FLOW DIAGRAM SHOWING NH, RAILWAY, MAJOR RIVER CROSSINGS OF PIP LEFT MAIN CANAL

1) Vinukonda Kaluva @ KM 1)Yeluru Crossing @KM 57.875


5.986 discharge 254 Cumecs 2 Nos NH Crossing (is In progress) 1) 3Nos NH Crossings at km
2)Burada kaluva@ KM 13.260 @33.559,@41.560 is 2)2 Nos of NH Crossing at KM 77.185,km88.035 & km93.700

Km.25.600

Km51.600
discharge 1360 Cumecs is in

Km.69.145

Km.93.700
in Progress 55.410, km64.375 are in 2)Pampa @91.700 discharge 1390
Km.0.00
progress progress. Cumecs is in progress.
RIVER GODAVARI

Package No. I Package No. II


East Godavari Dt & Alluri Package No. III Package No. IV
Kakinada Dt & Kakinada Dt.
Sitharamaraju District Kakinada Dt
East Godavari Dt.
.

1)NH Crossing @ KM 103.658


2)Thandava @Km 111.263
discharge 2834 Cumecs (in Varaha @ Km 138.750 (is in progress ) Mamaidivaka@Km161.544
progress) ( completed)

Package No. VI Package No. VII


Package No. V Anakapalli Dt &
Kakinada Dt. Anakapalli Dt.
Visakhapatnam Dt.

Km.136.000
Km.111.000

Km.162.409
Km.93.700

MGR
1)Railway Crossing
Package No. VIII. Km.10.650 @ KM5.2
2)NH Crossing @
NEW WATER SUPPLY KM 0.850
CANAL Km.4.600
Visakhapatnam Dt
LA Not Required
Km.0.000
INDEX
PIPLMC Canal , EXISTING WATER SUPPLY CANAL
Anakapalli Dt Anakapalli Dt KBR Railway Crossing (2 No’s)
Km.162.409 Km.173.309 NH Crossing (10 No’s)
1)Railway Crossing @173.421
NEW IRRIGATION 2)NH Crossing @173.609
CANAL Major Crossings (7 No’s)
Anakapalli Dt
Km.176.209 Sarada syphon at KM
175.184
Km.177.809