System- Quality
June 2024
Ultratech Components (I) Pvt. Ltd.
Assembly Rejection- Components
Reject Qty.- June 2024
2232
2500
1714
2000
1616
1231
1500
1150
1076
908
788
1000
488
420
397
500
230
207
172
177
145
128
0
0
0
0
0
0
0
0
0
1 2 3 4 5 6 7 8 9 1 11 1213 1 15 1 17 1 1 2 21 2 2 2 2 2 2 2 2 3
0 4 6 8 9 0 2 3 4 5 6 7 8 9 0
Date
Assembly Rejection- Components
Total Reject
Qty:
13079 Nos.
Total OK
Qty.:
114682 Nos.
Assembly Rejection- Components
Machining
Moulding Qty: 226 Nos. Plating/ P.C.
Qty: 834 Nos. Prcntge: 3.96% Qty: 998 Nos.
Prcntge: 10.69% Cost: Rs. 539 Prcntge: 9.26%
Cost: Rs. 2,018 Cost: Rs. 1797
Casting BOP
Assembly
Qty: 2483 Nos. Qty: 8596 Nos.
Rejection
Prcntge: 7.49% Prcntge: 14.36%
Cost: Rs. 78,495 June 2024 Cost: Rs. 17,422
Assembly Rejection- Casting
78.13%
80.00%
65.04%
60.00%
40.00% 36.69%
28.35%
20.00% 13.09% 11.88%
5.80% 4.19%
0.00%
Short Filling Bend Ejector Pin Extra Material Broken Dimensional
350
253
300
Rejection Qty.
230
200
211
250
200
122
150
95
74
100 73
71
63
60
58
40
41
36
24
50
18
6
6
3
0
0 01 02 001 025 001 013 001 001 015 07 017 05 03 001 001 001 09 001 014 001 001 001
1- -0 8- - A- 1- A- 5- B- 8-0 3- 5-0 -0 L- 1- 2- -0 A- 5- B- 0- 9-
112 16A 111 131A 22 -112 20 113 8P 111 -111 113 20A 30 112 00 22A 116 113 8P 116 110
C- -11 C- C-1 -11 C -11 C- -111 C- C C- -11 -11 C- C-3 -11 C-1 C- -111 C- C-
C C C C C C C C
Casting Parts
Action Plan- Casting Defects
Part Defect Root Cause Action Plan Resp.
Name
Splendor Bend Part getting bend Operator made aware Mr. Anshul
Ignition during extraction of not throwing hot
Body from the die and parts on the ground
C-1121-001 hot part getting after extraction from
thrown on the the die.
ground.
80.00%
59.20%
60.00%
40.00%
20.00% 17.95%
9.16% 8.33%
3.56% 1.41% 0.39%
0.00%
Sheet Hardware Casting Machined Rubber Wire Spring
Metal Harness
400
600
1000
1400
1600
0
200
800
1200
1800
2000
1789
848
750
700
580
541
480
475
300
230
213
165
155
150
Casting Parts
145
137
Assembly Rejection- BOP
135
132
103
91
76
75
74
42
33
Action Plan- BOP Parts
Part Defect Root Cause Action Plan Resp.
Name
CT100 Stud - Rework performed by Neeraj
Ignition fitment supplier at their end.
Slider dimension Stud provided to
C-1118-001 Req. 6.3 supplier as a gauge for
Obs. 5.95 checking of fitment
dimension
289
266
300
235
250
200
Reject Qty.
170
200 160
151
140
150
102
100
73
50
30
29
50
10
10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1 2 3 4 5 6 7 8 9 1 11 1 1 1 1 1 17 1 1 2 2 2 2 2 2 2 2 2 2 3
0 2 3 4 5 6 8 9 0 1 2 3 4 5 6 7 8 9 0
Date
Assembly Line Rejection
400
300 250225
200 152
105 95
100 70 61 52 50 46 40
30 22 12 10 10 5 3
0
121 118 3 1A
19 6 0 Z B S 2 A 2D 0 5
16 0
-1 -1 - 11 - 1 113 118 112 110
- 30 -1
U U U U - - 1 - - U U
U U U U
Action Plan- Line Rejection
Part Defect Root Cause Action Plan Resp.
Name
Splendor Key not Lever getting Worn out Sahab
Ignition getting out in stuck during key Broaching punch Singh
Switch Splendor withdrawal due replaced
U-1121 Remote to improper
broaching
Chetak Key getting 1. Key getting 1. Step removed in Arpit
Tool Box stuck during stuck at step key profile area
Lock insertion on key by providing
profile in taper in rotor at
rotor. key entry.
2. Minda levers 2. Ultron levers
used in rotor used with ultron