World Environment Day -2024/

Theme : land restoration


Package RI-2 to RI-8
ASOM Mala - ASRIP RI 2 to RI 8 -Eco corridors
• Project documents DPR EIA volume IV A with a cost assigned EMP for
public disclosure. Engineering interventions are planned to protect
people, vehicles, infrastructure, trees cut with compensatory
plantation, emphasis given to temporary man and machinery at Labor
camps and road works, Health and sanitation, PPE, training for
working with least disturbance to local people.
• Bank funded EIA/EMP - Implemented by Part D of contract.
• Stakeholders - PIU/ PMU review of the project with timely meetings
and PPT recording the progress of ESHS and mitigation measures.
River Boundary Protection’s : prevention of soil
erosion with geo bags. New roads and high
embankments along rivers - mitigation measures
• Rivers and tributaries flowing through the project roads are
temporarily diverted , trained and allowed to flow back through new
Major bridge, Minor bridge and culverts.
• Geobags protection of slopes create a better life for villages affected
by monsoon overflows.
• Slope protection at flooding rivers during the construction period like
Kaldiya and Tuhi rivers at RI 4 - Geo bag protection is in the
implementation stage in 2024
EMP - Mitigation measures under implementation at RI 4
- Slope protection with Geobags -Km. 2+999 and 12+600
Geo bag protection at RI 4 - Km 6 +140
• Sarthebari Patshala Road
RI 2 : Raincuts and Protection works during
construction - Monsoon influences and
mitigation
Waterbody Protection at RI 2 - Gabion wall , guiding drain to control inflow during monsoon July 2023 at RI 2.
Labor Camp Protection from Flood-RI-4 elevated ,the flooring
at lab by 1 meter as a Mitigation measure - 2024/ 2023
2023 Environmental Day celebrations RI-3//RI 8
RI-5/RI-6 – Environmental Day tree
plantation Activity
2024 : Labor camp plantations maintained -RI 4
and RI 5
ASOM Mala - ESHS Checklists for Carbon foot print, water-
footprint, and energy consumption data maintained

• Monthly ESHS MPR checklists


submitted by contractor
• Reviewed by CSC for site specific
measures.
• ESHS MPR checklists integrated
to PMU MPR ESHS
• India-Carbon footprint for
household consumption - per
capita footprint 1472 kg CO2 e
per year.
Biodiversity conservation and
mitigation measures in the Project
• RI 3 : Elephant under pass • RI 2 : Conservation of
recommended in the DPR under waterbody at Km 25+000 .
EMP. 2018 to 2020. Waterbody seen with several
• Site observations are not species of water birds like
conclusive on 3 chainages fulvous whistling teal,
recorded. cormorants, open billed storks .
• The PIU/ PMU had meetings with • Slope protection with Geo bags
Bank to consider alternative recommended at location.
methods of control with traffic
• Work in progress during May
calming measures
2024
• ROB at RI 3 may be an alternative
25+700 Slope protection work in progress ; RI 2
Environmental Monitoring - RI 2/ RI 3
Environmental Monitoring at RI 4 / RI 5
Environmental Monitoring as an indicator
to pollution during construction - RI 6/ RI 7
List of common trees under conservation -
afforestation scheme as avenue plantation
Common Name Species Common Name Scientific Name
Hoolock Terminalia myriocarpa Mango Mangifera indica
Urium Bischofia javanica Bambusa Bambusa vulgaris
Nahar Mesua ferrea Teak tectona grandis
Sumul Bombax ceiba False ashoka Polyathia longifolia
Ajhar Lagerstomia speciosa Sopa Magnolia
Som Machilus saula Gular Ficus racemosa

Gumar Gmelina arborea Cane Aundaria sp.


Sisu Dalbegia sissu Beetle nut - Tambul Areca catechua

Jutuli Altingia excelsa May flower Cassia fistula

Selkha Terminalia chebula Lagerstomia Lagerstomia sp.


Ficus Ficus pyriformis
Neem Azadhartica indica
Peepul Ficus religiosa
Location of Nesting Tree Along project road -
Biodiversity conservation

Approx.
Distance
Sr. Chainage Locatio Side from
No. n Road
edge
No. 1
1 21+300 Pahukh Left 5m
owa
No. 1
2 21+300 Pahukh Right 1m
owa
Bio-Diversity-Adjutant stork and Orange
breasted pigeon
Sericulture along the Project Road - RI 2 :
Economical benefits with better road connectivity

Sr. No. Chainag Location Side


e

Deolia
1 4+820 Left
Gobindapur

Deolia
2 5+360 Left
Gobindapur
EIA-Study of Project Road -Black Rice Cultivation
along the project road - Economic Benefits

Approx.
Sr. No. Chainage Location Side Distance
from Road
edge

No. 1
1 21+300 Left 19 m
Pahukhowa
OHS-Trainings at Labor Camp site
RI-5//RI-6
GRM RI-5