Welcome to RAR-02

Project

Monthly Progress Review Meeting RAR-02

4th
13/01 /2022

Dasu Hydropower Project


Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


01 Availability of first Aid boxes at site The contractor provided the first Aid boxes at all site, Inprogress
which are accessible of workers. The contractor was
occupied in the upcoming audit and AFI will be raised till
15th of January 2023.

RAR-02 Dhuga RAR-02 K13 Seo

RAR-02 Khandia & Ghyal


Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


03 Availability of first Aid Station at site The contractor will establish permanent camp for RAR- in progress
02 and is looking for suitable location for it, and First Aid
Station will be established in the same camp. For the
time being the contractor will share the First Aid Station
with Main Works contracts.

There are only two existing river crossings. The first is CR9 steel bridge and second Khandia bridge . The 3 rd is Dugha
cable crane is in progress.

CR9 Barseen Camp


1st ( FAS) 2nd ( FAS)
Kaigha Camp.
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


02 Availability of well Equipped Ambulance The contractor is working on provision of ambulance. In progress
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status

03 Fall arrest System ,rope grabs to implement Currently: A 2 meter hole drilled , After that a metal rod InProgress.
while working at mountain and rivers edges . installed into it . The rope is tied to it . The full body harness Record shared with the
fixed to it and rope is loosed as much as needed. Engineer via WhatsApp
In progress : We have already placed an order of rope grabs to
the vender, it has not been received from the Vender yet.
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


05 Submission of CV for the Deputy HSE The contractor has submitted the CV for the deputy OHS DONE/.
Specialist and now is waiting for the Engineer to arrange shared with the Engineer for the
an interview for the approval. review and approval via Email
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


06 Implementation of PR-06 and PR-07 The contractor has started implementation of PR-06 and Done:
PR-07.
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


07 Update the Emergency Response Plan, Conducted Medical Emergency and rescuse Mock Drill Done:
Procedures, Equipment and TRT
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


07 Update the Emergency Response Plan, Updated List of Emergency Response Team members and Done:
Procedures, Equipment and TRT contact number s displayed on all sites
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


07 Update the Emergency Response Plan, Properly Communicated SMS to TRT for Site Training/ Done:
Procedures, Equipment and TRT Meetimg
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


07 Update the Emergency Response Plan, Training/ Meetimg with Site Team Done:
Procedures, Equipment and TRT
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


07 Update the Emergency Response Plan, Conducted refresher Training of TRT Done:
Procedures, Equipment and TRT
Minute of the Monthly OHS Progress Review Meeting (RAR-02) October 2022

Item No Agenda Item Proposed rectification status


07 Update the Emergency Response Plan, List of Emergency arrangement and Equipment Done: