Se Ppt Piplmc as on -19!09!2022-1
Se Ppt Piplmc as on -19!09!2022-1
Se Ppt Piplmc as on -19!09!2022-1
Km.25.600
Km51.600
discharge 1360 Cumecs is in
Km.69.145
Km.93.700
in Progress 55.410, km64.375 are in 2)Pampa @91.700 discharge 1390
Km.0.00
progress progress. Cumecs is in progress.
RIVER GODAVARI
Km.136.000
Km.111.000
Km.162.409
Km.93.700
MGR
1)Railway Crossing
Package No. VIII. Km.10.650 @ KM5.2
2)NH Crossing @
NEW WATER SUPPLY KM 0.850
CANAL Km.4.600
Visakhapatnam Dt
LA Not Required
Km.0.000
INDEX
PIPLMC Canal , EXISTING WATER SUPPLY CANAL
Anakapalli Dt Anakapalli Dt KBR Railway Crossing (2 No’s)
Km.162.409 Km.173.309 NH Crossing (10 No’s)
1)Railway Crossing @173.421
NEW IRRIGATION 2)NH Crossing @173.609
CANAL Major Crossings (7 No’s)
Anakapalli Dt
Km.176.209 Sarada syphon at KM
175.184
Km.177.809