Blockchain and smart contract technology presentation
20 july 2022
AGENDA
What is Blockchain?
What is a Smart Contract?
Tech Pros and Cons
Some stats
Typical applications
Progesys client application
Progesys Pros and Cons analysis
2024-07-03 2
Presentation Objectives
• Present the guidelines and strategies of the commissioning process
• Using a logical sequence of activities, testing & commissioning, supported by a computerized
management system,
• All in an effort to make it operational within the requirements of security, performance and reliability.
07/03/2024 3
Project Scope
Progesys and Vendors of Autonomous Fleet will be involved totally and/or partially in the following
activities;
Start-up and Ramp-up (by Vendors & IAMGOLD Mine Operation Team)
Performance Guarantee tests and trial for operation (by Vendors and IAMGOLD Mine Operation Team)
2024-07-03 4
Project Structure
Handover
packages
(HOP) separed
by Vendor
Scope of Work
Generated
Deficiencies
WBS by list and
vendor handover
package package step
by step
2024-07-03 5
Project
Structure
•In order to assure thoroughness, all
equipment shall be grouped into systems
which are called handover packages
(HOP’s).
•For each HOP, all documentation, all
verifications and tests shall be foreseen
for each discipline.
•To assure a gradual ramp up we
subdivided the WBS (Vendor’s Package)
in HOP then subdivided in Sequences for
gradual Commissioning and Startup.
07/03/2024 6
Commissioning Process
1. Ensure that the systems and components of the plant are designed, installed, tested and capable of being operated;
3. Ensuring the transfer of the plant from the Construction team to the Operations team in an orderly and safe manner.
2024-07-03 7
Commissioning Process
Stakeholders Interaction
2024-07-03 8
Stakeholders
Interaction
The commissioning process which
applies to the way PROGESYS is going
to manage commissioning of the
Autonomous Fleet
Interaction by HOP
07/03/2024 9
Interaction by HOP (Handover Package)
2024-07-03 10
HOP Certificate
Step 1 Step 2
2024-07-03 11
Handover
Package
(HOP)
12
Progress Tracking
07/03/2024 13
Deficiency Tracking
07/03/2024 14
Deficiency Tracking
Category A: implies that the item has non-conformities that endanger subsequent activities
and include such deficiencies as those affecting health and safety or may result in equipment
damage. These items must be resolved before handover from Construction phase to
Commissioning phase.
Category B: implies that the item has non-conformities or something that needs a correction,
but that this item shall be corrected Before the end of POV, before the start of Cx (cold or hot)
Category C: Implies that the item does not have health and safety effects and will not
endanger the integrity of equipment and operation. These deficiencies shall be corrected
before the transfer to operation.
Category D: implies that the item would be a “nice-to-have” improvement on an equipment
or part of the installation. These deficiencies can be transferred to operation Closure of
deficiencies
07/03/2024 15
Project Dashboard
07/03/2024 16
Commissioning Organization Chart
07/03/2024 17
Matrix of
responsibilitie
s
2024-07-03 19
Questions
07/03/2024 20