Best Practices

Electrical Installation
Job Sequence
Material Brack
Inspection &
storing Install

Installation

Testin
Labeling Commis
Electrical Cables Acceptance
Visual Inspection
Imprinted insulator New roll with printed information
Brand: Mega Kabel Brand: Mega Kabel
Materials delivered are well protected Materials delivered are well protected and
and properly stored. properly stored.
Electrical Trunking Acceptance
• Materials delivered are
well protected and
properly stored.
• No scratches or dented
found on trunking.
• Orange colour for
electrical.
• Size and dimension
according to submittal.
Electrical Conduits Acceptance
• Materials delivered are
well protected and
properly stored.
• No scratches or dented
found on conduits.
• Orange colour for
electrical.
• Metal Flexible conduit.
Electrical Fittings Acceptance
• The items are properly
stored and free from
any physically seen
damaged.
• The approved brand
1. MK
2. Schneider
3. Any others approved
as per submittal
Electrical Trunking Installation
• The trunking is well
supported by proper bracket
and closed.
• The maximum capacity of
Proper Bracket wires should not exceed
70%.
• Orange colour for electrical.
• Any damaged during
Maximum Capacity < 70% installation should be
rectified.
• Trunking to trunking must
installed copper conductivity
strip.
Electrical Conduits Installation
• The conduits is well supported by
proper bracket.
• Orange colour for electrical.
• A finished conduits should be free
from any scratches or damaged.
• Conduits capacity: Refer below table.
Electrical Fittings Installation
• Use proper tools to de-
insulated wires to
prevent damaged to
Use of proper tools
copper wires.
• Ensure no exposed of
copper wires seen.
• No loose cables and
fittings connection.
Electrical Cables Layout
• Cables should be taped
together every 5 feet and
labeled every 30 feet.
• During cable pulling, use
cable roller and cables
should be securely taped
and labeled to prevent
cables mixing and proper
care need to be taken to
prevent insulator
damaged.
Electrical DB Termination
• Use only approved
MCCB/MCB brand
Schneider and spec
according to submittal.
• Ensure properly labeled
and protective covered.
• Ensure no loose
connection.
Protective
Covers
Electrical Labelling
• Placed labeling on
electrical fittings and DB
before T&C for
identification.
• QAM recommended to
place the labeling on
top of power points
fitting for easy viewing.
• Correct way of labeling
as shown in picture.
Testing and commissioning
• Prepare ahead all proper tools and well calibrated equipments.
• Testing consists of:
1. Megger test
2. Earth leakage test (Trip test)
3. Voltage Measurements
• Proper recording of test result and documented.