Sh Nti Tanjung Karang Report_13042023_#02
Sh Nti Tanjung Karang Report_13042023_#02
Sh Nti Tanjung Karang Report_13042023_#02
Concrete Cast Of Building Ground Slab Ongoing 1 Day Early From Schedule
P A P A P A P A P A P A P A P A
1. Excavator 1 1 1 1 1 1 1
2. Piling Machine 1 1 1 1 1 1
3. Bar Bending Machine
4. Bar Cutting Machine
5. Crane 1
6. 1 Tonne Roller
Total No of Machineries 2 2 1 2 3 2 2
NTI CO – SH TANJUNG KARANG PROGRESS REPORT #02
Weekly Report : (07/04/2023 – 13/04/2023)
5.0 Issue Arising
Critical Issues
Action/
No. Date Impact/ Effect
Description Cause Final Date
Reported
1 Pending Pak 8/4/2023 Pak Sani did not allow any Delay in Piling work S.I received on 4th April pending
Sani’s access road work on his boundary until near the housing area on the date of work to be start
shift and TNB get assurance/reply from
pole relocation Shell legal team
work
2 Pending 13/4/2023 New MVI design require Delay in Canopy Discussion has been made with
confirmation of 600mm fascia height which structure fabrication and Mht Design team and Nadi
canopy fascia hard to achieve installation Consult. No exact date to be
height conclude yet because both parties
need to study on the proposed
design
NTI CO – SH TANJUNG KARANG PROGRESS REPORT #02
Weekly Report : (07/04/2023 – 13/04/2023)
5.1 NCR Status
NCRs
Action/
No. NCR Descriptio Date Action Proposed Closing Status
Referen Reporte Non-Compliance Date
n
ce d
1
2
NTI CO – SH TANJUNG KARANG PROGRESS REPORT #02
Weekly Report : (07/04/2023 – 13/04/2023)
5.2 Cost Report – Variation Order (VO) Works
1
NTI CO – SH TANJUNG KARANG PROGRESS REPORT #02
Weekly Report : (07/04/2023 – 13/04/2023)
6.0 Handover Status
Photo Description
Photo Description
Photo Description
Photo Description
Photo Description
Photo Description