Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 7

Designed irrigation water volume at BGKn54

of the package 4 and drainage volume of the


package 5
Designed water Designed water
flow volume; flow volume;
Designed water flow
volume; Q=855lit/sec Q=930lit/sec
Q=83lit/sec

BGKn NEW BGKn57 BGKn54

Designed water
Intake water Intake water Intake water volume;

flow volume;
volume; volume; Q=75lit/sec

Q=750lit/sec
Q=22lit/sec Q=0

Designed water
flow volume;
Q=750lit/sec
: Main Canal

: Tertiary Canal
Culvert Ngia Syphon Road
Kawatuna
River Cross
River : Drinage Canal
Point
Issue of Design Water Flow Volume
Principle
The drainage canals is constructed for the purpose of drainage in emergencies such as heavy rain,
and it is not the purpose of surplus irrigation water drainage.

*Drainage water volume of original Gumbasa Irrigation Plan is 0.0 lit/sec

The flow capacity of the culvert Unable to flow The elevation difference between the start point
is about 780 lit/sec, and there is down the inflow and the end point of the new canal is large, and
lack of capacity to flow down the from the Ngia the flow velocity is 2 m / sec even if the energy-
planned drainage water volume.*1 River reducing work is installed. Flowing a large
amount of water increases the risk.

The designed drainage water volume should be decrease

*1:Concrete pipe with a diameter of 1 m. Calculated assuming that the flow velocity during floods is 1 m / sec.
Legend & Volume
Rehabilitation Gumbasa Irrigation Main Canal 2.9km
Secondary Canal 1.7km
System Package-5 Tertiary Canal 10.0km
New planed Canal 1.3km
Drainage Canal 3.9km

Pane
Package5 Package4 Collapsed Canal Section 1.5km

ki R
Target Paddy Fields 84ha

iver
Diversion work 3works
Syphon 2works
Culvert 2works
Des Cross Syphon 3works
i
pac gned
kag w
e4: ater
93 0 v
lit/s olume
ec of

Petobo liquefaction
Area

Issue1: Excessive drainage water volume


The design flow volume at BGKn54 point of Package 4 is 930 lit / sec, and the final flow volume at joint point
Air Port
of river Kawatuma is 750 lit / sce considering the water distribution volume in Package 5. This drainage water
volume is a constant flow rate, which exceeds the capacity of the existing drainage canal in consideration of
the drainage volume under during heavy rainfall.
Counter measure: Drainage of excessive irrigation water
e of A water discharge facility such as spillways will be constructed at the cross point of the Paneki river and the
v o l um
n ed water ec main canal to drain excess irrigation water.
Desig 5: 750lit/s
ge
packa
Issue2: Partial
Issue2: The operation
Gumbasa of the
irrigation irrigation
scheme after scheme
Package after serious
3 cannot disaster cannot
be step-by-step be done smoothly. The
restarted.
Gumbasa irrigation scheme after Package 3 cannot be step-by-step restarted.
Partial operation of the irrigation scheme after serious disaster cannot be done smoothly.
It
Thedoes not have
irrigation schemea function
does not to
havestop the irrigation
facilities water after
to drain excess the water
irrigation seriousat disaster,
key pointsparticularly
in the main in the
canal,
downstream
therefore the operation cannot be performed well until the completion of construction work of Package4 &re-
area. The completion of construction in March next year is unclear, considered with the 5.
tendering
In addition,ofthere
Package
is no4function
and thetoembankment
drain all the (JonoOge, Petobo
irrigation water area)Key
at the construction
points of theperiod.
main In addition,
canal in the
since theresuch
emergency is noasfacility
a majortodisaster
drain inexcess irrigation water,
the downstream area. the entire operation cannot be performed well
until themeasure:
Counter drainageDrainage
channel is repaired.
facilities will be installed for main canals
The watermeasure:
Counter drainageDrainage
facilities such as spillways
facilities and gatesfor
will be installed will be constructed
main canals in the main canal to drain excess
water to thedrainage
The water Paneki and Wuno rivers.
facilities such as spillways and gates will be constructed in the main canal to drain
excess water to the Paneki and Wuno rivers.
Issue1: Excessive drainage water volume
The design flow volume at BGKn54 point of Package 4 is 930 lit / sec, and the final
flow volume at joint point of river Kawatuma is 750 lit / sec considering the water
distribution volume in Package 5. This drainage water volume is a constant flow
rate, which exceeds the capacity of the existing drainage canal in consideration of
the drainage volume under during heavy rainfall.

Counter measure: Drainage of excessive irrigation water


A water discharge facility such as spillways will be constructed at the cross point of
the Paneki river and the main canal to drain excess irrigation water.
Issue2: The Gumbasa irrigation scheme after Package 3 cannot be step-by-step
restarted.
Partial operation of the irrigation scheme after serious disaster cannot be done
smoothly.
The irrigation scheme does not have facilities to drain excess irrigation water at
key points in the main canal, therefore the operation cannot be performed well until
the completion of construction work of Package4 & 5. In addition, there is no
function to drain all the irrigation water at the Key points of the main canal in the
emergency such as a major disaster in the downstream area.

Counter measure: Drainage facilities will be installed for main canals


The water drainage facilities such as spillways and gates will be constructed in the
main canal to drain excess water to the Paneki and Wuno rivers.
Request for providing data and information

• Laboratory test results of the materials and geotechnical data for the
stability analysis of the embankment structures of packages 2 and 4
(Sibalaya and JonoOge area).

• Design notes of the Package 2, 3, 4