Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 9

Cer tification of the defense repor t

(Promotion)

Department: BD-Bangladesh
Factor y
Presenter : Wang Chenghui

Date: March 18, 2020

内部公开 INTERNAL USE, Copyright © TRANSSION HOLDINGS


1 B a s i c Pe r s o n a l
Information

Table of
Contents
2 Evidence of critical
competence

3
Contents
Achievement and
performance display

内部公开 INTERNAL USE, Copyright © TRANSSION HOLDINGS


4 Professional
contributions
一、 Basic Personal
Information (贴个人照片) (贴个人照片) (贴个人照片) (贴个人照片)
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name name name name
Date of birth Date of birth Date of birth Date of birth
name HOLDINGS
内部公开 INTERNAL USE, Copyright © TRANSSION name name name
二、 Evidence of critical
competence
Key Competencies Key Competencies
Brief description Brief description

Key Competencies Key Competencies


Brief description Brief description

Key Competencies Key Competencies


Brief description Brief description

Key Competencies Key Competencies


Brief description Brief description

内部公开 INTERNAL USE, Copyright © TRANSSION HOLDINGS


3. Per formance Achievement
Presentation - Case 1 (required)
Situations and tasks :
2018At the beginning of the year, due to the business development needs of Bangladesh and the stimulation of relevant local policies,
the company decided to build its own mobile phone assembly factory in Bangladesh, and I was transferred to the Bangladesh Regional
Department to be responsible for the preparation of the Bangladesh self-owned factory construction project.

My actions :
1. According to the factory planning, complete the list of materials and equipment requirements for construction and apply for
procurement, track the procurement of materials and equipment and arrange packaging and delivery;
2. Confirm the factory decoration plan, find the local decoration company of the corresponding module, after the quotation is
confirmed, start to formulate the contract and complete the signing, decorate according to the time node, track its progress and carry
out acceptance. ÃϼÓÀ­×Ô½¨
3. Prepare the corresponding materials and assist local colleagues to start customs clearance of materials ¹¤³§ÏîÄ¿½ø¶È¹Ü
and equipment;
4. Complete the decoration of the factory, the erection of the cable, the installation and commissioning of production equipment, and
the commissioning and operation of production auxiliary systems;
5. According to the requirements of local government policies, collect and prepare materials, and assist local colleagues to obtain
the corresponding qualifications of the factory;
6. Study the local government's policy requirements for the import of SKD materials, and sort out the standardized process of
packaging and shipping SKD materials in Bangladesh;
7. According to the organizational structure and salary framework of the factory, recruit and interview the grassroots management
personnel of the factory, and organize the training of relevant knowledge of mobile phone manufacturing business.
Make it basically reach the level of job requirements, so that the factory can be put into production smoothly as scheduled;
8. Lead the establishment and sorting of process system documents of various departments of the factory, and supervise the
implementation;
Business Results:
1. Bangladesh's self-owned assembly plant was successfully put into trial production and put into use according to the project
planning time, which provided a strong competitive advantage for the development of Bangladesh's region;
2. At present, the Bangladesh factory has an annual production capacity of 600W units, operating at full capacity, and is expected to
save nearly 150 million yuan in taxes and fees every year;
内部公开 INTERNAL USE, Copyright © TRANSSION HOLDINGS
三、 Per formance Presentation-Case 2
(required)
情境和任务:
At the end of February 2019, due to the lack of relevant documents and procedures for the disposal of waste materials by the
corresponding government departments in Bangladesh for mobile phone manufacturing plants, the waste materials reported by the
factories could not be processed and occupied the effective space of the factories.
My actions:
1. Collect India's policies and operating procedures for the electronic waste treatment of factories, and make a preliminary
electronic waste treatment process according to the actual situation in Bangladesh;
2. Visit the local tax NBR department, BTRC department and VAT department, and communicate with their relevant personnel to discuss
the preliminary electronic waste material treatment process, put forward the factory's needs for electronic waste material
treatment, explain the feasibility and interests of the process operation, and obtain the recognition of government departments;
3. Through communication and discussion with relevant personnel of BTRC department, NBR department and VAT department, the treatment
process of Bangladesh electronic waste materials was finally improved;

At the end of February 2019, due to the lack of relevant documents and procedures for the disposal of waste
materials by the corresponding government departments in Bangladesh for mobile phone manufacturing
plants, the waste materials reported by the factories could not be processed and occupied the effective space
of the factories.
My actions:
1. Collect India's policies and operating procedures for the electronic waste treatment of factories, and make
a preliminary electronic waste treatment process according to the actual situation in Bangladesh;
2. Visit the local tax NBR department, BTRC department and VAT department, and communicate with their
relevant personnel to discuss the preliminary electronic waste material treatment process, put forward the
factory's
内部公开 INTERNAL needs for electronic
USE, Copyright waste material treatment, explain the feasibility and interests of the process
© TRANSSION HOLDINGS
三、 Achievement Presentation - Case
3 (required)
Scenarios and tasks:
In July 2019, due to the policy adjustment of the mobile phone industry in Bangladesh, the existing factories
that have obtained SKD assembly qualifications need to prepare for the construction of SMT production lines
in order to continue to receive the 10% VAT tax rate concession, so they need to build SMT production lines
in Bangladesh; ÃϼÓÀ­SMT
Scenarios and tasks: ¹¤³§³ï½¨ÏîÄ¿½
In July 2019, due to the policy adjustment of the mobile phone industry in Bangladesh, the existing factories that have obtained SKD
assembly qualifications need to prepare for the construction of SMT production lines in order to continue to receive the 10% VAT tax
rate concession, so they need to build SMT production lines in Bangladesh;

Scenarios and tasks:


In July 2019, due to the policy adjustment of the mobile phone industry in Bangladesh, the existing factories
that have obtained SKD assembly qualifications need to prepare for the construction of SMT production lines
in order to continue to receive the 10% VAT tax rate concession, so they need to build SMT production lines
in Bangladesh;
Scenarios and tasks:
In July 2019, due to the policy adjustment of the mobile phone industry in Bangladesh, the existing factories that have obtained SKD
assembly qualifications need to prepare for the construction of SMT production lines in order to continue to receive the 10% VAT tax
rate concession, so they need to build SMT production lines in Bangladesh;

内部公开 INTERNAL USE, Copyright © TRANSSION HOLDINGS


4. Professional contributions
Professional
Professional contributions Professional contributions contributions
illustrate illustrate illustrate
Patents or publications Patents or publications Patents or
publications
Professional
Professional contributions Professional contributions contributions
illustrate illustrate illustrate
Patents or publications Patents or publications Patents or
publications
Professional
Professional contributions Professional contributions contributions
illustrate illustrate illustrate
Patents or publications Patents or publications Patents or
publications
Professional
Professional contributions Professional contributions contributions
illustrate illustrate illustrate
Patents or publications Patents or publications Patents or
publications
Professional
Professional contributions Professional contributions contributions
illustrate illustrate illustrate
Patents or publications Patents or publications Patents or
publications
内部公开 INTERNAL USE, Copyright © TRANSSION HOLDINGS
THANKS
Together , we can !

9
内部公开 INTERNAL USE, Copyright © TRANSSION HOLDINGS

You might also like