJECTIVE G EO LO GY
D E PA R T M E N T
2016
2. QUALITY OBJECTIVE G EO LO GY
No. Indicator
D E PA R T M E N T
Target Unit
Year 2016
Nov Q4TD YTD
1 Production Target 2060 Kton 222 436 1,899
2016
2 Control Stripping Ratio 7.77 BCM/Ton 6.58 2.46 6.40
3 Monthly Report & MMM Report 12 Report 1 2 11
4 Monthly Geotech analysis for Monthly Mining Plan Design 12 Report 1 2 11
5 Monthly Geology Issue for Monthly Mining Plan Design 12 Report 1 2 11
6 Monthly Drilling Plan 9 Report 1 2 9
7 Insitu Geology Reconciliatoin 24 Report 2 4 22
8 Geo Drilling 17780 Meter 4598.3 8938.3 24218.6
9 Daily Drilling Report and Daily AMD Monitoring 600 Report 58 118 545
10 Drilling Progress Review 36 Report 4 8 44
11 Monthly Coal Model 10 Report 1 2 9
12 Geology Weekly Report 48 Report 4 8 44
13 Small Class Training 4 Event 1 2 7
14 General (All Department):
14.1. 5S Program 80 Percentage 92 92 91.85
14.2. Sugesstion System (SS) 150 Percentage 0 0 0
14.3. Kelompok Peningkatan Aktifitas Kerja (KOMPAK) 1 Topic 1 1 7
14.4. ISO Integrated System 9001; 14001; OHSAS 18001 & SMK3 100 Percentage 100 100 300
14.5. SHE-AP Program 80 Percentage 100 100 98.5
14.6. SMKP 100 Percentage 100 100 100
15 Safety Aspect 0 Time 0 0 0
16 Environment Aspect 0 Time 0 0 0
4. SUMMARY HIGHLIGHT G EO LO GY
SEPTEMBER OCTOBER
D E PA R TNOVEMBER
MENT
Pre-production Drilling
2016
Participate in General Safety Participate in General Safety
Participate in General Safety
Talk, MGP Safety Meeting and Talk, MGP Safety Meeting and
Talk, MGP Safety Meeting and
MGP Cleaning Day. MGP Cleaning Day.
MGP Cleaning Day.
Drilling at Bk01, Bk02, Bk08, Drilling at Bk07, Bk09 in order
Drilling at Bk01, Bk02, Bk08,
Bk09 in order to cover seam to cover seam 8000 groups
Bk09, Bk10 in order to cover
2300, 6000 & 8000 groups (Biangan Area) and Bk21 & Bk22
seam 6000 & 8000 groups
(Biangan Area) and Bk21 & Bk22 (Lempenang Area).
(Biangan Area) and Bk21 & Bk22
(Lempenang Area). Prepare drilling plan December
(Lempenang Area).
Prepare drilling plan November 2016.
Prepare drilling plan October
2016. Sample preparation.
2016.
Sample preparation. Update and review ITM STEP
Sample preparation.
Update and review ITM STEP CHANGE progress.
Update and review ITM STEP
CHANGE progress.
CHANGE progress.
4. SUMMARY HIGHLIGHT G EO LO GY
SEPTEMBER OCTOBER
D E PA R TNOVEMBER
MENT
Geotechnical
4. SUMMARY HIGHLIGHT G EO LO GY
SEPTEMBER OCTOBER
D E PA R TNOVEMBER
MENT
AMD Management
4. SUMMARY HIGHLIGHT G EO LO GY
SEPTEMBER OCTOBER
D E PA R TNOVEMBER
MENT
Geo Modelling
4. SUMMARY HIGHLIGHT G EO LO GY
SEPTEMBER OCTOBER
D E PA R TNOVEMBER
MENT
OTHER
2016
Generate drilling plan for Generate drilling plan for Join Small Class
budget Y2017 budget Y2017 Training#11/2016 on October
Join Small Class SITE KOMPAK presentation at 26, 2016 by Geology Dept.
Training#9/2016 on August 26, Bunyut, 13-14 October 2016. Workshop Geotechnical
2016 by Survey Dept. Training Geospatial information Balikpapan, 6 – 7 November
science and engineering at 2016
Yogyakarta, 27 October 2016 Training refreshment KCMI
Join Small Class Perhapi Jakarta 19 -20
Training#10/2016 on September November 2016
25, 2016 by Mineplan Dept.
2016
2016
No Unit Driller Plan (m) Actual (m) Logging (m) ROP (m/Hr) Cov Logging (m)
1 CT01 Hakam 720.00 1071.00 1045.04 35.70 97.58%
2 CT02 Huri 710.00 1063.00 1046.64 35.43 98.46%
3 CT03 Jayus 720.00 721.00 699.73 24.03 97.05%
4 CT04 Syahriel 720.00 726.00 706.11 24.20 97.26%
MMM (MANAGEMENT
5
MONTHLY MEETING)
CT05 Rustam 750.00 758.50 746.13 25.28 98.37%
PERIOD NOVEMBER 2016
TOTAL 3620.00 4339.50 4243.65 28.93 97.74%
Management Monthly Meeting 14
2016
THICKNESS (m) ELEVATION (m) THICKNESS (m) ELEVATION (m)
DATE TP POINT SEAM SECTION DATE TP POINT SEAM SECTION
MODEL ACTUAL VAR. MODEL ACTUAL VAR. MODEL ACTUAL VAR. MODEL ACTUAL VAR.
5-Nov-16 TP2300_62 2300 1061 1.33 1.15 -0.18 71.45 71.17 -0.28 2-Nov-16 TP3740_92 3740 1072 2.61 3.30 0.69 95.91 95.50 -0.41
2016
Coal = 2.50 M
TARGET = Subcrop Seam 3740
Floor Coal
2016
2016
Safe Safe
P3000Bk05 P3000B05
Safe Safe
1-Nov-16
2-Nov-16
3-Nov-16
4-Nov-16
-25.12
-25.25
-25.00
-24.15
-4.90
-4.85
-4.85
-5.05
-12.19
-12.17
-12.22
-12.30
-8.82
-8.80
-8.81
-8.82
-7.95
-7.88
-7.95
-8.04
2016
5.75
0.00
3.50
0.00
5-Nov-16 -24.18 -5.60 -12.33 -8.89 -8.04 0.00
6-Nov-16 -24.17 -5.66 -12.42 -8.91 -8.06 0.00
7-Nov-16 -24.19 -5.71 -12.39 -8.96 -8.03 0.00
8-Nov-16 -24.25 -5.75 -12.40 -8.98 -8.09 129.50
9-Nov-16 -4.65 -12.55 -8.84 -7.92 10.38
10-Nov-16 -24.28 -4.70 -12.61 -8.86 -7.95 11.63
11-Nov-16 -24.28 -4.71 -12.60 -8.84 -7.97 39.50
12-Nov-16 -24.27 -4.69 -12.62 -8.83 -7.95 0.00
13-Nov-16 No water level measurement, LV stuck at muddy road at Lempenang area
14-Nov-16 -24.12 -4.65 -12.55 -8.92 -8.84 0.00
15-Nov-16 -24.14 -4.68 -13.00 -8.93 -8.87 0.00
16-Nov-16 -24.19 -4.73 -13.05 -8.95 -8.90 0.00
17-Nov-16 -24.27 -4.75 -13.09 -8.96 -8.91 15.25
18-Nov-16 -25.10 -4.76 -12.93 -8.74 -7.79 0.00
19-Nov-16 -25.12 -4.77 -12.96 -8.75 -7.81 7.50
20-Nov-16 -25.12 -4.75 -12.95 -8.77 -7.80 0.00
21-Nov-16 -25.28 -4.82 -12.97 -8.75 -7.87 26.50
22-Nov-16 -25.24 -4.80 -12.94 -8.71 -7.85 1.80
23-Nov-16 -25.15 -4.70 -12.90 -8.68 -7.83 0.00
24-Nov-16 -25.19 -4.85 -11.00 -8.82 -8.00 5.00
25-Nov-16 -25.23 -4.87 -11.20 -8.74 -7.90 0.00
26-Nov-16 No water level measurement, because problem LV
27-Nov-16 -25.33 -5.60 -11.30 -9.10 -8.80 14.00
2016
2016
Lempenang Lempenang area Lempenang
Prepare data for update modelling Prepare data for update modelling Prepare data for update modelling
Update and review ITM STEP CHANGE Update and review ITM STEP CHANGE Update and review ITM STEP CHANGE
progress. progress. progress.
Geotechnical Participate in General Safety Talk, MGP Participate in General Safety Talk, MGP Participate in General Safety Talk, MGP
Safety Meeting and MGP Cleaning Day. Safety Meeting and MGP Cleaning Day. Safety Meeting and MGP Cleaning Day.
Daily geotechnical monitoring. Daily geotechnical monitoring. Daily geotechnical monitoring.
Preliminary Investigation Landslide. Preliminary Investigation Landslide. Preliminary Investigation Landslide.
Generate geotechnical analysis for Generate geotechnical analysis for Generate geotechnical analysis for
recommendation as request. recommendation as request. recommendation as request.
Generate geotechnical monthly plan Generate geotechnical monthly plan Generate geotechnical monthly plan
analysis Jan 2017. analysis Feb 2017. analysis March 2017.
Compare material model with drill blast Compare material model with drill blast Compare material model with drill blast
activity. activity. activity.
AMD Participate in General Safety Talk, MGP Participate in General Safety Talk, MGP Participate in General Safety Talk, MGP
Management Safety Meeting and MGP Cleaning Day. Safety Meeting and MGP Cleaning Day. Safety Meeting and MGP Cleaning Day.
Daily check pH at drill blast area. Daily check pH at drill blast area. Daily check pH at drill blast area.
Daily AMD Monitoring. Daily AMD Monitoring. Daily AMD Monitoring.
Daily Piezometer monitoring. Daily Piezometer monitoring. Daily Piezometer monitoring.
Collect sample for particle sedimentation Collect sample for particle sedimentation Collect sample for particle sedimentation
rate in rain condition and dry condition. rate in rain condition and dry condition. rate in rain condition and dry condition.
2016
Verified data Drilling, Trenching and Inpit Verified data Drilling, Trenching and Inpit Verified data Drilling, Trenching and Inpit
sampling. sampling. sampling.
Process and submit weekly progress report Process and submit weekly progress report Process and submit weekly progress report
of pit monitoring, Drilling, Geotech + AMD of pit monitoring, Drilling, Geotech + AMD of pit monitoring, Drilling, Geotech + AMD
on date 2, 9, 16, and 23. on date 2, 9, 16, and 23. on date 2, 9, 16, and 23.
Prepare and completed back up payment. Prepare and completed back up payment. Prepare and completed back up payment.
Generate Monthly Coal Modeling Dec Generate Monthly Coal Modeling Jan Generate Monthly Coal Modeling Feb
2016. 2016. 2016.
Provide Drilling Plan Jan 2016 Provide Drilling Plan Feb 2017. Provide Drilling Plan March 2017.
Generate Coal Model, Acid Model & Update and review ITM STEP CHANGE Update and review ITM STEP CHANGE
Maerial Model semester 2 on date 21 Dec progress. progress
2016
Update and review ITM STEP CHANGE
progress.
Other Job Join Small Class Training#12/2016 on Dec Join Small Class Training#01/2017 on Dec Join Small Class Training#02/2017 on Jan
26, 2016 by Survey Dept. 26, 2016 by Mineplan Dept. 25, 2017 by Geology Dept.
KCMI code implementation refreshment at
Jakarta, 19 – 20 Nov 16.
6. BUDGET UTILIZED G EO LO GY
COST CENTER : BEK-GEO (87112) PERIODE OCTOBER 2016
BUDGET ACTUAL
D E PA R T M E N T
ADDITIONAL
REMAINING BUDGET
ITEM (USD) (USD) BUDGET
MTD YTD MTD YTD (USD) (USD) (%)
OPEX
CAPEX
TOTAL
118,912.71
118,912.71
1,294,451.33
1,294,451.33
2016 172,798.91
172,798.91
973,251.88
973,251.88
-
-
321,199.45
-
321,199.45
24.81
-
24.81
7. QSE REPORT G EO LO GY
1.
2.
Continue commit SHE-AP 100% on Nov 2016.
Continue attend on weekly safety talk.
D E PA R T M E N T
3. 4 LV with 13 SIMPER holder.
4. Fuel Consumption LV GEO-01 130 liters with Fuel Ratio 1:2.92 (Budget 350 liters, fuel ratio 1:7.00), LV GEO-02 505 liters (Budget 350
2016
liters) with Fuel Ratio 1:6.53 (Budget 1:7.00), LV GEO-04 616 liters (Budget 350 liters) with Fuel Ratio 1:4.92 (Budget 1:7.00).
5. No environment violation.
ACCIDENT
SHEAP SAFETY TALK
INCIDENT
Remark:
- LV GEO-03 : Break Down since 20 April 2016 - Now
A P
Off
A
D E PA R T M E N T
Field Break
P A
Permission
Non
Permission
Remark
2016
3 M.Ariyanto Preproduction Drilling Section Chief 21 21 2 2 7 7
9. PROBLEM SOLVING G EO LO GY
PROBLEM NOVEMBER 2016 D E PA R T M E N T
PROBLEM SOLVING SUGGESTION
1. Complain tanam tumbuh at trenching 1.1. Complete picture before starting 1.1.1. Share and inform monthly trenching
and drilling area at Lempenang.
2016trenching and drilling acitivity. & driling plan to external relation.
1.1.2. Collect document related blockade
and claim.
2. Road access RKR Km29 to Lempenang 2.1. Repair road by dozer when its moving 2.1.1. Continue repair road if dozer traveling
undulated, muddy and broken. CT05 from Biangan to Lempenang. in and out from Lempenang Area.
3. There are coal anomaly wash out 3.1. Update wash out limit in 3.1.1. Optimize geological and survey data
P3000Bk03 S3000 Sect 1071-1073. BEK1_MCM_1116. for MCM update.
4. There are fault P3000Bk03 S3000 Sect 4.1. Update fault in BEK1_MCM_1116. 4.1.1. Perform pit mapping at Fault Area
1066 and 1068. Biangan and utilize coal survey data
for update BEK1_MCM_1116
5. Sliding P3000Bk03 S3000 Low Wall Sect 5.1. Prepare re-analysis slope stability in 5.1.1. Coordination and discuss with Mine
1066-1071. line with saturated condition, vertical Plan to propose geotechnical
pressure of heavy equipment and recommendation.
blasting vibration.
5.2 Generate geotech progress report
9. PROBLEM SOLVING G EO LO GY
POTENTIAL PROBLEM DECEMBER 2016 - MARCH 2017 D E PA R T M E N T
PROBLEM SOLVING SUGGESTION
1. Different between geologycal model with 1.1. Utilized all data from geology and 1.1.1. Correlate data from continuity of
2016
actual. survey. seam from Biangan.
1.1.2. Detail description from data drilling
lithology, geophysical logging and
quality data.
1.1.3. Add trenching point location.
2. Potential siding in P3000Bk03 and 2.1. Monitoring low wall. 2.1.1. Making early warning system.
P3000Bk05. 2.2. Make recommendation every week in 2.2.2. Implementation geotech progress
accordance progress. report.
3. External problem when drilling and 3.1. Communication with External Relation 3.1.1. Estimate time to drilling and
trenching progress. for Monthly drilling plan and trenching trenching progress in Lempenang
at Lempenang Area. area.
3.1.2. Documentation before drilling activity
in borehole location by driller.
4. Not found sub crop at trenching location 4.1. Correlation with drilling data. 4.1.1. Update all data and generate Monthly
in Lempenang area. Coal Model.
2016
B23000058C B021550013GA PZ02
2 3
G EO LO GY
D E PA R T M E N T
2016
2016
THANK YOU