Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 12

1

WELCOME TO MY PRESENTATION
2
TECHNOLOGICAL UNIVERSITY ( TAUNGGYI )
DEPARTMENT OF CIVIL ENGINEERING

TIME AND COST MANAGEMENTS FOR


TWO UNITS FIVE STORIED R.C BUILDING

Title Defense
Graduation Thesis
Presented By
1 Ma
Aye Aye Soe
6C-29
3

Title - Time and Cost Management of Two Units Five Storied


R.C Building

Option - Construction Management


4 OUTLINE OF PRESENTATION

 Introduction
 Objectives
 Scope
 Methodology
 Outline of Thesis
 Implementation Plan
Introduction
5
 A construction project contain great deals, times and expense, so close
management is required if they are to be completed within a time and cost
constrains.

 A construction project is called a successful if it fulfils the requirement


regarding fitness for purpose completed on time, within budget,
profitability of contractor, absence of claim and court proceedings.

 In construction industry the main use of time cost management is to


ensure the project complete on time within budge and achieve other
project objectives.
6
Objectives

 To improve management control system of a construction project by


keeping the project on time and on budget.

 To enable one to know beforehand the cost of work.

 To manage proper planning of funds for construction.

 To reduce time & cost of construction project and help the project
to reach their predefined time and cost.
7 Scope
The purposed building is considered only the civil work of two
units five storied R.C building.

In this thesis for management is considered for foundation to


finishing work and is not included mechanical, electrical and
plumbing work.

Detailed of measurements, builder’s estimate, bill of quantity


and abstract of cost is calculated based on the local current
price.
8

Time and cost management by using Critical Path Method


(CPM) and Gantt Chart (or) Bar Chart Method by using Microsoft
Project Software.
9 Methodology
Estimating by
- Detailed of measurements,
- Builder’s estimate,
- Bill of quantity &
- Abstract of cost
Time and Cost Management by
- Critical Path Method (CPM) &
- Gantt Chart (or) Bar Chart Method by using Microsoft Project
Software
10 Outline of Thesis

CHAPTER (1) - INTRODUCTION

CHAPTER (2) - BACKGROUND THEORY

CHAPTER (3) - DATA PREPARATION AND PROCEDURES

CHAPTER (4) - ESTIMATING AND PLANNING MANAGEMENT

CHAPTER (5) - DISCUSSION, CONCLUSION AND

RECOMMENDATION
11
Implementation Plan

 Study on background theories


 Data collection and preparation
 Estimating
 Time and cost planning
 Discussions and conclusions
12