Transformer Charge

And Safety procedure


Requirements
Agenda
1. Reference Definition.
2. Transformer technical specification.
3. RMU technical specification.
4. SLD of HT incoming to LT distribution.
5. Safety measures taken at RMU, Transformer, HT switch gear ,
LT panel and switch gear and man-user end.
6. How the electricity charging Procedure in ABDOS, Egypt.
7. ABDOS safety procedure at transformer charge.
8- capacity of Economic Transformer Station .
Reference
Definition
Transformer technical specification.

TDS-1500 22 0.4 ALAL ANAF IP23 2.5 mm anti.pdf


RMU technical specification

24-k-v-air-ring-main-unit.pdf
Abdos factory_item 10&20_240208_122432 (2).pdf
ALARM SYATEM at RMU
ALARM SYSTEM at Transformer&switch gear
safety measures taken at LT panels –END USER

30mA, 100mA, 300mA


EARTHING SYSTEM
EARTHING SYSTEM
Safety procedure At Charge Transformer
• Make sure all connections to cables or bus bars are properly connected and well positioned.
• Make sure that all connections at the tap change panel are firmly tightened and at the same position in the
three phases.
• Make sure the grounding mesh is correctly connected to the bolt provided for this purpose. In addition,
make sure the grounding mesh has been correctly executed at the right place foreseen in the project and
shown in the drawing.
• In case of transformers fitted with a thermal protective device, check the connections of the circuit, making
sure that the voltage is in accordance and that the alarm and shut-off contacts are connected to their
corresponding loops.
• In case of transformers fitted with a thermal protective device, check the connections of the circuit, making
sure that the voltage is in accordance and that the alarm and shut-off contacts are connected to their
corresponding loops.
• check the insulation resistance by making measurements between the LV and HV windings and from the
windings to the ground.
capacity of Economic Transformer Station

2*750MVA
3*175MVA
4*40 MVA