Mohmand Dam Hydropower
Project
PROJECT INTRODUCTION
Mohmand Dam comprises a 213m high Concrete Face Rockfill DAM (CFRD), 5 th tallest CFRD
to be built.
02 Nos. Diversion tunnels with 15 m finished dia. and 1.7 km long each.
Gated Spillway structure with two stage stilling basins for energy dissipation.
2
Mohmand Dam Hydropower
Project
WAPDA advertised open Invitation for Bids (IFB) dated 23 November 2017 with Bid
submission date of 01 February 2018.
Bids were invited under Single-Stage Two Envelope Bidding Procedure in accordance with the
PPRA Rule 36.
Twenty Three (23) firms including international firms purchased the bidding documents.
Two bids were received up to closing date on 26 June 2018 (after extending 3 times).
3
Mohmand Dam Hydropower
Project
4
Mohmand Dam Hydropower
Project
EVALUATION OF TECHNICAL BID
Technical Bids were opened on the same day in accordance with the prescribed procedure
given in bidding documents and the Price Bids were kept under lock and key by WAPDA.
Both the Technical Bids were evaluated in accordance with the Instructions to Bidders and
Evaluation Criteria stipulated in the Bidding Documents by following main steps;
5
Mohmand Dam Hydropower
Project
6
Mohmand Dam Hydropower
Project
EVALUATION OF TECHNICAL BID
* Conditional
7
Mohmand Dam Hydropower
Project
8
CLAUSE 4.1(a) GENERAL CONSTRUCTION EXPERIENCE
FWO and PowerChina Chengdu (80% Share) failed to meet the minimum requirement.
CLAUSE 4.2(a) SPECIFIC CONSTRUCTION & CONTRACT MANAGEMENT
EXPERIENCE
Electrical and Mechanical Works
Implementation of E&M works as prime contractor, joint venture member, or Sub-Contractor in last
20 years on international projects outside their home countries and must have been satisfactory
commercial operation for the last five (05) years proven by the reference documentation of the
Employer / End User., a minimum experience in the following key activities successfully completed:
One Member must meet the requirement (can be met through specialized Sub-Contractor)
The Bidder-1 (CGGC-Descon JV) meets the minimum requirements of Eligibility and
Qualification criteria specified in the Bidding Documents and qualified for the next
stage of evaluation.
12
Mohmand Dam Hydropower
FINDINGS OF TECHNICAL EVALUATION Project
The Bidder-2 (FWO-PowerChina JV) fails to meet the minimum requirements given hereunder:
The JV Lead Member(FWO) failing to meet the Sub-Factor 4.2(a) of Section-III; (Specific
construction and Contract Management Experience) and being non-responsive in
demonstrating its managerial capacities, capabilities and experience to manage the whole
of the Project as Lead Firm, and its capability to execute 65% share of the Works as per
Sub-Clause IB 29.2 [Award] of the Instruction to Bidders, and thus did not qualify for the
next stage of technical evaluation.
2) The JV member, PowerChina Chengdu failing to meet the Sub-Factor 4.1(a) and 4.2 (a)
of Section-III, Eligibility and Qualification Criteria for Each Member, as it had not
demonstrated general construction experience and specific experience within the
documentation provided with its Bid and non provision of required documents.
13
Mohmand Dam Hydropower
Project
RECOMMENDATIONS
14
Mohmand Dam Hydropower
Project
15
Mohmand Dam Hydropower
Project
PRICE BID OPENING
The Price Bid was opened on December 31, 2018 in the presence of representatives
of the Bidder and other interested parties and recorded the followings (Annexure E of
Price Bid Evaluation Report):
(i) Verification of the correctness of the BoQ and Price Schedules extensions and
totals;
(ii) To review all priced summaries of the bid for any arithmetical error to ensure that
totals are correct;
(iii) To examine any other aspects which may affect the evaluated bid price;
(iv) To review the tables of Appendix-A to bid relating to base values of various price
indices;
18
Mohmand Dam Hydropower
Project
COMPARISON OF ENGINEER ESTIMATE & PRICE BID
19
Mohmand Dam Hydropower
Project
Based on the detailed evaluation and analysis carried out, the lowest evaluated bid
price of the only responsive Bidder (CGGC-Descon JV) came out to be
PKR 201,523,482,998.
Though the lowest evaluated bid price is about 12.92 % higher than the Engineer’s
Estimate but keeping in view the stringent requirements of bidding documents,
difficult site conditions of the project area & security concerns of the international
bidders, bid price offered by CGGC-Descon JV was considered reasonable.
20
Mohmand Dam Hydropower
Project
RECOMMENDATION BY THE CONSULTANTS
It was recommended by the Consultants that the contract for the Construction of Civil
Works including Design, Supply & Installation of Electrical and Mechanical Works and,
Provisional Sums) in accordance with the procedure laid down in the Bidding Documents
21
Mohmand Dam Hydropower
Project
The Bidder, CGGC, owing to all-weather strategic partnership between Pakistan and
China; voluntarily offered a discount of PKR 18 Billion on 18 February, 2019.
22
Mohmand Dam Hydropower
Project
THANKS
23
Mohmand Dam Hydropower
Project
24
Mohmand Dam Hydropower
Project
25
Mohmand Dam Hydropower
Project
DETIALED TECHNICAL EVALUATION CRITERIA
Evaluation Criteria.pdf
26