Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 10

B A J A J I N S T I T U T E O F T E C H N O L O G Y, WA R D H A

Electrical Engineering Department


Final Year Project Phase I (Academic Session 2023-2024)
Topic Finalization

GUIDED BY- Dr. HARSHIT DALVI


Group Members
Chaitanya Mangrulkar Rohanshi Gawande(Team leader) Group No. 5
2046491293015 2046491293043
Pallavi Pimpalkar Vedanti Ingole
2046491293035 2046491191037
Surbhi Ambade Sankalp Bhore
2046491293052 2146491293501
Date :- September 7th , 2023
Time :- 4:30 Pm
MINISTRY OF COIL

PROBLEM
STATEMENT
A system of IoT Devices to prevent under-loading/overloading
of Railways wagons.

Organization :- Ministry of Coal

PS number :- SIH1313

2
Domain :- Transportation & Logistics
MINISTRY OF COIL

CURRENT
SCENARIO
•Coal India Limited(CIL) supplies coal by rail through railway sidings.

•Railway wagons at sidings are loaded by payloader under contractual arrangements.

•Contractual loading often leads to overloading or underloading of wagons.

•Purchaser is responsible for paying penalties for overloading.

•In 2021-22, under-loading expenses were Rs 593 cr., While loading contract cost was Rs. 276
cr.
3
OUR PROPOSED SOLUTION
MINISTRY OF COIL

• Install weighbridges or rail scales at a designated location on the railway track.

• These devices can accurately measure the weight of coal trains as they pass over them.

• Connect the weighbridges to a data collection system. This can include load cells, sensors, and a
data acquisition system to capture weight data in real-time.

• Identify the destinations or loading/unloading points.

• There are some areas where we install the weighing system initially.

• Set up weighbridges or rail scales at these selected locations. Ensure they are strategically placed

4 to capture accurate weight measurements.


OUR PROPOSED SOLUTION
MINISTRY OF COIL

SECURITY ISSUES AND IOT BASED SOLUTION


WA S TA G E C A N B E F O R A U T O M AT E D
H I G H LY P R E V E N T E D . SYSTEM.

5
REVENUE OF RAILWAYS
MINISTRY OF COIL

6
OUR SOLUTION IS
VIABLE IS TERMS OF

Theft Automation
Economical Durability
protection
COMPARISON OF
MINISTRY OF COIL

ADVANTAGES
EXISTING SYSTEM NEW SYSTEM

Manually handled system Automated system


No data acquisition provided Data acquisition provided
No theft protection with high accuracy Theft protection with high accuracy

8
MINISTRY OF COIL

6 T H S EP 22ND SEP- 1 S T O C T- 2 0 T H O C T- 15TH NOV


Seminar 30TH SEP 20TH OCT 15TH NOV
Finalizing and Assembly of Final Testing Report finalization
gathering the components
components

TIMELINE
9