01.Safety
01.Safety
1
Approaches
Seven Steps of Safety (plant-wide) Step 7
Fully
implemented
Management initiated Self-initiated Step 6 safety
management
Step 5 Autonomous
safety standards
(*Overall
inspection of
safety levels
Step 4 Autonomous *Reevaluation if
inspection safety control)
(Predictive
General countermeasur
Step 3 inspection for es against
Analysis of safety safety Team initiated
accidents (Train and problems)
(Analysis of grow people
Setting in such a
causes) Step 2 tentative way that they
standards care for
for safety safety)
Countermeasure (Listing all
s and horizontal safety
Step 1 expansion problems)
(Countermeasur
es at the similar
areas)
Step 2 :
Identify what countermeasures can be introduced to remove the hazard and
to eradicate the source of the hazard. Deploy the countermeasures
horizontally. Bring the understanding of the risks to other parts of the
operation, where they can be used in similar areas.
Step 3 :
Set tentative standards for safety by listing all the safety problems. Prioritize
problems by severity and potential consequences.
3
Step 4 :
Make safety important to everyone. Introduce a general inspection for safety.
Remove the perception that safety is the Safety Officer’s job. Train people in
their understanding of what safety means and how they can affect their safety
Step 5 :
Autonomous safety inspection. Move to the point where everyone looks at his
or her own environment in a critical way looking for safety issues and
opportunities to improve them because those who can protect people from
accidents to happen are themselves. People should be actively looking for
ways to improve the safety of their working environment.
Step 6 :
Autonomous safety standards. Armed with an understanding of the theory
behind creating a safe working environment and the experience of carrying
out defined safety checks, the workforce can move by teamwork to defining
how it wants to set its own standards for a safe and secure working
environment.
4
Step 7 :
Fully implemented safety management system with the achievement of zero
safety incidents.
5
Classification of areas
7
STEP 1 –Model Areas Selection
ACCIDENTS
FI Index
(Accidents)
MODEL
AREA
SELECTION
8
BEFORE WCM
Prevention service – Central Entity SAE
Prevention Service –
Central Entity SAE
WCM
Nº = Number of Accidents
Completed Area
modification in
November
10
BEFORE WCM WITH WCM
ALL THE
PLANT
Detection Detection
“Root Cause
Analysis Analysis”
WCM
Countermeasures
Countermeasures
11
ALL THE PLANT
MODEL AREA
Detection - Detection form
Analysis - Report
Medications
form
Near Misses
- EWO
Unsafe Conditions
Countermeasures - Quick
Unsafe Acts
Kaizen
- Action Plan
Effectiveness Check - Safety Audit Unsafe Conditions
Charts
- Quick Audit
Check list operator
Fatalities
Lost time
injuries
Minor injuries
13
The Safety Pyramid
1 Fatality
14
Unsafe Acts and Conditions
Safety Unsafe
Conditions 23
Clearness
Cleaness
Maintenance Unsafe Acts
15
Visualization
1st Quarter ‘08
15
Step 1 : Safety matrix
To start : data of accidents, medical treatments and first aids
16
Safety matrix
Root causes of safety problems
Object
Operation
Internal factor
Operator
18
Operational method / environment
09 Standards and rules such as standard operation procedures were
unsatisfactory
10 Operation was carried out in dangerous positions (which can be resolved by
reviewing the rules)
11 The problem can be resolved by the operator’s attention
12 The problem can be resolved by improving equipment
13 Poor 5S during operation
14 Poor operational environment (noise, lighting)
15 Others
Management and supervision
16 Introductory education and training and instructions for safety standards
and rules were not carried out sufficiently
17 Poor allotment of operators (number, qualification, etc.)
18 Poor management of equipment and tools
19 Others
19
Pallet (4th level)
Reflecting Check
mirror (small)
20
Relationship between near-miss experiences and unsafe conditions
0 2 4 6 8 10 12 14 16
Lack of 5S 3.3
Poor safety guarding 2.1
Wrong materials selection of equipment 1.7
Others 8.5
22
Issues of management supervision
No. Contents
01 Insufficient or unclear safety standards/instructions
02 Insufficient setup, operational preparations
03 Poor equipment / devices, tools and instruments
04 Insufficient checking of PPE
05 Improper instructions, order and communications
06 Overlooking of unsafe acts
07 Allotment of non-qualified and not appointed operators
08 Improper allotment of personnel
09 Insufficient operational education and training
10 Insufficient education and training of safety standards and rules
11 Improper and dangerous operational plan
12 Improper operational process
13 Insufficient maintenance of equipment, machines, tools and instruments
14 Others
15 No problem in terms of management and supervision
23
Integrated
Recognition Operation
Thinking
1, 2, 3 10, 11, 12
4, 5, 6
Sentiment/
Emotion
7, 8, 9
Mental appeals
24
Classification of information processing errors in the
cerebrum
1) Errors of recognition / identification
Errors taking place from the point of recognition via decision making of
adaptive action up to the process of ordering action from the motion center
3) Errors of operation
25
Near miss report
When Who
Where How
Outline
Environment
There are
There are There are There are
problems with
problems with problems with problems with
tools and
Equipment environment
equipment
procedures operators
1
Operation
Operation 2
3
4
Operator 5
6
7
8
9
Findings of the location of
problems in environment, 10
11
equipment, procedures and the
12
operator 26
Subjective mental appeals based on the functions of
mind and body
1) Recognize the (1) Could not see (hear)
situation
(2) Did not notice
(3) Did not remember
27
Unsafe acts
No. Contents
01 Could not see very well
02 Could not see at all
03 Could not hear very well
04 Did not notice
05 Overlooked
06 Could not recognize (misheard)
07 Forgot (could not remember)
08 Misremembered
09 Was aware, but forgot to do
10 Did not know
11 Did not understand
12 Was not aware of the important critical points
13 Was not careful enough
14 Took it easily
15 Did not grasp the problem (fact) properly
16 Anticipated wrongly
17 Thought it OK 28
No. Contents
No. Contents
01 Regular production operations
02 Regular inspection/repair
03 Restoration operations which do not take place ver often, can be predicted to some e
xtent and have already taken place in the past
04 Restoration operations which do not take place very often, cannot be predicted nor
have taken place in the past
31
Classification of incidents
No. Classification Contents
01 Fall / sliding down An operator falls down from the scaffold or slides down the installment
02 Fall down An operator tumbles down by tripping or stumbling
03 Crash An operator crashes into hanging items or machines
04 Come flying / drop Items come flying over operators or drop down on operators
05 Being crashed A hanging item or a part of a driving machine crashes into an operator
06 Caught in / rolled Being caught in or rolled up into a machine, etc., an operator gets injured
up
07 Cut / rubbed out An operator gets cut or rubbed out by edged tools or the handling product
08 Contact with hot or Contact with hot or cold temperature by fire, arc, welding metal, hot water or
cold items steam, etc., hot or cold environment
09 Contact with Exposed to radiation, carbon monoxide poisoning, oxygen deficiency disease,
harmful items etc.
10 Electric shock
11 Explosion
99 Others
32
Degree of risk
No. Contents
01 The risks which may have caused serious disasters or serious physical damages
02 The risks which may have caused a lost time accident excluding the ones under (01)
03 Minor accidents excluding (01) and (02)
33
Rate
0 2 4 6 8 10 12 %
Overlooked 8.4
34
0.0
10.0
20.0
30.0
40.0
(%)
Crane
Transportation
vehicles
Recognition
General power
driven machines
Furnace
Cars
Memory
Slinging work
Manipulation of tools
Gas welding
Thinking
Electrical welding
Assembly
Repair
Value/emotion
Inspection
Cleaning
Walking
Others
35
Operation
0.0
10.0
20.0
30.0
40.0
(%)
Fall/sliding down
Recognition
Fall down
Crash
Come flying/drop
Memory
Being crashed
Caught in/rolled up
Thinking
Cut/rubbed out
Contact with
harmful items
Value/emotion
Electric shock
Explosion
Others
36
Operation
Causal analysis of subjective mental appeals from the viewpoint of man, operation and machine &
environment and items
37
Subjective mental Man Operation Machine, environment, items
appeals
(4) Did not know • Don’t have the knowledge • It is not easy to grasp the • Don’t know the structure of
of the job procedures/critical points of equipment and its functional
• Don’t have enough skills of the job. performance.
the job • Don’t know how to do
• Did not know the rules of visual inspection.
the job. • Don’t know how to cope
with troubles.
(5) Did not pay • Since it was a routine job, • It was the job which did not
attention did it without much thinking. require much thinking.
• Was tiresome to think. • Relaxed my attention
• Did it instantly. because it was a simple job.
(6) Thought it would • Too confident of the job • I have had no experience
be OK • Counted too much on my of getting injured.
past experience. • Referred to the way of my
• Did not think it would be senior, it was dangerous.
dangerous to violate the rules. • Kept on doing the job until
I got scolded.
38
Subjective mental Man Operation Machine, environment, items
appeals
(7) Was confused • Have the habit of getting • Get panicked when a
confused. trouble takes place.
• Got confused when the
superior rushes.
• Tend to forget critical points
in a tense situation.
(8) Was irritated • Was reluctant to do the job. • No reflection of my opinion
• Was not confident of the to the job instructions.
job. • Cannot work in a friendly
• Was not worth doing the atmosphere with other team
job. mates.
• Had words with somebody.
• Had no mind to do.
(9) Was tired • Was not in a good physical • Cannot get on well with • The working environment is not
condition. other team mates. good. (high temperature, noise,
• Was not in a good mental • Cannot continue to keep dust)
condition. attention for a long time. • The job content is too much big
• Was tired physically. • Cannot engage in heavy for one operator.
manual labor work for a long
time.
39
Subjective mental Man Operation Machine, environment, items
appeals
(10) Unconscious • Did the job reflexively since • Repair was needed to be • Urgent repair was required.
deed it was a routine job. done in a hurry.
• Did the job because I was • The superior pushed me to
in a hurry. hurry up to do the job.
• Was in a habit of doing the
job without much thinking.
(11) Was not easy • Did not know how to do the • The work routine was not • Operationability of the equipme
to do job. standardized. nt was not designed in
• Lacked in practice. • Did the job in “my own • Standard operation procedures
• It was difficult to do the job. way”. are not very well established.
• Could not cooperate with
other team mates very well.
(12) Lost the • It was a very unnatural • Did not use a safety belt. • Poor foothold.
balance of the body posture. • Being in a hurry, forced to • The work space was too small.
• Being old, it was impossible do the job in a very difficult
to do the job. posture.
• There was a difficulty in
the operational method.
40
Medical checkup, measurement of physical strength
Learning activity
Operation
Recognition Integrated thinking
Behavior training
Practice
Emotion
Review of SOP
se
ur
ed
1
oc
t
en
3
pr
on
m
in
ti
of
e
ce
n
au
1
dg
ai
0
en
ec
ec
tr
ju
lig
sp
pr
of
of
eg
re
ck
ck
r
ro
N
of
La
La
Er
ck
La
Actions
42
Visual Management
MODEL AREA
43
PPE
In front of each work place where it’s possible to use compressed air, a trust
warns the worker to dress protective glasses for accident prevention.
44
44
PPE
100% of Plant
Workstations are
monitored
45
45
Confined Spaces
ES
AC
S P
ED
FI N
ON
C
46
46
Step 3 : Legal Compliance: risk evaluation
Risk Cecklist •mechanical
Matrix 13 Health Risk risks
Categories •electrical risks
Extend of losses •hazard materials
• …..
Probability
Risk Analysis
Assembly
Workplace
Load
Gender Calculation
Posture
Implementation Result
conditions
48
Risk Analysis - Noise and Explosive Atmosphere
Noise
Explosive Atmosphere
Measurements and
Documentation TÜV – Report
Internal
Documentation
Noise Map
Improvement Plan
Detail information
of Machines Risks
Skin contact
Definition
of the Protection
Working Instruction
Level
51
Dangerous Materials Management
New Safety Data Sheet ÜBERPRÜFUNG EINES NEUEN SICHERHEITSDATENBLATTES
NEW Request
PBA - Arbeitssicherheit Datum: 17.07.06 Bearbeitet von: Richter
Antrag für
noch nicht genehmigten Stoff - im Einsatz seit: Änderungsantrag für neues SDB
einen neuen chemischen Stoff
Versuchszwecke (einmalig)
einen bereits genehmigten Stoff für einen weiteren Arbeitsplatz Teilenummer :
Bei der Tätigkeit verwendete Menge pro Mitarbeiter und Tag (Mengengruppe)
g – Bereich oder ml – Bereich niedrig
kg – Bereich oder l – Bereich mittel
t – Bereich oder m³ Bereich hoch
Dauer der Tätigkeit
Unterschreitet die tägliche Zeitdauer beim Umgang 15 Minuten? ja nein
Anwendungstemperatur
52
External Company (“Contractors”)
Contractors Safety
Italian Law (Art. 7 D.Lgs. 626/94)
53
53
Lock Out
The objective of a Lock Off-Out procedure is to ensure that no injury occurs through the energising or
movement of equipment or through contact with sources of energy. 100% of Termoli Plant Work
Station & Machines is under Lock-out procedure
Plan activity
plan activity
S.O.S.
J.E.S.
54
54
Step 4 :Audit System
An integrated system of audit has been developed in TERMOLI Plant. The system
consists in personalized check list for each organizational level or role ( Plant Manager,
Area Manager, Supervisor, Team Speaker and Worker).
AP UR DO CI TE SDS I VP E RR OI F ICC EA TS I OS NO
F R EQ U EN ZA
V e rro n e P la n t - U n it à C a m b io ( A( uAt ou v tao luv t a zl ui o tna e z ei o/ on ve e Sr i fui c pa e Rr v. S i s. P o. Pr ). ) M E N S IL E
A R G O M E N TO : P R E V E N Z IO N E IN F O R T U N I E IG IE N E D E L L A V O R O
R IF E R . N O R M A T IV O : D . P . R . 5 4 7 / 5 5 , D . P . R . 3 0 3 / 5 6 , D . L g s . 2 7 7 / 9 1 , D . L g s . 6 2 6 / 9 4 e s u c c e s s iv e m o d ific h e e d in t e g r a z io n i.
U T E /A R E A 5 L A V O R A Z IO N E S U P E R F IN IT U R A P O S T -T .T . A L B E R I / C O R O N E / IN G R .C .T T O A U D IT N ° D A T A : 2 7 .0 4 .2 0 0 7
PLANT
to ta le v o c i v o c i n o n c o n fo r m i in d ic e d i c o n fo r m ità
c o n s id e r a te (T V ) n. p e s a te IC = 1 0 0 - (T P / T V x 1 0 0 )
g ra vit à 1 1 0
g ra vit à 2 0 0
MANAGER
21 9 5 ,2 4
g ra vit à 3 2 1
t o t a le p e s a t o (T P ) 1
UNIT
L E G E N D A A T T R IB U Z IO N E G R A V IT A '
P r io r ita ' Q uando E ' d a rim u o v e re :
- P u o ' e s s e r e p r o b a b ile c a u s a d i e v e n t o in fo r t u n is t ic o . S U B IT O a d o t t a n d o le n e c e s s a r ie
- P u o ' e s s e re p ro b a b ile c a u s a d i p ro b le m i a m b ie n t a li e / o c a s i d i m a la t t ia m is u re t e c n ic o / o rg a n iz z a t ive / p ro c e d u ra li
MANAGERS
FIAT
1 Powertrain Technologies p r o fe s s io n a le . p r o v v is o r ie e / o d e fin it iv e .
PREVENZIONE INFORTUNI E IGIENE DEL LAVORO
- E ' g ia ' s t a t a c a u s a d i e v e n t o in fo r t u n is t ic o o e v e n t u a le in c id e n t e .
- E ' u n a t ra s g re s s io n e a d u n a n o rm a t iva d i le g g e c h e p u o ' c o m p o rt a re
g ro s s e re s p o n s a b ilit a ' d i t ip o p e n a le (p e n a d e t e n t iva o p e c u n ia ria ).
UTE 5 AREA SUPERFINITURA
- A t t ivit a ' g ia ' m e s s a in a t t o s o s t a n z ia lm e n t e m a d a c o m p le t a re . A B R E V E a d o t t a n d o le n e c e s s a rie Data 27/04/2007
- N o n p u o ' e s s e r e c a u s a d i e v e n t o in fo r t u n is t ic o . m is u re t e c n ic o / o rg a n iz z a t ive / p ro c e d u ra li
2 Verifica esecuzione
- E 'u n a t r a s dag r e sparte s i o n e del a d uTeam
n a n o rSpeaker
m a t i v a d i ldel
e g g controllo
e c h e n o n giornaliero
p u o ' c o m p o r previsto
ta re sulla singola
p r o v v Operazione;
i s o r i e e / o d e f i n verifica
it ive . dell'avanzamento delle azioni relative presenti
r e s p o n s a b i l i t a ' d i t i p o p e n a l e .
nell'Action Plan Quality + Verifica esecuzione da parte dei Team Members dei piani di Manutenzione Preventiva (Sicurezza, Qualità, Ambiente, Manutenzione)
- P re s e n z a d i m is u re a lt e rn a t ive p ro vvis o rie
SUPERVISORS
- D a m ig lio ra re / a g g io rn a re A p p e n a p o s s ib ile e / o c o n c o s t a n t e
3 OK
- C o n d iz io n i g ia ' s o d d is fa c e n t i m a d a m ig lio r a r e . NON OK m ig lio ra m e n t o .
Resp. Area
pr. 1 2 3 Respons./tempist.
TEAM SPEAKERS
1 Il Team Speaker X NON ESEGUITE SV
ha effettuato regolarmente le
attività di audit nelle aree di sua
competenza?
2 I Team Member/Team Speaker hannoX
The Plant Manager, Unit Manager, Supervisors perform Safety audits independently,
following their audit planning. The upper level checks the respect of the safety rules of the
lower level, by filling the audit form, that is personalized according to the specific
responsabilities about safety of each level.
55
55
SAFETY EVERYDAY
MODEL 03/05/2008
AREA UNIDAD OPERATIVA MONTAJE
Head
Stock Manager,
Rod.
Banco
Rod.
Fren.
Sup.
1st
Revision
Inf.
line
Repar. Managers
Mecc.
Elect. Ripar.
Rev. Prueba
Estet. Agua
Carro. Chapa Pint. Delib.
Falta
Mater.
Defec.
Audit
Q
Total
Budget 10 2 2 2 2 6 2 2 2 4 16 4 4 4 4 4 12 82
GIRO 21 2 2 2 2 3 2 2 2 2 7 1 0 1 2 12 0 63
Δ 11 0 0 0 0 -3 0 0 0 -2 -9 -3 -4 -3 -2 8 -12 -19
IN THE
Q
1
DAILY
2
MEETING WITH WORKERS
0
2
GOLPES PEQUEÑOS
21 4 4
ACCIDENTES/MEDICACIONES
Chapa
AT THE BOARD: 0
DAVID FERNANDEZ DE LA CALLE se corta con bastidor
0
56
Plant Smat Audit System
57
Prevention Audit
Responsib Activity Frequenc Tools People
le y involved
RGI Order and Clean Every two Audit form Team expert
Preventive verification weeks Operators
Service
RGI – SAFETY TEAM Unsafe conditions Every two Audit form Team expert
monitoring weeks Operators
Unsafe Acts Every two Audit form Team expert
monitoring weeks Operators
Action Plan Every two Action Plan RUO, Mto,
Monitoring weeks Meeting safety TGI, TUO
PLAN DE ACCIÓN DE SEGURIDAD G.I.LATERALES Nº Acciones 114
(1)
Nº Origen Zona Problema Acciones Responsable Prioridad (2) Entrada Prevista Estado (3)
22 AB P.35/37 SUELO CON BACHES, RIESGO DE CAIDA TAPAR BACHES I.FERNÁNDEZ 2 4-10-07 8-10-07 COMPLETADA
PELIGRO DE TROPIEZOS Y MOLESTIAS
G.I.LATERALE
27 AB EN EL TRABAJO CON LOS BIPOLARES Y CORRECTO ACOPLAMIENTO DE LAS MISMAS MANTENIMIENTO 3 25-10-07 CONTINUO COMPLETADA
S CABLES DE CORRIENTE
RIESGO DE PROYECCIONES EN ISLAS POSICIONAR PLASTICOS EN LAS ZONAS DONDE SE CUELAN LAS
30 AB P.25 Y 31 ROBOTIZADAS PROYECCIONES
R.G.I. 3 26-10-07 18-1-08 COMPLETADA
G.I.LATERALE TROPIEZO CON BISAGRAS EXISTENTES ELIMINAR LAS BISAGRAS O PONER PROTECCION PARA QUE NO
31 AB I.FERNÁNDEZ 3 24-10-07 26-1-08 COMPLETADA
S AL NIVEL DEL SUELO EXISTA PELIGRO DE TROPIEZOS
PELIGRO DE RESBALAR EN ZONA DE
32 AB P.25 Y 31 ENTRADA A POR LOS LATERALES
PINTAR LA ZONA CON PINTURA ANTIDESLIZANTE I.FERNÁNDEZ 3 25-10-07 21-12-07 COMPLETADA
G.I.LATERALE PELIGRO DE CAERSE LA PINZA POR INSTALACIÓN DE CADENAS DE ACERO DE SEGURIDAD PARA
36 AB MANTENIMIENTO 3 26-10-07 30-11-07 COMPLETADA
S ROMPERSE EL ENGANCHE DEL BIPOLAR EVITAR ESE PELIGRO
MOSQUETÓN DESGASTADO SE SUELTA COLOCAR DOS CABLES DE ACERO PARA EVITAR LA CAIDA DE LAS
71 AB P.24
DE LA PUNTATRIZ MAQUINAS, Y REVISION DE TODA LA UNIDAD OPERATIVA
G.SERENA 1 24-1-08 27-1-08 COMPLETADA
58
Specialists Audit
The safety members audit
each ETU every four AUDIT DI PROCESSO
FIAT GROUP Automobiles S.p.A.
Manufacturing Cassino Plant
( Autovalutazione e/o verifica R.S.P.P. )
months, through this form. ARGOMENTO: PREVENZIONE INFORTUNI E IGIENE DEL LAVORO
RIFER. NORMATIVO: D.P.R. 547/55, D.P.R. 303/56, D. Lgs. 277/91, D. Lgs.626/94 e successive modifiche ed integrazioni.
2) Inquiries about accidents Con indice di gravità (IdG) = 1 moltiplicare x 1,5; con IdG = 2 moltiplicare x 1; con IdG = 3 moltiplicare x 0,5.
4) Ergonomy
- Attivita' gia' messa in atto sostanzialmente ma da completare. A BREVE adottando le necessarie
- Non puo' essere causa di evento infortunistico. misure tecnico/organizzative/procedurali
2 - E'una trasgressione ad una normativa di legge che non puo' comportare provvisorie e/o definitive.
responsabilita' di tipo penale.
- Presenza di misure alternative provvisorie
- Da migliorare/aggiornare Appena possibile e/o con costante
6) Safety Devices
7) Transport
14) Routes
2) Safety Devices
3) Routes
7) Prevention Diary
10) Ergonomy
11) Transport
Issues
1) Safety Devices
2) Equipment integrity
4) Routes
61
Team Member & Lift Truck Driver
62
62
Evolution of the Safety Actions in Model Areas
29
AI
Preventive Actions Reactive Actions
70
60
Nº Actions
50
40
30
20
10
8
00
0
7
08
,2
00
20
ch
.2
n.
ar
ov
Ja
M
N
OK / KO
Before starting
PPE’s state
64
Step 5 – Autonomous inspection
Unsafe Conditions Charts
MODEL AREAS
Easy tool for every worker
Unsafe
Condition
Nº unsafe conditions
Worker’s name charts
and workplace
115
Help to identify and classify unsafe
conditions
Solution suggestion
65
Step 5 – Autonomous inspection
Example Unsafe Conditions Charts
MODEL AREA
66
Safety Improvement - EMPLOYEES SUGGESTIONS
“Blowing Box”
AFTER
BEFORE
Noise Reduction
Spraying Reduction
DATA
N.RO NC/NM DESCRIZIONE UTE SEGNALAZIONE Sol. TEMPORANEA Sol. DEFINITIVA
ACTION
002 NC pedane
RIPRISTINO SICUREZZA
PLAN
RIPARI OP 55 NON OK 101 12/02/2008
Sostituzione dei
alc uni armadi hanno le porte aperte 101 25/03/2008 c hiudere le porte
007 NC dispositivi di protezione
ripari op 120 non fissati perfettamente 102 28/01/2008 Rec intare l'area c on del nastro
Ripristinare i ripari
010 NC
op.60 pavimentazione sc ivolosa dovuta intensific ato c ic lo pulizia
Check
102 19/02/2008
allo sversamento di lubrorefrigerante pavimentazio
011 NC
apporre delle saldature
c operture c anale refrigerante deformati 102 29/02/2008 per garantire c he non si
012 NC sollevino c on il passaggio
013 NC
OP. 60 ECCESSIVA NEBULIZZAZIONE OLIO
DA
102 07/03/2008
INTENSIFICAT E PULIZIE
APERTO CANTIERE
Activity Progress
NOT
Solved
Solved
68
68
LWDC ETU – n° YEARS without Accidents
1
2 Y
3 E
Y
4 Y E A
5 Y E A R
Y E A S
R
E A R S
A R S 80%
R S
S 76%
72%
We have a ETU with
44%
without LWDC
69
69
External Benchmark
Benchmarking ….
Indice LWDC (12 mesi rolling) = n°eventi x 100.000
Ore lavorate
0,50
0,42
0,40 0,36
ENGINE PLANT
0,31
0,30
0,28
LWDC
0,20
0,20 0,17 0,16
0,10
0,00
0,00
70
70
LWDC – n° YEARS without Accidents
The whole
Engine 16V
e s
l v s &
4 years
e
Va a lv
1 6 V2 milions
8
hours of work
without
LWDC 71
71
PILLAR Activities
35
30
25
Taux de fréquence
20
15
10
0
lt é n a lt E S y s it C s s e x) le x ia A n E di ia n di ta lé l in
rau ant com afr a col nau s S com SA ine erie fed SN zbu trie o up au vil vau r ec PS g e M Au r ec ag e Au yo per sou ma
lle s le s a e e r o
lé n ch tt S N lie u s r d e l le ci u a
w T M u w o
t im Ve de
te e la té oc R n g e té ody Pé ba p p SO He ind T G bor Be PE Fa ks Fa lks u r
hâ d ce c A c m T u N s I A ( E N ol
v o Q SA Co
C ité a n m F r I
li eo a n er iu F K H iro
n F A NP C V
DM
P F
re l to r F
r
v al Fr Th in SA en TC G C M C P ED
a au um ss U t - N
M
ti ute Al Th
y H
ai
n S
e
n a a n S
c
ag h Al 1
M
Organisations
72
PILLAR Activities
1
0,9
0,8
0,7
Taux de Gravité
0,6
0,5
0,4
0,3
0,2
0,1
0
Organisations
73
PILLAR Activities
• The actions to improve our level Assis au fond de la chaise, les mains posés à l’intérieur des cuisses.
2 – Health campaign
We have realized specific training
about healthy ways of working
Health of our employees is very important not only at work but also at home
75
PILLAR Activities
Alcool
76
TARGETS AND ACTIONS
NEXT TARGET: