Implementação de Rack Para Servidores
Implementação de Rack Para Servidores
FINDIV/IST
Luanda – 05 Novembro 2007
Mauro Martins
1
AGENDA
Apresentação
Contextualização
Objectivos
Público Alvo
Identificação do Problema
Solução Proposta
Equipamentos Necessários
Modelo de Instalação
Viabilidade Técnica
Estimativa de Custos
Conclusões
Recomendações
2
APRESENTAÇÃO
3
IMPLEMENTATION STATUS
• Guatemala, router missing by SGS
• Mexico, 3 sites installation initiated- 2 installs failed as DSL
could not be located on site and the FE engineer had been
denied access by SGS 1 sorted and now to be migrated, 1
being worked on, 1 stated as relocating when appoint.
announced for install to SGS, 2 sites pending on SGS
feedback, also relocating
• India, 25 migrated, 6 to install, 2 migrations on 11th July
Jamnagar, Jamshedpur, Joda, Rachur and Haldia, delayed
due to infrastructure works required for the services.
• No approval on 5 sites in Canada (VoIP) to connect to Vanco;
To be removed from Scope, CR raised
• Turkmenistan to be removed from scope via Change Request,
CR raised
4
NETWORK UPDATE
Vanco ANP
5
VANCO ANP
Vanco checks “Qualifying Circuits” against the market and looks for alternatives
6
ANP – SITE QUALIFICATION
316 369 Circuits identified = 316 Sites
Selection criteria:
Installed before 01. Aug 2006
198 qual.
Result: 198 sites qualified
125
Sites where we could
achieve savings
36 sites in LATAM
96 sites Rest of World (ROW)
7
ANP - SUMMARY OF RESULTS FOR 125 SITES
8
VANCO ANP – TECHNOLOGY CHANGE ?
currently all Datacenters (Platinum Sites) are connected with two Leased
Lines to Verizon (or ANC) Business MPLS
Point to Point Leased Lines have come came down in price, L2 VPLS networks
(ie global Ethernet) have become available.
9
VANCO ANP – TECHNOLOGY CHANGE ?
Current setup:
10
NETWORK UPDATE
SIP RESILIENCE
11
SIP RESILIENCE AS OF 15 AUGUST
MPLS
H N F
S K S Y L F
N G E K O T
G C N
INTERNET
12
FUTURE SIP RESILIENCE
MPLS
H N F
S K S Y L F
Managed security N G E K O T
Infrastructure will G C N
remain in SNG/SEC/LON
INTERNET
13
FUTURE SIP RESILIENCE
MPLS
H N F
S K S Y L F
Managed security N G E K O T
Infrastructure will G C N
remain in SNG/SEC/LON
INTERNET
Target to complete Managed Security migration is end Sep (07) – after tests
14
NETWORK UPDATE
15
GLOBAL TECHNICAL SUPPORT TEAM
(VSIP)
Frankfurt
Stefan Gottschalk
Nils Becker
16
NETWORK UPDATE
17
Service Management Reporting Apr/ May 07
Main complaints
20
VANCO SERVICE MANAGEMENT
Changes
21
NETWORK UPDATE
22
VANCO CHANGE MANAGEMENT
23
NETWORK UPDATE
24
VANCO NET- DIRECT
25
NETWORK UPDATE
IPANEMA UPDATE
26
IPANEMA – CURRENT STATUS
System Status
• all reporting set up – but to be refined after first monthly report from OBS
• OBS helpdesk operational – faults will be dealt with directly by Level 2 Ipanema agents in Nantes (France)
27
IPANEMA – CURRENT STATUS
Site Status
• Bujumbura, Dhaka, Hong Kong, Miami, Quito, Secaucus SIP – with SGS awaiting installation
• Bogota, Haiti, Lima, London SIP, Luanda, Singapore SIP – delivered to OBS, awaiting delivery to SGS
28
IPANEMA UPDATE
29
IPANEMA – NEXT STEPS
Monthly Reporting
• Will also begin in August to identify any opportunities to reduce bandwidth, either because of current over-provision or impact of optimisation
• to be carried out mid-August, prior to introducing internal support escalation and trouble-shooting
30