749911664 Internship Presentation Aarvee
749911664 Internship Presentation Aarvee
Engineers & Consultants Pvt Ltd) for giving me the oppurtunity for internship in their
Organisation.
I sincerely thank my Reporting manager Mr. Avinash Voruganti and Assistant manager Mr. Hari kiran
Sharma for their guidance,valuable advice and encouragement in carrying out this Internship . I also wish
to express my gratitude to the officials and other staff members of AARVEE ASSOCIATES who rendered
their help during the period of my Internship.
Acknowledgment
I express my deep sense of gratitude to my reporting PMO team Mr. Nukala Vivek, Mr.
Shreyash Agrawal and Ms. U Gauthami for supporting me with their valuable advice,
encouragement and guidance provided at each stage of my Internship and also I would like to
thank the HR team for the smooth process of boarding
Inception Report
Traffic survey
Alignment Report-2
Interim Report
LiDAR Survey
Alignment Design
GADs
Budget allows you to stay organized, set realistic goals, and make informed decisions
throughout the process. By carefully allocating funds and monitoring costs, you can
navigate the construction journey smoothly while staying within your financial
limitations.
Interpretation of Budget
1. Manpower
2. Outsourcing
3. Vehicle Hiring
4. Temporary Establishment at Site
5. Overheads on Manpower, Corporate and Divisional.
Manpower:
Manpower Budget is calculated through coordinating manhours
with the following departments
1. Coordination/General
2. Alignment
3. Hydrology
Interpretation of Budget
4. Geo tech
5. Structures
6. S&T
7. OHE
8. Cost estimate
9. Survey
10.Traffic Survey
Outsourcing :
Outsourcing depends on type of work, Budget is prepared by
referring necessary invoices of the work
Vehicle Hiring:
Vehicle Hiring includes the travel facility provided by the organization to the manpower, that can
be decided only referring to the manpower and their requirement
Interpretation of Budget
Post Preparation of the Budget, Managing the Budget also has the equal priority besides the
preparation of the budget. Master Budget Sheet includes major financial aspects required for the
project which are as follows:
Apart from all the management work, I was also involved in the alignment work in I worked with
Ujjain-Agar -Jhalawar. Where I worked in determining the salient feature of the stretch by using
Google earth. The feature that includes are as follows.
1. Total Length
2. No. of Curve
3. Curve Length
4. Degree of Curve
5. No. of Stations
6. River Crossing
Alignment Work
The importance of DPR can be traced by the fact that these reports
contain important pieces of information about the tasks that are
necessary for the completion of the project. The operational and
implementation process begins after the examination of the DPRs.
When it comes to the income generation for the Indian Railways Freight Corridors Plays a Major
role in Generating Income.
1. The dedicated freight corridors in India are a network of electric broad gauge freight railway
lines that solely serve freight trains, thus making the freight service in India faster and efficient.
2. The Dedicated Freight Corridor Corporation of India (DFCCIL) is responsible for undertaking
planning, development, mobilization of financial resources and construction, maintenance and
operation of these corridors.
3. In this Span of Internship I was also involved in the freight corridor base class classification for
the commodities and allocated that price to the commodities according to the kilometers
Classification of commodities done according to the Base Class by the data provided by the Indian
Railway Conference Association
Classification of commodities done according to the Base Class by the data provided by the Indian
Railway Conference Association
Project Schedule
During this period I also worked on one of the GDD projects in Australia i. e., NEW ACLAND
COAL MINE STAGE 3 MINE EXTENSION, JONDARYAN-SABINE ROAD UPGRADE
DESIGN REVISION.
1. Review of EIS, FEED and Detailed Design Reports and other outputs and confirm their
suitability for use in the design of the associated road, rail, levee, dam, pump and
pipeline infrastructure
2. Identify all of the necessary statutory approvals that will be required prior to
proceeding to the construction of the infrastructure, along with lead times for
3. Input into the consultant’s Engineering Schedule as well as project scheduling by the
client. Bill of Quantities, by the approved WBS structure for incorporation into Client
Procurement Documentation