Professional Documents
Culture Documents
IssueDrinageWaterVolume
IssueDrinageWaterVolume
Designed water
Intake water Intake water Intake water volume;
flow volume;
volume; volume; Q=75lit/sec
Q=750lit/sec
Q=22lit/sec Q=0
Designed water
flow volume;
Q=750lit/sec
: Main Canal
: Tertiary Canal
Culvert Ngia Syphon Road
Kawatuna
River Cross
River : Drinage Canal
Point
Issue of Design Water Flow Volume
Principle
The drainage canals is constructed for the purpose of drainage in emergencies such as heavy rain,
and it is not the purpose of surplus irrigation water drainage.
The flow capacity of the culvert Unable to flow The elevation difference between the start point
is about 780 lit/sec, and there is down the inflow and the end point of the new canal is large, and
lack of capacity to flow down the from the Ngia the flow velocity is 2 m / sec even if the energy-
planned drainage water volume.*1 River reducing work is installed. Flowing a large
amount of water increases the risk.
*1:Concrete pipe with a diameter of 1 m. Calculated assuming that the flow velocity during floods is 1 m / sec.
Legend & Volume
Rehabilitation Gumbasa Irrigation Main Canal 2.9km
Secondary Canal 1.7km
System Package-5 Tertiary Canal 10.0km
New planed Canal 1.3km
Drainage Canal 3.9km
Pane
Package5 Package4 Collapsed Canal Section 1.5km
ki R
Target Paddy Fields 84ha
iver
Diversion work 3works
Syphon 2works
Culvert 2works
Des Cross Syphon 3works
i
pac gned
kag w
e4: ater
93 0 v
lit/s olume
ec of
Petobo liquefaction
Area
• Laboratory test results of the materials and geotechnical data for the
stability analysis of the embankment structures of packages 2 and 4
(Sibalaya and JonoOge area).