Monthly Highlights :
BOP IMD :- Scheduled Preventive Maintenance Completion is 100% for BOP areas.
ORT 2
7093 - TTPS Stage-IV (1 X 525 MW TPP), Tuticorin - IMD
WTP IMD:- CPU Silica and Sodium analyzer commissioned and hooked upto plc.
CHP IMD:- Stacker manual rail clamp errection completed and taken in line.
WTP IMD:- SWIP 2 faulty sump level transmitter replaced with new and errection modification and canopy protection done to prevent water ingress.
CHP IMD:- Weighbridge cross verification and inspection / calibration if required done in presence of OEM engineer.
AHP IMD:- MRHS -1 and CAC-06 compressors controllers faulty. Replaced with new controllers and programmed the same.
1 O&M SPARE 3 Way Valve Nos 01 WTP Bulk Caustic storage tank-1
2 O&M SPARE Pull Chord rope Meter 15 CHP BCN-7B 80th Switch
3 O&M SPARE Level Transmitter Nos 01 SWIP SWIP-B Sump Level
Major Issues :
1 WTP IMD :- CPU Ge plc PNS communication module for rack 6 failure resulting in opening of the CPU Bypass valve
2 CHP IMD :- 24 VDC Control plc supply tripped resulting in full downtime of CHP control system.
Improvements:
S.NO Improvements
CHP IMD :- 24 VDC separate power supply module installed in CHP RIO panel in site b as well as separate MCBs given for each
1.
marshaling panel unit to avoid un-necessarary downtime for CHP