ZTE GSM

OSS KPIS – ZTE GSM


Q4-2021 With Availability >
Region Vendor Tech BH/Day HQ KPI Name Q4 2021 Q3-2022 Q3-2022 Cleansed Value Status
99.5%
CA ZTE 2G CS BI CSSR 96.829 96.056 95.211 96.863 Achieved
CA ZTE 2G CS BI DCR 1.268 1.582 1.175 Achieved
CA ZTE 2G CS BI HOSR 96.986 96.372 97.008 Achieved
CA ZTE 2G CS BI TCH Blocking 0.934 1.185 0.84 Achieved
CA ZTE 2G CS BI SDCCH Blocking 0.428 0.631 1.446 0.349 Achieved
CA ZTE 2G PS BI UL TBF Success Rate 97.464 96.530 97.6 Achieved
CA ZTE 2G PS BI DL TBF Success Rate 98.808 98.438 98.965 Achieved
CA ZTE 2G PS BI DL TBF Drop Rate 3.752 3.988 3.465 Achieved
CA ZTE 2G PS BI UL TBF Drop Rate 7.636 12.987 5.191 Achieved

Ericsson Internal | 2018-02-21


ZTE || 2G || CS BI || SDCCH_GOS
— There was very high outage/load shedding observed after 24th April and continued till end of September
— Hence in order to have apple to apple comparison we removed all those days having TCH availability less than 99.5%
from PRE and POST values.
— After above SDCCH blocking target changed from 0.428 to 0.359.
— Secondly 20 cells have been excluded whose details are
o 6 cells are found which were on-aired in August were facing high SD Blocking and were resolved in 5 to 9 days
o 14 cells are found where expansion is required.
o Cell details are provided in slide#5

Ericsson Internal | 2018-02-21


ZTE || 2G || CS BI || SDCCH_GOS
New Target Value with Q3 Value with
KPI Old Target
Availability>99.5% Availability>99.5%
SDCCH Blocking 0.428 0.359 0.631

— Factor 1 Calculation(Excluding SDCCH Expansion Cases)

— Taking target value 0.631 in consideration


— GOS_SDCCH_NUM = 55744900
— GOS_SDCCH_DEN = 88361127
— GOS_SDCCH_NUM (Expansion Cells) = 25794200
— GOS_SDCCH_DEN (Expansion Cells) = 2631424
— SDCCH Blocking= (GOS_SDCCH_NUM - GOS_SDCCH_NUM (Excluding Expansion Cells) )

(GOS_SDCCH_DEN - GOS_SDCCH_DEN (Excluding Expansion Cells) )

=0.349
Ericsson Internal | 2018-02-21
ZTE || 2G || CS BI || SDCCH_GOS
— 21 Cells Excluded from dates where availability is greater than 99.5%

Sum of Sum of
Sum of Sum of ENPM_GO ENPM_GO Sum of Sum of
ENPM_GO ENPM_GO S_TCH_CAL S_TCH_CAL TCH_AVAIL TCH_AVAIL
Cell Name S_SD_NUM S_SD_DEN L_NUM L_DEN _NUM _DEN GOS_SD GOS_TCH Availability Comments
RUR6588B 7654200 219435 241600 19095 28300 283 34.8814 12.65253 100 New Site On-air in August. High SD GOS persisted for 9 days and then resolved.
RUR1570B 4876200 320632 2179500 61074 67200 672 15.20809 35.68622 100 Expansion Required
KNO7312B 2463400 63425 6900 11995 27900 279 38.83957 0.57524 100 High SDCCH Congestion spikes were observed but resolved after 19th September
RUR6396C 1371400 102208 182700 19653 28000 280 13.41774 9.296291 100 New Site On-air in August. High SD GOS persisted for 5 days and then resolved.
RUR6396A 1217600 108993 123100 15871 23800 238 11.17136 7.756285 100 New Site On-air in August. High SD GOS persisted for 5 days and then resolved.
RUR4388A 1143000 174715 101500 21748 58600 586 6.542083 4.667096 100 Expansion Required
RUR6588C 1079600 93408 208200 25411 29250 292.5 11.5579 8.193302 100 New Site On-air in August. High SD GOS persisted for 9 days and then resolved.
RUR4997A 1055000 121071 28600 21173 59150 591.5 8.713895 1.350777 100 Expansion Required
HWY7306C 831700 66340 118900 10031 43725 437.25 12.53693 11.85325 100 Expansion Required
RUR1286A 798400 246993 234900 25766 48775 487.75 3.23248 9.116665 100 Expansion Required
HWY7305B 504500 201939 19100 30659 71850 718.5 2.498279 0.622982 100 Expansion Required
DWA0416C 500500 113104 37700 19562 49275 492.75 4.425131 1.927206 100 Expansion Required
HWY1420C 471300 61553 50200 23013 32800 328 7.656816 2.181376 100 Expansion Required
HWY1660B 354100 160016 17800 9980 25600 256 2.212904 1.783567 100 Expansion Required
HWY0479A 268000 64346 27500 24677 41600 416 4.164983 1.114398 100 Expansion Required
TSN8720B 249700 105539 17000 20816 37600 376 2.36595 0.816679 100 Expansion Required
RUR5565B 243500 121476 360800 20633 20000 200 2.004511 17.48655 100 Expansion Required
KNO7293B 242500 121038 20300 26908 59200 592 2.003503 0.754422 100 Expansion Required
RUR0999B 242300 107445 22500 24153 43200 432 2.255107 0.931561 100 Expansion Required
RUR6396B 131700 57748 598500 20661 28000 280 2.280598 28.96762 100 New Site On-air in August. High SD GOS persisted for 5 days and then resolved.
RUR4080A 95600 32429 45600 11408 38350 383.5 2.947979 3.997195 100 Expansion Required

Ericsson Internal | 2018-02-21


ZTE || 2G || CS BI || TCH_GOS
— In August Network blocking observed which caused increase in TCH Blocking. Hence, 6th,8th and 9th August dates are
removed from POST Values
— Secondly due to increase in ducting effect, decrease in 1800 traffic is observed. Since 900 started overshooting and due to
high load on 900 TCH spikes observed
o 900 to 1800 traffic shifting not done as it will cause degradation of subcell1 to subcell2 HOSR due to coverage
difference
o Therefore in order to have apple to apple comparison same dates and days are extracted for PRE POST to calculate
impact of decrease in 1800 traffic on CSSR

Ericsson Internal | 2018-02-21


ZTE || 2G || CS BI || TCH_GOS
— TCH_GOS is degraded due to two reasons. In third quarter it degraded due to ducting impact as traffic on 1800 layer
degraded. Plus due to network blocking on Ashura days increase in TCH Blocking also observed
— Factor is applied based on exclusion of Ashura days as well as on 1800 traffic. After which target has met

Absolute KPI degradation factor with decrease in 1800 Traffic


Absolute KPI degradation with 1% decrease in 1800 traffic%

QoQ %age deccrease in 1800 Traffic%


% decrease in 1800 traffic%

Q1-22 Cleansed Value


10/17/24/28/31 - OCT

10/17/24/28/31 - JUL

Q1-22 Target Value


1800 Traffic Q4-21

1800 Traffic Q3-22

Q1-22 Raw Value


KPI Value - Post

Delta KPI Value


KPI Value - Pre
Post
Pre

ZTE KPI

%
TCH Blocking NUM 12492500 32095300 0.743 2.182 -1.439 -23.922 0.060 5293315.238 5060849.104 -4.3916 -0.264 1.104 0.934 0.840
TCH Blocking DEN 16807715 14708814
1800 Traffic 291520.4649 235244.9599

Ericsson Internal | 2018-02-21


ZTE || 2G || CS BI || CSSR
— There was very high outage/load shedding observed after 24th April Old
New Target Value Q3 Value with
KPI with Availability>99.5
so in order to have apple to apple comparison we removed all those days having Target
Availability>99.5% %
TCH availability less than 99.5% from PRE and POST values. CSSR 96.829 96.917 96.056
But our KPI doesn’t meet target values

Ericsson Internal | 2018-02-21


ZTE KPI

Availability
CSSR DEN
CSSR NUM

Ericsson Internal | 2018-02-21


— Factor 2 (Availability)

10-14 - OCT
Pre

24-28 - SEP
Post
Target still doesn’t meet by 0.406%

99.83853842 98.485142
3.86424E+22 6.24779E+22
3.7718E+24 5.99287E+24
KPI Value - Pre

97.608
KPI Value - Post

95.920
ZTE || 2G || CS BI || CSSR

Delta KPI Value


1.688

% increase in Availability%

Absolute KPI degradation with 1% increase in Availability%


-1.374214 -1.228

Availability Q4-21
99.67038195

Availability Q3-22

QoQ %age increase in Availability%


98.68686264 -0.986772

Absolute KPI degradation factor with increase in Availability


%
1.212

Q1-22 Raw Value


95.211

Q1-22 Target Value


96.829

Q1-22 Cleansed Value


96.423
Cell Name Aging Status

ZTE || 2G || CS BI || CSSR
Cell Name Aging Status
PKM8470A 91 HW Case
RUR1427C 91 Expansion Case
PKM8470B 91 HW Case
RUR5565B 91 Expansion Case
RUR4862C 91 HW Case
RUR5822B 91 Expansion Case
SHC7908A 91 HW Case
RUR3597B 91 Expansion Case
RUR0601C 90 HW Case BDW7507B 91 Expansion Case
CGT8020B 90 HW Case HWY7307A 91 Expansion Case
DKH4375B 89 HW Case AKA7572B 90 Expansion Case
HWY4077A 88 HW Case
— Factor-3 HWY0866C 87 HW Case
RUR1307C
RUR1570B
90
90
Expansion Case
Expansion Case
HWY1686C 87 HW Case RUR5565A 90 Expansion Case
ROS8700B 87 HW Case RUR5565C 90 Expansion Case
BWN2834B 86 HW Case RUR6501C 89 Expansion Case
— If we exclude 109 cells (Hardware Cases:46 || HWY3612A 86 HW Case
VHR4123A 86 HW Case
HWY7314D 89 Expansion Case
RUR5581A 89 Expansion Case
RUR5843C 85 HW Case
Expansion Cases:63), Moharram Days and 7th HWY1686B 83 HW Case
MUD7569B
RUR4388A
88
88
Expansion Case
Expansion Case
RUR0604C 82 HW Case
8th September when availability was degraded RUR5544C 89 HW Case
RUR5359A
RUR1254A
88
88
Expansion Case
Expansion Case
TLM6147A 89 HW Case
we meet the target. RUR0207B 89 HW Case
RUR2192C
RUR3178C
87
87
Expansion Case
Expansion Case
SKA8747A 87 HW Case RUR3232A 87 Expansion Case
QBW8066B 87 HW Case HWY4077D 87 Expansion Case
HWY7289B 87 HW Case QZW8000D 86 Expansion Case
HRD5640A 86 HW Case BDB7515A 86 Expansion Case
RUR1437B 86 HW Case RUR0252A 84 Expansion Case
BWN6330A 86 HW Case RUR1646B 84 Expansion Case
RUR6336A 86 HW Case RUR0321A 83 Expansion Case
— Taking target value 96.056 in consideration RUR4862B 85 HW Case MUD7569D 83 Expansion Case
CMD7218C 85 HW Case HWY3176A 83 Expansion Case
— CSSR_NUM_1 = 23840049700 RUR5533B 83 HW Case RUR1286A 82 Expansion Case
VHR4123B 75 HW Case RUR4560C 82 Expansion Case
— CSSR_DEN _1 = 240641267 BRW1639A
RUR6336D
83 HW Case
83 HW Case
HWY3612D
BHG8061A
81
81
Expansion Case
Expansion Case
— CSSR_NUM_2 = 869396655 BWN5537B 80 HW Case
RUR0678B 79 HW Case
HWY2614B
RUR4018C
88
85
Expansion Case
Expansion Case
Cell Name Aging Status
RUR5570A 77 HW Case RUR4997A 81 Expansion Case RUR1286C 80 Expansion Case
— CSSR_DEN _2 = 876228163 CGT8020C 75 HW Case RUR6171A 81 Expansion Case RUR5594B
RUR2336C
80
74
Expansion Case
Expansion Case
RUR1417C 74 HW Case RUR0604B 79 Expansion Case
— CSSR_NUM_3 = 792518710 BDW7508C 74 HW Case
CHS6071A 73 HW Case
RUR5656C
RUR6334A
78
78
Expansion Case
Expansion Case
RKT0939A
RUR4720B
74
74
Expansion Case
Expansion Case
HWY1420C 73 Expansion Case
— CSSR_DEN _3 = 804245218 BDW7506B 73 HW Case
VHR6456C 72 HW Case
RUR0336C
RUR6210A
76
82
Expansion Case
Expansion Case MHR8073B 78 Expansion Case
RUR1384B 71 HW Case HWY3748B 81 Expansion Case HWY1645C 76 Expansion Case
— CSSR = (CSSR_NUM_1* CSSR_NUM_2* CSSR_NUM_3) VHR3889C 71 HW Case RUR1384C 75 Expansion Case RUR4560D
BDW7508A
72
76
Expansion Case
Expansion Case
KNO7312A 71 HW Case RUR0116C 80 Expansion Case
(CSSR_DEN_1* CSSR_DEN_2* CSSR_DEN_3)
HRD0140A 71 HW Case QZW8007B 80 Expansion Case VHR6456A
RUR0191A
72
72
Expansion Case
Expansion Case
=96.863 QZW8010A
RUR0336A
75
74
Expansion Case
Expansion Case
RUR3818C 73 Expansion Case
RUR5758B 73 Expansion Case
RUR4497B 71 Expansion Case

Ericsson Internal | 2018-02-21


ZTE || 2G || CS BI || DCR
— DCR is degraded in Q3 due to two reasons.
1. Ducting which caused increase in DL Level Drops
2. After DL Level Drops started to improve Path Loss degraded due to which Drops remained high
— Factor is applied based on DL Level Drops and DCR is meeting value.

Absolute KPI degradation factor with increase in DL Level Drops


Absolute KPI degradation with 1% increase in DL Level Drops%

QoQ %age increase in DL Level Drops%


% increase in DL Level Drops%
28-30 - NOV/ 1-2 - DEC

Q1-22 Cleansed Value


DL Level Drops Q4-21

DL Level Drops Q3-22


28-31 - JUL / 1-AUG

Q1-22 Target Value


Q1-22 Raw Value
KPI Value - Post

Delta KPI Value


KPI Value - Pre
Post
Pre

ZTE KPI

%
Ericsson Internal | 2018-02-21
DCR NUM 19341400 27269600 1.206 1.819 -0.614 49.24922 -0.012 959881 1273276 32.64936 -0.407 1.582 96.829 1.175
ZTE || 2G || CS BI || DCR

Ericsson Internal | 2018-02-21


Cell Name Aging Status

ZTE || 2G || CS BI || HOSR
PKM8470A 91 HW Case
PKM8470B 91 HW Case
RUR4862C 91 HW Case
SHC7908A 91 HW Case
RUR0601C 90 HW Case
CGT8020B 90 HW Case
DKH4375B 89 HW Case
— HOSR has major impacted due to operational issues, where incoming HOSR is impacted due to HWY4077A 88 HW Case
HWY0866C 87 HW Case
HWY1686C 87 HW Case
increase in interference (4~5)% , Incoming Handover/Assignment failures due to Hardware issues. ROS8700B 87 HW Case
BWN2834B 86 HW Case
Hence two factors are applied. Value w/o Value with HWY3612A 86 HW Case
VHR4123A 86 HW Case
KPI Target excluding HW excluding HW RUR5843C
HWY1686B
85 HW Case
83 HW Case
cases cases RUR0604C 82 HW Case
RUR5544C 89 HW Case
HOSR 96.986 96.372 96.626 TLM6147A
RUR0207B
89 HW Case
89 HW Case
SKA8747A 87 HW Case
— Factor1 QBW8066B 87 HW Case
HWY7289B 87 HW Case
HRD5640A 86 HW Case
RUR1437B 86 HW Case
BWN6330A 86 HW Case
— HOSR excluding HW Cases RUR6336A
RUR4862B
86 HW Case
85 HW Case
— HOSR_NUM = 12099166400 CMD7218C
RUR5533B
85 HW Case
83 HW Case
— HOSR_DEN = 125215909 VHR4123B 75 HW Case
BRW1639A 83 HW Case
— CSSR = HOSR_NUM RUR6336D 83 HW Case
BWN5537B 80 HW Case
HOSR_DEN RUR0678B 79 HW Case
RUR5570A 77 HW Case
=96.626 CGT8020C 75 HW Case
RUR1417C 74 HW Case
BDW7508C 74 HW Case
CHS6071A 73 HW Case
BDW7506B 73 HW Case
VHR6456C 72 HW Case
RUR1384B 71 HW Case
VHR3889C 71 HW Case
KNO7312A 71 HW Case
HRD0140A 71 HW Case

Ericsson Internal | 2018-02-21


ZTE || 2G || CS BI || HOSR
— Factor 2 Calculation(Interference)

— Raise in interference in observed at the end of August. Hence, after 2 nd factor is used target has met.

Absolute KPI degradation factor with increase in Intf(4-5)%


Absolute KPI degradation with 1% increase in Intf(4-5)%%

QoQ %age increase in Intf(4-5)%%


% increase in Intf(4-5)%%

Q1-22 Cleansed Value


Q1-22 Target Value
Q1-22 Raw Value
Intf(4-5)% Q4-21

Intf(4-5)% Q3-22
KPI Value - Post

Delta KPI Value


KPI Value - Pre
27-31 - AUG
25-29 - DEC

Post
Pre

ZTE KPI

%
HOSR NUM 687507300 696146300 97.290 95.902 1.387 14.43027 0.096 5.975163157 6.262284151 4.805241 0.462 96.626 96.986 97.088
HOSR NUM 7066613 7258922
Intf(4-5)% 5.246633028 6.131412277

Ericsson Internal | 2018-02-21


ZTE || 2G || PS BI || DL_TBF_SR
There was very high outage/load shedding observed after 24 th April. In addition to this, an increase in payload in
July due to Eid-Ul-Azha is also observed in Quarter-3.

Ericsson Internal | 2018-02-21


ZTE KPI

PS Payload

Ericsson Internal | 2018-02-21


DL TBF SR DEN
DL TBF SR NUM
10-14 - OCT
Pre

359.083
33700810
24-28 - SEP
Post
— Factor 1 Calculation(PS Payload)

391.776
39424302
KPI Value - Pre

3328201200 3883772400 98.757


KPI Value - Post

98.512
Delta KPI Value
ZTE || 2G || PS BI || DL_TBF_SR

0.245

% increase in PS Payload%
8.344819

Absolute KPI degradation with 1% increase in PS Payload%


0.029

PS Payload Q4-21
14131.588

PS Payload Q3-22

QoQ %age increase in PS Payload%


16664.975 17.92712

Absolute KPI degradation factor with increase in PS Payload


%
0.527

Q1-22 Raw Value


98.438

Q1-22 Target Value


98.808

Q1-22 Cleansed Value


98.965
ZTE || 2G || PS BI || UL_TBF_SR
There was very high outage/load shedding observed after 24 th April. In addition to this, an increase in payload in
July due to Eid-Ul-Azha is also observed in Quarter-3.

Ericsson Internal | 2018-02-21


ZTE KPI

PS Payload

Ericsson Internal | 2018-02-21


UL TBF SR DEN
UL TBF SR NUM
10-14 - OCT
Pre

359.083
69095089
24-28 - SEP
Post
— Factor 1 Calculation(PS Payload)

391.776
64773774
KPI Value - Pre

6719957700 6267412100 97.257


KPI Value - Post

96.758
Delta KPI Value
ZTE || 2G || PS BI || UL_TBF_SR

0.498

% increase in PS Payload%
8.344819

Absolute KPI degradation with 1% increase in PS Payload%


0.060

PS Payload Q4-21
14131.588

PS Payload Q3-22

QoQ %age increase in PS Payload%


16664.975 17.92712

Absolute KPI degradation factor with increase in PS Payload


%
1.070

Q1-22 Raw Value


96.530

Q1-22 Target Value


97.464

Q1-22 Cleansed Value


97.600
ZTE || 2G || PS BI || DL_TBF_DR
There was very high outage/load shedding observed after 24 th April. In addition to this, an increase in payload in
July due to Eid-Ul-Azha is also observed in Quarter-3.

Ericsson Internal | 2018-02-21


ZTE KPI

PS Payload

Ericsson Internal | 2018-02-21


DL TBF DR DEN
DL TBF DR NUM
10-14 - OCT
Pre

359.083
27028564
97805100
24-28 - SEP
Post
— Factor 1 Calculation(PS Payload)

391.776
31236370
120635400
KPI Value - Pre

3.619
KPI Value - Post

3.862 Delta KPI Value


ZTE || 2G || PS BI || DL_TBF_DR

-0.243

% increase in PS Payload%
8.344819

Absolute KPI degradation with 1% increase in PS Payload%


-0.029

PS Payload Q4-21
14131.588

PS Payload Q3-22

QoQ %age increase in PS Payload%


16664.975 17.92712

Absolute KPI degradation factor with increase in PS Payload


%
-0.523

Q1-22 Raw Value


3.988

Q1-22 Target Value


3.752

Q1-22 Cleansed Value


3.465
ZTE || 2G || PS BI || UL_TBF_DR
There was very high outage/load shedding observed after 24 th April. In addition to this, an increase in payload in
July due to Eid-Ul-Azha is also observed in Quarter-3.

Ericsson Internal | 2018-02-21


ZTE KPI

PS Payload

Ericsson Internal | 2018-02-21


UL TBF DR DEN
UL TBF DR NUM
10-14 - OCT
Pre

359.083
48809113
373274600
24-28 - SEP
Post
— Factor 1 Calculation(PS Payload)

391.776
40769622
459749000
KPI Value - Pre

7.648
KPI Value - Post

11.277 Delta KPI Value


ZTE || 2G || PS BI || UL_TBF_DR

-3.629

% increase in PS Payload%
8.344819

Absolute KPI degradation with 1% increase in PS Payload%


-0.435

PS Payload Q4-21
14131.588

PS Payload Q3-22

QoQ %age increase in PS Payload%


16664.975 17.92712

Absolute KPI degradation factor with increase in PS Payload


%
-7.796

Q1-22 Raw Value


12.987

Q1-22 Target Value


7.636

Q1-22 Cleansed Value


5.191