(-) the negative value

indicate compression
load

Diagram 1

(-) the negative value


indicate compression
load, therefore, no
tensile load acting on
the bolt

Diagram 2
Kicker plate denotes in
Cyan colour
OPTION 1

OPTION 2
FABRICATED
ALREADY

FABRICATED
ALREADY

FABRICATED ALREADY

FABRICATED
ALREADY
GL 24-25, no indication of Toms Equipment
GL 23-24, no indication of Toms Equipment
GL 22-23, no indication of Toms Equipment
Kicker plate Kicker plate

a b

Kicker plate Kicker plate

c d
Option A : the kicker plate which denotes in cyan colour
placement overlay approximately 25mm to the precast column

Option B : the kicker plate which denotes in cyan colour


placement to stop until the edge of the precast column.
Option B : the kicker plate which denotes in cyan colour placement to
stop until the edge of the precast column.
STAIRCASE TYPE 3B

CSC 20240126

- Please confirmed if
the steel column need
to adopt RC column
stump or otherwise ?

Typical RC Column Stump


Details
Shop drawing submission – Steel Grating Layout Plan –Rev. 03 (7 th December 2023 – Thursday)
DRS-CSC-LCM-027-H02
Shop drawing submission – Steel Grating Layout Plan –Rev. 04 (20 th December 2023 – Wednesday)
DRS-CSC-LCM-027-H03
Summary based on 20240209 CIS
Manhole Layout Plan signed off -

Remarks:
a) CIS N3 –
i) Setting out changes
ii) Outer depth changes

b) CIS N7 –
iii) Setting out changes
iv) Outer depth changes

c) CIS N8 –
v) Confirmation on setting out

d) CIS N11
vi) Setting out confirmation
vii) Outer depth confirmation

e) CIS N12
viii) Setting out confirmation
ix) Outer depth confirmation
c) Clashes w manhole
precast cover as shown in
Figure 5

b) Clashes w skid tank as a) Clashes w MEP


shown in Figure 4 Trunking as shown in Figure 2
MEP Trunking

RC column stump &


steel column
c) Clashes w manhole
precast cover as shown in
Figure D

b) Clashes w skid tank as a) Clashes w MEP


shown in Figure C Trunking as shown in Figure
B
c) Clashes w manhole
precast cover as shown
in Figure 5

MEP Trunking

b) Clashes w skid tank


as shown in Figure 4

a) Clashes w MEP
Trunking as shown in Figure 2

RC column stump &


steel column
c) Clashes w manhole precast
cover as shown in Figure 5

b) Clashes w skid tank as shown in


Figure 4

a) Clashes w MEP
Trunking as shown in Figure 2
RC column stump & steel
column clashes with MEP skid
tank
c) Clashes w manhole
precast cover as shown in
Figure 5

b) Clashes w skid tank as


shown in Figure 4

a) Clashes w MEP
Trunking as shown in Figure
2
RC column stump & steel
column clashes with MEP
skid tank
c) Clashes w manhole
precast cover as shown in
Figure 5

b) Clashes w skid tank as a) Clashes w MEP


shown in Figure 4 Trunking as shown in Figure 2
RC column stump & steel
column – found to be
clashed w manhole cover

RC column stump & steel


column – found to be
clashed w manhole cover
c) Clashes w manhole RC column stump & steel
precast cover as shown
in Figure 5
column – found to be
clashed w manhole cover

b) Clashes w skid tank as


shown in Figure 4

a) Clashes w MEP
Trunking as shown in Figure
2

RC column stump & steel


column – found to be clashed
w manhole cover
1m
Backing plate to strengthen
Backing plate to strengthen the
the chequered plate chequered plate
CONCRETE BLOCK

LEGEND
BETEC S150
MAPEI ULTRATOP –
5MM THK (MINIMUM)
CONCRETE POLISHED
FINISHES

20240129 – MOCKUP PREPARATION FOR THE


CANTEEN WATERPROOFING AREA
C)

B)

A)
20240120 – on-site condition (D5 Trench) –
only had 300mm clearance
20240120 – cat ladder re-positioned as per
discussion with LCM (MEP)
B) Cat Ladder had
been repositioned

A) Original Cat Ladder


positioned
A) Original Cat
Ladder position

20240125 – on site condition (D5


Trench) – only had 300mm clearance
20240125 – Affected cat ladder had
been repositioned at the magenta arrow
A) Original Cat B) Cat Ladder had
Ladder position been repositioned
CSC 202040110
- TOO CONGESTED
ISSUES SOLUTION

IEC Platform (GL1/C) – Grating cannot be The grating will be stopped


installed due to heavily congested MEP until here
ducting
ISSUES SOLUTION

IEC Platform (GL5/C) – Grating cannot The grating will be stopped until here
be installed due to heavily congested
MEP ducting
Reducer to be
adopt

RWDP GL11/A1
positioning to
adopt as shown

Reducer 100mm to be adopt Reducer to be


adopt
(sample picture)
Summary emailed sent 9th January 2024
(Tuesday)

1) We queried LCM (MEP) confirmation on the


outer depth for our onwards action

- CSC follow up on the 12th January 2024.


3550 No response received for the outer depth
confirmation. We only received PDF file through
CSC Operation Team.

- CSC Operation Team proceed with rebar


fabrication based on information received on
9th January 2024 (Tuesday) for the blue
highlighted part.
STEEL COLUMN BASE PLATE – (S2)
STEEL COLUMN BASE PLATE – (S3) CLASHES
CLASHES WITH MEP
WITH MEP DUCTING/SERVICES
DUCTING/SERVICES

ORIGINAL POSITION
Section view shows 3 ATC
required

Plan view shows 2 ATC


required
TIE BEAM – DYNACIATE MEASUREMENT

TIE BEAM – IFC MEASUREMENT


ROOF LEVEL -
Generator Equipment Setting Out by MEP Team IT Generator
Mech Generator

On-site Generator Equipment


A B

Mid rail

PLATFORM

BOOMLIFT
BUCKET
Red circle area where blockwall to
be installed at 1.50 m @ below the
steel structure level.

2 1
3
MAVERICK DEFLECTION CHECKING CALCULATION
OKA DEFLECTION CHECKING CALCULATION

The deflection check by OKA (left side) was not tally with deflection
check by Maverick (right side)
Supplier already mentioned that the
grating designed to suit pedestrian load –
it is not advisable to put the equipment
on top of the grating.
Conlit Firestop Clarification of
System exposed Sealant was not clear
IFC drawing -
ATSB Shop Drawing M22010_AWP_XX_XX_4_00_DWG_010118
MEP pipes, 200mm
diameter
How’s the
connection ?

Wall to connect
apron and GIS
structure

OPTION 2
How’s the
connection
?
Wall to connect
apron and GIS
structure Wall to connect
apron and GIS
structure
To provide
dowel bar ?

OPTION 1
OPTION 2
These grating panel
need to be remove

Genset Platform B
These grating panel
need to be remove

Genset Platform C
IEC Equipment
steel base
Can adopt detail from main building ?
Structure drawing,
M22010_MAV_0_01_3_00_DWG_440013
Gridline 11 Gridline 15
SFL 18.65
MEP PIPE 18.30
Clashes with raft
slab rebar detail

MEP PIPE, 200mm DIAMETER


Proposed 600mm (H)
bundwall – not
reflected in the
drawing

Structure drawing - M22010_MAV_0_01_3_00_DWG_226000

Architecture drawing - M22010_AWP_SS_XX_4_00_DWG_015155


FALL 1:39

FFL 18.95

Section view to show apron level


Option 2
JOTUN Painting Proposal

Can refer to TQ-32 Advise Steel Structure Color Code


JOTUN Painting Proposal

Can refer to TQ-100 Final Painting Code for Exposed Steel Structures
Oil receptor sump reinforcement details
to adopt Maverick details,
M22010_MAV_0_01_5_30_DWG_410003
Oil receptor sump details
Plinth Setting Out Confirmation Sequence:

1) Pump House
2) Cooling Tower A (Gridline 7-9) CRUCIAL
3) Water Tank
4) IEC Building A
5) Cooling Tower B (Gridline 16-17)
6) IEC Building C
First Issuance Genset Trench setting
First Issuance Shop Drawing out trench
04th August 2023 08th August 23’

CSC – Karisma – First alterations to suit


the setting out propose by LCM
CSC – Karisma – 1st fabrication notice on 10th August 23’
issuance on 03rd August 2023 Got comment by AWP for grating
termination on 4th August 23’
CSC – LCM – Coordination on grating
setting out for genset trench
First coordination on grating on 12th August 23’
CSC – Karisma – Alterations grating issuance
termination w AWP on 5th August 23’
on 14th August 2023 &
CSC found the MEP opening at the
grating area CSC – LCM – OSE team coordination on
grating setting out follow up
on 14th August 2023
CSC – LCM – confirmation on the grating

setting out on 17th August

LCM – CSC – proceed to fabrication notice


CSC – Karisma – Setting out grating
on 17th August revised on 16th August 2023

LCM – CSC – PROCEED TO


FABRCATION ON 26th AUGUST 2023
CSC – LCM – Grating setting out
CSC – Karisma – proceed fabrication on the fabrication confirmation on 26th August
2023
affected grating on 18th August 2023
CSC – KARISMA – PROCEED TO
FABRCATION ON 26th AUGUST 2023
First Issuance of SD for
Building B – 18th August 23’
Request coordination for MEP
Opening

Follow up email on MEP opening


reservation on 24th August 2023

1st coordination on the grating

opening on 26th August 23’

2 panel grating affected from the


coordination meeting

CSC – Karisma – Affected grating notice

on 26th August 23’

LCM – CSC – received revised MEP Opening

issuance on 29th August 23’


78 panels grating affected from the
coordination meeting including the 2
panels previous

CSC – Karisma – revised affected grating

notice on 29th August 23’

LCM – CSC – Genset platform B grating

opening issuance on 30th August 23’


GIS Structures

Substation
GRIDLINE 11
GRIDLINE 15
Part of structure drawing,
M22010_MAV_0_01_3_00_DWG_341001
Refer Section A

1500

Refer Section A
Section A
1800

As per architecture drawing,


M22010_AWP_A_01_4_00_DWG_010105
TPO Membrane
150 120

Bolt to RC

Screed

RC

Bolt to screed
Will done by ATSB
CRANE FATAL
ZONE

BARRICADE

FATAL
ZONE
FATAL
ZONE
AREA
20% 20%

20% 20% 20%

B) Each one connection = 20%


A) One whole area = 20%
20% 20% 20% 20%

20% 20% 20% 20%

20% 20% 20%

20% 20% 20% 20%

A) One whole area = 20% B) Each one connection = 20%


(randomly picked) (all location)
1) Steel Structures (Fabricator) –
Chee Kong Engineering &
Construction Sdn Bhd
2) CIDB Perakuan Pendaftaran
3) Follow (1)
4) NDT Technician (CVs and Resume)
5) WPS put before WQT
200mm
6000mm
6000mm
200mm
200mm 200mm 200mm 200mm 200mm 200mm

200mm
slab
slab
500

Earth Mat