• Time : 0935H • Location : Fab’n Shop Area E at Standby Gen-Set on its Automatic Transfer Switch Connection.
www.aboitizconstruction.com an Aboitiz company
METAPHIL your construction RISQ manager
DETAILS OF THE INCIDENT
• On or about 0935H dated 31 May '10 an accident took place at fabrication shop Area E at Standby Gen-set ‘s Automatic Transfer Switch encountered a technical problem which resulted to fire.
www.aboitizconstruction.com an Aboitiz company
METAPHIL your construction RISQ manager
ATS Panelboard
www.aboitizconstruction.com an Aboitiz company
METAPHIL your construction RISQ manager
Location of damaged conductor
www.aboitizconstruction.com an Aboitiz company
METAPHIL your construction RISQ manager
Photos taken after repaired by
Maintenance
www.aboitizconstruction.com an Aboitiz company
METAPHIL your construction RISQ manager
ANALYSIS OF THE INCIDENT
• Loose contact at Automatic Transfer Switch (ATS) connections due to frequent power interruption.
www.aboitizconstruction.com an Aboitiz company
METAPHIL your construction RISQ manager
RECOMMENDED CORRECTIVE ACTION
• Maintenance team should conduct
regular checking/inspection to electrical terminal. • Bolt/screw termination must be check for tightening.