Resources
Resources
4 A neutral Omer The main aim of the project is • When the program
network for ozkhan,umit to minimize the duration of a is implemented
resource gulcicek (2012) project.in this study 240 using artificial
constrained projects where designed and intelligence
project programed under limited network when it
scheduling resource. The resource declines,it can
program amount of these projects are continue without
determined using three any issue by its
priority rules they are latest parallel features.
finish time,minimum slack
time,and maximum remaining
path length. The project time
are estimated using artificial
neural network and planning
and controlling is done by
using CPM.
SL NO TITLE AUTHOR FINDINGS ADVANTAGES
5 The Design Of Abdelhak The main aim of the paper is • . It can give
Cost Challal,Moham to conclude the most relevant accurate and
Estimating med method for the cost precise estimate of
Model of Tkiouat(2012) estimation in construction cost in timely and
Construction project. For that here the responsive manner.
Project. study was carried out on the
basis of literature review and
a questionnaire survey. And
explain about the different
cost estimating methods like
Analytical Method ,Parametric
Method and Analogy Method
and finally concluded that the
Analogy method for cost
estimation is more relevant
than other methods. It can
give accurate and precise
estimate of cost in timely and
responsive manner.
METHADOLOGY
Literature Review Collection
YES
Whether error acceptable
The best prediction of conceptual costs helps the project managers in taking
proactive actions for execution of sustainable construction
An ANN model can be a useful tool to assist the project managers
in predicting the conceptual cost.