7093 - TTPS Stage-IV (1 X 525 MW TPP), Tuticorin - IMD

11. INSTRUMENTATION MAINTENANCE DEPARTMENT

July 10, 2024 ORT 1


7093 - TTPS Stage-IV (1 X 525 MW TPP), Tuticorin - IMD

Monthly Highlights :

 BOP IMD :- Scheduled Preventive Maintenance Completion is 100% for BOP areas.

 BOP IMD :- All UPS AMC carried out.

 BOP IMD :- AAQMS AMC carried out.

ORT 2
7093 - TTPS Stage-IV (1 X 525 MW TPP), Tuticorin - IMD

Major Jobs Carried Out :

 WTP IMD:- CPU Silica and Sodium analyzer commissioned and hooked upto plc.

 CHP IMD:- Stacker manual rail clamp errection completed and taken in line.

 WTP IMD:- SWIP 2 faulty sump level transmitter replaced with new and errection modification and canopy protection done to prevent water ingress.

 CHP IMD:- Weighbridge cross verification and inspection / calibration if required done in presence of OEM engineer.

 AHP IMD:- Vertiv UPS AMC completed.

 AHP IMD:- MRHS -1 and CAC-06 compressors controllers faulty. Replaced with new controllers and programmed the same.

July 10, 2024 ORT 3


7093 - TTPS Stage-IV (1 X 525 MW TPP), Tuticorin - IMD

Consumption / Inventory Control :


S.NO SPARE TYPE MATERIAL DESCRIPTION UOM QTY USED LOCATION REMARKS

1 O&M SPARE 3 Way Valve Nos 01 WTP Bulk Caustic storage tank-1

2 O&M SPARE Pull Chord rope Meter 15 CHP BCN-7B 80th Switch
3 O&M SPARE Level Transmitter Nos 01 SWIP SWIP-B Sump Level

4 O&M SPARE PNS Module Nos 01 CPU PLC Panel

5 O&M SPARE ELGI Compressor HMI Nos 01 AHP CAC-06

6 O&M SPARE ELGI Compressor HMI Nos 01 MRHS Compressor-01

July 10, 2024 ORT 4


7093 - TTPS Stage-IV (1 X 525 MW TPP), Tuticorin - IMD

Major Issues :

S.NO Major Issues

1 WTP IMD :- CPU Ge plc PNS communication module for rack 6 failure resulting in opening of the CPU Bypass valve

2 CHP IMD :- 24 VDC Control plc supply tripped resulting in full downtime of CHP control system.

July 10, 2024 ORT 5


7093 - TTPS Stage-IV (1 X 525 MW TPP), Tuticorin - IMD

Improvements:

S.NO Improvements

CHP IMD :- 24 VDC separate power supply module installed in CHP RIO panel in site b as well as separate MCBs given for each
1.
marshaling panel unit to avoid un-necessarary downtime for CHP

July 10, 2024 ORT 6