Title - Construction Management on Waterway Tunnel
• Introduction
• Aim and Objectives
• Scopes of works
• Outlines of Thesis
• Implementation Plan
Introduction
Construction accidents are likely to cause project delays, safety management plays an
important role in a project’s timely completion.
Introduction (Continued)
There has been increasing number of studies concerning safety management in tunnel
construction.
Consider the possibility of collapse during construction which may cause significant
time and cost overruns.
Well planned investigations and evaluation of stability conditions are key issues of the
planning, design and construction activities.
Explore the most effective means for constructing tunnels for hydropower project.
Scope of Works
Tunnel length - 507.165 meters
Waterway Diameter - 8 meters
The cost and construction time optimization play important role for the sustainable and
economically favorable for construction of tunnelling work.
Outline of thesis
• Waterway tunnel can also protect water supplies from natural disasters such as
flood, and earthquake.
• Waterway tunnels have been used for many years to transport water from reservoir
to a power plant.
Implementation Plan(Continued)
• Water is transported through tunnel and used to run turbines, which generate clean and
renewable energy.
• Waterway tunnel allows for better control of the power generation process.