Internship Review 1
Internship Review 1
INTERNSHIP REVIEW
PRESENTED BY:
VINEET M. BAHADDURI
USN- 2KL20CV082
COMPANY DESCRIPTION
Mr. SARVESH BANAHATTI, proprietor of the organization being an educated person, having an attractive
personality and background. He has been running the business with good reputation, dignity, dedication and
devotion.
Location of Office: Plot.No.802, Kuvempu Nagar, Extn.Hanuman Nagar, Belagavi.
Location Of Site: “SAI BASAV” G+4 Apt., Malmaruti Extention Area, Beside Brahmakumari,
Mahantesh Nagar, Belagavi, Karnataka- 590016
OBJECTIVES OF THE PROPOSED WORK
To get knowledge about the implementation of the structural drawing into construction site.
To acquire knowledge about the step involving construction process.
To gain knowledge about the sequence of work to be followed in the construction of the building.
To learn and experience the on site works and challenges for self-improvement.
To develop skills to complete the tasks of projects such that the project is completed within time
The brick to be used should confirm with requirements of specification of the work. Initially, mix the mortar with water and blend it
until a smooth and plastic motor is produced.
Masonry involves the installation of building material units like stone, brick, and solid blocks, with the use the mortar as a building
material.
Brick size of 0.19X0.9X0.9m are used.
Type of bond for exterior walls is Flemish bond, whereas type of bond for interior walls is stretcher bond
Mortar (cement, sand) (1:4.5).
Curing was done for about 14 days (3 times a day).
Sill: The height between the base of the window and floor level is known as sill height.
Lintel: A horizontal beam that spans on opening, effectively distributing the weight of the structure above it to the surrounding
vertical supports in masonry wall.
Lastly, this pattern of laying bricks is used till the target height is reached.
BRICK MASONRY WORK ON SITE
FORM WORK
Formwork (shuttering) in concrete construction is used as a mold for a structure in which
fresh concrete is poured only to harden subsequently. Types of concrete formwork
construction depends on formwork material and type of structural element.
There are generally two types of formworks used commonly :
1. Steel Formwork
2. Wooden Formwork
FORMWORK AT SITE
Shuttering Process:
1. Design and Planning: - Determine the shape, size, and position of the
structural element. - Plan the type and amount of formwork material required.
2. Fabrication: - Cut and prepare the formwork materials according to the design
specifications.
3. Assembly and Erection: - Assemble the shuttering on-site. - Ensure it is
properly aligned and supported to withstand the pressure of the poured concrete .
4. Removal of Shuttering: - The shuttering shall be removed after 7 days of casting , the
shuttering plates should be cleaned and greased before placing the formwork.
5. Reuse : - Once the formwork is removed from members, they are reused for next
formwork placements.
PLACING OF REINFORCEMENT
Review Drawings: Understand rebar sizes, shapes, and positions
Organize Materials: Have all rebar, ties, and accessories ready.
Measure & Cut: Cut rebar to required lengths.
Bend: Shape rebar as per specifications in the drawings of project.
Set Forms: Ensure secure formwork.
Install Chairs & Spacers: Maintain proper concrete cover.
Bottom Layer: Position rebar per layout; tie intersections.
Middle/Top Layers: Use supports for correct spacing.
Vertical: Place and secure vertical rebar.
PLACING OF REINFORCEMENT
Horizontal: Add horizontal ties around vertical rebar.
Pre-Pour Inspection (Final Check): Ensure compliance with design and safety standards.
Tips :
Site Preparation:-
Set up formwork for the columns, ensuring it matches the design dimensions and specifications.
Materials:- Use high-quality plywood, steel, or aluminum formwork materials.- Ensure formwork is
clean and free from defects.
Assembly:- Assemble the formwork as per the column layout on the structural drawings.- Ensure
formwork is properly aligned and braced to prevent movement during casting.
COLUMN CASTING
Placement:- Place the rebars inside the formwork following the specified spacing and
positioning.- Use spacers to maintain the correct cover between the rebars and the formwork.
Pouring:- Pour concrete into the formwork in layers, typically not exceeding 1.5 meters in
height per layer.- Use vibrators to compact the concrete and remove air bubbles, ensuring no
voids are left
Curing- After pouring, cover the top surface with wet burlap, plastic sheets, or curing
compounds to prevent moisture loss.
Post-Curing Inspection and Finishing
Inspect the column for any defects or honeycombing
Repair any defects using suitable repair materials and methods.
Ensure the column dimensions and alignment are within the permissible tolerances.
COLUMN CASTING AT SITE
CONCLUSION
The internship is a bridge between the theoretical knowledge and the practical or the reality work at the
field of construction or civil engineering work.
We all who take the internship class go to companies that already working either as a consultant or
contractor.
The responsibilities of the hosting company are to teach student and shape them in the one month as a
real site worker.
My hosting company is a consultant team and they help me and friends who took the internship session
in the company in acquiring different knowledge in different position.
Since I took my internship session in the consulting side Residential Building Construction.
I get an opportunity to work in different party of the construction work which helps me to gain more
knowledge by seeing what they work in their own office and what is their main responsibilities to the
client and also each other.
THANK YOU