RTN 6900 Installation Process
1 2 3 4 8

Preparation before Install antenna IF cable\grounding IF Cable clamp Antenna Alignment


installation and ODU kit installation and and route.
weather proofing
Works on
tower

5 6 7 9 10 11

IDU installation Power cable DDF installation Labels Testing Clean


installation

Works on
the ground

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT RTN6900 INSTALLATION


NETWORK HUAWEI APPROVAL DATE
PROJECT RTN MICROWAVES
PROCESS
PPE/EHS: Standard safety requirements prior to start of installation work.

SAFETY HARD HAT


GOGGLES

PASS ID
SAFETY
HARNESS

SAFETY SAFETY
BELT GLOVES

SAFETY SHOES
NOTE:

Dress the safety belt and suit.


PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL DATE
PROJECT RTN MICROWAVES
PPE | EHS
Tools to use:

NOTE:

Prepare and check these tools before


installation. All required tools should
be complete per installation team.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL INSTALLATION TOOLS DATE
PROJECT RTN MICROWAVES
MW Equipment Description

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL PREPARATION DATE
PROJECT RTN MICROWAVES
Preparation before installation for Doc checking

Note:

For detailed installation procedure, check with documents above included in the delivery.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL READING DOCUMENTS DATE
PROJECT RTN MICROWAVES
Preparation before installation for Doc checking
2
1

1. Check the design documents such as


path profile and link budgets based on
approved TSSR.
3 2. Check and read parabolic antenna
installation manual included in antenna
delivery.
3. Check and read OptiX RTN 6900 radio
transmission system-IDU&ODU quick
Design document installation guide included in the
delivery.
4. Check installation condition(place of
4 antenna\cable\IDU, power, cable rack,
earth bar, hole, indoor environment
based on approved TSSR/survey report.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL PREPARATION DATE
PROJECT RTN MICROWAVES
Preparation before install for materials checking
Goods for Outdoor
1 2 Installation

ODU accessory
case
ODU

Check the frequency IF cable


band of the ODU
Antenna

MR/DN 3
Material for Indoor Installation
Check the diameter
DDF
and frequency band of
IF board the antenna
Tributary
board 1. Check the ITEM number on the package with MR/DN including the
IDU IDU, IDU accessory package, IF board, ML1 board, E1 cable and
DDF.
2. Check whether the goods, including the antenna, ODU, ODU
accessory box, and IF cable, are consistent with the MR/DN.
3. Check whether the diameter and frequency band of the antenna,
E1 Power Ground IDU accessory the frequency band of the ODU are consistent with the design
cable cable cable packet document.
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL PREPARATION DATE
PROJECT RTN MICROWAVES
RTN6900_2+0 XPIC CONFIGURATION: With 1T1R ODU

1
XM
C- 3
EO
DU V

D U
-3E O
X MC
H
2

SLOT3 SLOT4

SLOT6
2U

1 2

SLOT1 SLOT2

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL INSTALLATION DATE
PROJECT RTN MICROWAVES DIAGRAM
RTN6900_4+0 XPIC CONFIGURATION: With 1T1R ODU

1
XM
C- 3
EO
Co DU
XM up
ler
C- 3
EO
3 DU

2 OD
U H
3E
C- r
XM u ple U
Co OD
3E
M C-
X

SLOT3 SLOT4

SLOT6
2U

1 2 3 4

SLOT1 SLOT2

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL INSTALLATION DATE
PROJECT RTN MICROWAVES DIAGRAM
RTN6900_4+0 SD XPIC CONFIGURATION: With 1T1R ODU

1 XM
C-
C 3E
X M o u p O DU
C-3 ler
EO
3 DU

2 EO
DU H
C-3 ler
XM Coup ODU
3E
C-
XM

4
5 XM
C-
C 3E
X M o u p O DU
C-3 ler
EO
7 DU

6 EO
DU H
C-3 ler
XM Coup ODU
E
C-3
XM
SLOT3 SLOT4
8
SLOT6
2U

1 2 3 4

SLOT1 SLOT2

5 6 7 8

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL INSTALLATION DATE
PROJECT RTN MICROWAVES DIAGRAM
RTN6900_4+0 XPIC CA CONFIGURATION: With 2T2R ODU

2 1

SLOT3 SLOT4

SLOT6
2U

1 2

SLOT1 SLOT2

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL INSTALLATION DATE
PROJECT RTN MICROWAVES DIAGRAM
RTN6900_4+0 SD XPIC CA CONFIGURATION: With 2T2R ODU

2 1

4 3
SLOT3 SLOT4

SLOT6
2U

1 2
3 4
SLOT1 SLOT2

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL INSTALLATION DATE
PROJECT RTN MICROWAVES DIAGRAM
Antenna and ODU Installation

1 3

2b

1. Finish the assembly of ODU and antenna


2a
on ground.
2. Use the crane lift the antenna to the top
of building(2a), or the installer on the
tower drag the rope to take the antenna
up to the tower(2b).
3. Fixed the antenna to the pole.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL OUTDOOR DATE
PROJECT RTN MICROWAVES INSTALLATION
ANTENNA HEIGHT MEASUREMENT (BASED FROM TSSR)

1. Using long tape measure, measure correct antenna heights of main and SD antennas starting from
ground (0mAGL) based on antenna height proposals indicated on approved TSSR.
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL ANTENNA DATE
PROJECT RTN MICROWAVES INSTALLATION
Antenna and ODU Installation

3
1

2
1. Install antenna in right or left location of AMB
2. Install the AMB in line with antenna
azimuth towards link up.
3. Use leveler to check if AMB is mounted in straight
position

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL OUTDOOR DATE
PROJECT RTN MICROWAVES INSTALLATION
Antenna and ODU Installation

1. Install antenna in right or left location of


AMB so side strut can be installed properly.
2. Install the AMB in line with antenna
azimuth towards link up.
3. Consider the placement of the side
strut/sway bar on the antenna off setting,
standard is 90 degrees (use tower attachment
to fasten side strut which supplied by Huawei)
1

3 2

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL OUTDOOR DATE
PROJECT RTN MICROWAVES INSTALLATION
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL SIDE STRUT DATE
PROJECT RTN MICROWAVES INSTALLATION
IF cable jumper installation
To connect with IF ports in ISM10 and ISMsa card, the IF jumper cable is required.

1. RF coaxial connector (SMA, male)


2. RF coaxial connector (type N, female)
The IF jumper is inside IF/ODU installation material.
(02234ASQ IF/ODU Installation Material(5D),RTN 6900)
1.5m

1
2

1. Connect the SMA connector at one end of the IF jumper to an IF port on the board of the
RTN 6900
2. Connect the IF jumper directly to the IF cable
Note: The bending radius of an SMA-to-N jumper must be greater than 55 mm
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF CABLE JUMPER DATE
PROJECT RTN MICROWAVES INSTALLATION
IF cable installation

1-A 1- 1- 2
B C

15.5mm

3 4- 4-B 4-A
A

4mm

5-A 5- 5- 5-
B C D

4.5mm

6-A 6- 6- 7
B C

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF CABLE DATE
PROJECT RTN MICROWAVES INSTALLATION
IF cable connector installation
1. Place the nut to the IF cable, and then strip the sheath off the IF cable
2. Place the clamp to the end of the IF cable
3. Fold back the shielding layer to the clamp. Then, place the sleeve between the shielding layer and
the insulating layer
4. Reserve the shielding layer of 4 mm and cut off the redundant part
5. Strip the insulating layer off, and obtain the inner conductor of 4.5 mm. Then, file the head of inner
conductor to the arc shape
6. Fit the IF cable in the body of connector, and tighten the body and nut with the wrenches(S=16mm)
7. Protect the IF terminal to avoid the damage during hanging

8 9 10 8. Mark the IF cable by color


tape to identify which connected
to main ODU, if it is 1+1
configuration
9. Mark the IF cable with
waterproof label(yellow) to
identify which connected to
main ODU

10. Protect the IF terminal to avoid the damage during hanging

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF CABLE DATE
PROJECT RTN MICROWAVES CONNECTORIZATION
IF grounding kit installation

1
2 1
3 2
3

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF GROUNDING CABLE DATE
PROJECT RTN MICROWAVES INSTALLATION
IF grounding kit installation
1. Determine where the grounding clip is installed on the IF cable. Strip the sheath off the IF
cable according to the length of the grounding clip
2. Fit the grounding clip where the sheath is stripped off on the IF cable, and then tighten the
screws.
3. Wrap the connector with three layers of PVC tape 3–5 cm below the connector and toward
the direction of the ODU.
4. Wrap the connector with three layers of waterproof tape 3–5 cm below the connector. The
wrapping directions of the three layers are from down to up, from up to down, and from
down to up respectively.
5. Wrap the connector with three layers of PVC tape 3–5 cm below the connector. The wrapping
directions of the three layers are from down to up, from up to down, and from down to up
respectively.
6. Wrap the PVC tape on both ends tightly with cable tie. Then, cut off the redundant bundling
tape.
7. Fix another end of grounding clamp to grounding bar and bind the grounding cable to the
tower.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF GROUNDING CABLE DATE
PROJECT RTN MICROWAVES INSTALLATION
IF grounding kit installation

Always consider 2-point


grounding system for outdoor
installations.

1
NOTE:
2 All grounding cables should
connect to bus bar

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF CABLE GROUNDING DATE
PROJECT RTN MICROWAVES KIT CONNECTION
Weather Proofing

NOTE:

1. Antenna feed horn


3 2. ODU IF cable connector
3. IF cable grounding kit.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL WEATHER PROOFING DATE
PROJECT RTN MICROWAVES
Weather Proofing
1. Wrap one layer of the connector or
grounding kit by PVC TAPE/VINYL TAPE 3. Wrap three layer of PVC tape over the three
layer of insulation tape.
Put the outdoor cable tie to bind the PVC tape on
both ends.

2. Wrap three layer of insulation


tape/rubber
tape over the first layer of PVC tape.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF CABLE CONNECTOR DATE
PROJECT RTN MICROWAVES WEATHER PROOFING
IF cable clamp and route

2
1

NOTE:
1. For outdoor use IF clamp supplied by Huawei
2. Install 1 clamp per 1 meter
3. For indoor use tie cable per meter.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF CABLE CLAMP DATE
PROJECT RTN MICROWAVES INSTALLATION
IDU Installation 1-A 1- 2
B

3-A 3- 4
B

5-A 5- 6
B

1U

IDU 910

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IDU INSTALLATION DATE
PROJECT RTN MICROWAVES
1. Obtain the IDU and ground cable.
2. Remove the two screws at the grounding point on the left of the IDU.
3. Use the removed screws to fix the ground cable to the grounding point of the IDU
4. Fix the four captive nuts to the install bar on the rack column, according to the deigned location
of the IDU.
5. Hold the IDU with both hands and push the IDU into the rack. Then, tighten the four panel screws
in a diagonal sequence. In this manner, the IDU is fixed to the rack.
6. Assemble OT terminals to one end of the PGND cable, link the OT terminal to the grounding
screw on the 19"rack.

7 9 10
8

7. Take out the boards (E1, Ethernet, and IF boards) from the package.
8. Press the ejector levers with both hands. Then, insert the board smoothly along the board track
till the board cannot move forward.
9. Push the board to ensure that the board is caught tightly. Press the ejector levers inward forcibly.
10. Tighten the two screws on the front panel.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IDU INSTALLATION DATE
PROJECT RTN MICROWAVES
Power cable installation
1
2

3 4

1. Before connect the power cables, check the input voltage. Make sure that the input voltage is
within the range allowed by the equipment. The voltage should be in the safe scope
2. Connect the power cables to the PIU board. Then, tighten the screws to fix the power cable
connector by the screw driver. If one system control board is configured, connect the two power
cables to the system control board. If two system control boards are configured, connect a power
cable to each of the system control board by PWR1 ports
3. Route the power cables from the equipment side to rectifier breakers.
4. Fix the -48V power cables(blue) and the grounding cables(black) to the air breaker and grounding
bar respectively.
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL POWER CABLE DATE
PROJECT RTN MICROWAVES INSTALLATION
Powering on RTN MW IDU
1 2

1. Before powering on the equipment, check the input voltage. Connect negative needle of the
multimeter to air breaker, connect positive needle of the multimeter to grounding point. Make sure
that the input voltage is within the range allowed by the equipment.
2. Turn on the air breaker of the power supply.
Note: DC Breaker Requirement (RTN980 MW Radio):
Note: DC Breaker Requirement (RTN950 MW Radio):
1. Directly tapped to rectifier: 32Amp/40Amp.
1. Directly tapped to rectifier: 16Amp/20Amp. 2. Using PDU: 63Amp/80Amp.
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL POWERING ON DATE
PROJECT RTN MICROWAVES EQUIPMENT
DDF Installation

TX RX

NOTE:

Customer standard is TX and RX E1 cables together in


1 DDF krone.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL DDF KRONE DATE
PROJECT RTN MICROWAVES INSTALLATION
Antenna Alignment 2-A
1
RSL Alignment Voltage Graph

4.850
4.600
4.350
4.100
3.850
3.600

VOLTAGE READING (DC)


3.350
3.100
2.850
2.600 RSL (dBm) VS. VOLTAGE (DC)
2.350
2.100
1.850
1.600
1.350
1.100
0.850
0.600
0.350
0.100
-20.00 -25.00 -30.00 -35.00 -40.00 -45.00 -50.00 -55.00 -60.00 -65.00 -70.00 -75.00 -80.00 -85.00 -90.00

2-B

1. Follow the microwave antenna alignment principle.


2. Determine the voltage values of the design receive level of
the ODU, according to the ODU RSI-Vbnc Curve and the
microwave design document. (The ODU RSI-Vbnc Curve is
delivered with the ODU).
3. For 1+1 HSB Protection, turn off the standby ODU's power
before alignment antenna. After finish alignment, turn on
the standby ODU and check the RSL.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL ANTENNA ALIGNMENT DATE
PROJECT RTN MICROWAVES
1 2-A
2-B
20V

3-B 3-
3-A C

1. Set the maximum voltage that the multimeter can detect to DC 20 V, fix the multimeter to the tower for
easy observation. Then, observe the voltage value of the receive level when you align the antennas.
2. Remove the waterproof cap of the ODU RSSI port, connect the BNC connector to the ODU RSSI port.
3. Connect the multimeter to the wire which connect the BNC connector , then protect the wire by PVC
tape.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL ANTENNA ALIGNMENT DATE
PROJECT RTN MICROWAVES
Antenna Alignment (HORIZONTAL) 2

1 Horizontal Fasten the antenna at


Adjustment remote site

Nuts that fix


the clamps

3 4
180°

1. Fasten the antenna at the remote site, align the antenna at local site.
2. On the local antenna, loosen the nuts that fix the clamps on the stand.
3. Adjust the antenna in a wide range horizontally. In this manner, the antenna is aligned roughly.
During the rough adjustment, about three peak signals can be scanned. Then, perform the fine tune
around each peak signal and compare the maximum receive level at each time of fine tune.
4. Immediately lock all involved loosened parts tightly after adjustment completed.
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL ANTENNA ALIGNMENT DATE
PROJECT RTN MICROWAVES (HORIZONTAL)
Antenna alignment (VERTICAL)
1 Vertical Fasten the antenna at 2 Bolts that
Adjustment remote site connect the
antenna and
the stand

Elevation
adjustment
bolt
3-B 4
30°

1. Fasten the antenna at the remote site, vertically align the antenna at local site.
2. Loosen the bolts that connect the antenna and the stand.
3. Rotate the elevation adjustment bolt with a wrench. Then, perform the fine tune around the receive
level peak in every vertical direction, and compare the maximum receive level at each time of fine tune.
4. When the maximum receive level is achieved, tighten the elevation adjustment bolt and side struts to
fix the antenna.
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL ANTENNA ALIGNMENT DATE
PROJECT RTN MICROWAVES (VERTICAL)
MW antenna and ODU labels

1 2

Note: Use labeler provided by subcontractor to put labels on


MW antenna and ODU

1. MW antenna label using paint (Facing Site ID, Azimuth,


Antenna height)
2. ODU label using sticker paper

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL OUTDOOR LABELS DATE
PROJECT RTN MICROWAVES
IDU Labels

HUA719-719 Strip# 1: LINK ID


9THAVEZ-GRACEPARK Strip # 2: HOP NAME
NE ID: 301 | LINK ID: 22 Strip # 3: NE ID and Link ID
Sample 10.174.200.169/29 Strip # 4: Local IP ADD
RSL: -34dBm | Tx Power: 20dBm Strip # 5: RSL and TX power levels
RX Freq: 7317 | TX Freq: 7121 Strip # 6: TX and RX frequencies

RTN 950 ET
ASS
T G
A

Note:

IDU labels should be printed using


labeler provided by subcontractor.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL DATE
PROJECT RTN MICROWAVES
IDU LABELS
IF cable labels

2
3

Note: use IF cable labels supplied by Huawei (IDU and ODU side IF cable labels should be in pair)

1. IF Cable label (ODU side)


2. IF Cable label (IDU side)
3. IF Cable Polarization (Vertical or Horizontal)
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL IF CABLE LABELS DATE
PROJECT RTN MICROWAVES
E1, Ethernet, NMS cable labels

Note: Use labeler provided by subcontractor to put labels on interface cables

1. NMS Cable Labels


2. E1 Cables Labels
3. Ethernet Cable Labels

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL INTERFACE CABLE DATE
PROJECT RTN MICROWAVES LABELS
Power cable labels

FORMAT: RTN 950 FACING SITENAME


SITE ID (B)

1 2

Note: Use labeler provided by subcontractor to put labels on IDU to rectifier power cables (IDU and rectifier
side power cable labels should be in pair)

1. Power cable labels (IDU side)


2. Power cable labels (rectifier side)
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL POWER CABLE LABELS DATE
PROJECT RTN MICROWAVES
Breaker labels
OPTION 1: AT THE BREKER COVER

FORMAT: RTN 950 FACING SITENAME SITE ID (B)


RTN 950 FAC. GRACEPARK

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL DATE
PROJECT RTN MICROWAVES
BREAKER LABELS
Breaker labels
OPTION 2: AT THE FRAME FORMAT: RTN 950 FACING SITENAME
SITE ID (B)

OPTION 3: AT THE BREAKER

RTN 950 FAC. GRACEPARK

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL BREAKER LABELS DATE
PROJECT RTN MICROWAVES
Throughput Testing

Note: With Software loop back (in loop) on remote site EG4 port. The
tester type is Viavi or Dadi
PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL THROUGHPUT TESTING DATE
PROJECT RTN MICROWAVES
Clean as you go

1. Collect the tools and excessive cables on site.


2. Clear up the equipment room and the outdoors.
3. Close the door of cabinet.

PROJECT NAME PROJECT TYPE SMART APPROVAL CONTENTS SHEET NO.

SMART MW TRANSPORT
NETWORK HUAWEI APPROVAL OBSERVED CLAYGO DATE
PROJECT RTN MICROWAVES
Thank You!
HUAWEI TECHNOLOGIES CO., LTD.
Enriching life through communication

You might also like