Professional Documents
Culture Documents
Cooler Pump Drain Line Modification
Cooler Pump Drain Line Modification
Objective:- To eliminate Frequent failure of Cooler Pump and Overheating of Hydraulic System.
Before:-
Drain Line of all Pumps were Merged and Connected with each other.
Due to drain line connection of all pump, back pressure was high on Cooler Pump.
Since Cooler Pump has higher rate of failure, metal chips entering to all 03 Main Pump.
Intermittent hydraulic Temperature rise.
After Modification:-
Drain Line of Cooler Pump separated from all 03 Main Pump.
In case of Cooler pump failure, Metal particle entering to all 03 main pump has been eliminated.
No back pressure on Cooler pump.
Eliminated Hydraulic over heating due to pump failure.
OMQ Division Tata Steel Slide 3
Before Modification
P3 P1
Hydraulic
Tank
Drain
Filter C.P
P2
P.P
T.P
P1 :- Main Pump 01
P2 :- Main Pump 02
P3 :- Main Pump 03
C.P :- Cooler Pump
P.P :- Pilot Pump
T.P :- Trans Pump
OMQ Division Tata Steel Slide 4
After Modification
P3 P1
Hydraulic
Tank
Drain
Filter C.P
P2
P.P
T.P
P1 :- Main Pump 01
P2 :- Main Pump 02
P3 :- Main Pump 03
C.P :- Cooler Pump
P.P :- Pilot Pump
T.P :- Trans Pump
OMQ Division Tata Steel Slide 5
Thank You