1 2 3
Thar Coal
Coal Identified Area 9100 Sq.Km
Coal Reserves Depth 155-200 Meter
Total Estimated Coal Reserves 175 Bn Tons
Coal Seam Thickness 24 Meter
Estimated Coal Reserves in 2.0 Bn ton
Each Block
Estimated Potential of Each 4000-5000 MW for
Block 30 years
Thar Coal Characteristics
Extreme Performance Coal Range
PARAMETERS Design Coal
Extreme Values for Boiler Stable
Performance Coal Range
Operation
PROXIMATE ANALYSIS (As Received)
Total Moisture (% by weight) 49.5 44-50.2 40-55
Ash (% by weight) 7. 0 5.1-10.8 4-12
Volatile Matter (% by weight) 24.5 24.1-26 23.60-26
Fixed Carbon (% by weight) 19. 0 19.1-20.3 18.5-24
ULTIMATE ANALYSIS (As Received)
Carbon (% by weight) 30.89 27.61-37.77 27.61-37.77
Hydrogen (% by weight) 2.65 1.72-3.26 1.72-3.26
Oxygen (% by weight difference) 8.35 NA NA
Nitrogen (% by weight) 0.44 0.25-0.61 0.25-0.61
Sulfur (% by weight) 1.07 0.72-1.68 0.72-1.68
Chorine (% by weight) 0.097 0.065-0.166 0-0.166
Lower Heating Value (kJ/kg) 11198 10312-12771 9600-13400
Coal Flow
Transfer Transfer
Tower-1 Tower-2
Bunker house • Capacity 600t/h
• Disc type magnetic separators
• Large lump removing device Crusher house
• 1 toothed roller type crusher
capacity 450t/h
• O/L coal MAX size 50mm.
Bunker house • 1 vibrating screen
• 1 Revisable hammer type capacity
transfer tower 350 t/h Capacity 450t/h
• O/L coal max size 20mm Belt type magnetic separator
Thar Coal Mine (SECMC)
SECMC will execute the project in three phases. The first phase of the Project is underway, in which, two 330 MW sub critical
plants will be established with majority share of Engro Powergen and is expected to be completed by 2017. In the second phase
the mine will be further expanded to 7.6 MTPA and additional 2 x 330 MW will be added which are Thar Energy Limited (1 x 330
MW) and Thalnova Power Thar(1 x 330 MW) . Subsequently in phase three the mine will be taken to its potential of 33 MTPA
capable of generating 3,960 MW.
Coal Receiving, sampling, weighing and Unloading
A PLC system and a set of industrial TV-monitoring system will be provided for the operation of coal
handling system. The operating status of main equipment will be displayed on the LCD in control
room of coal handling.
NO Belt Name Belt Width Belt Speed Belt Capacity Belt Direction
1 C-1AB belt conveyor 1000mm 2.0m/s 600t/h One way
There are three transfer tower used in thar coal handling system.
NO.1 transfer tower Pulse Bag Dust Collector 3 Micro size water droplet dust suppression 1
system
NO.2 transfer tower Pulse Bag Dust Collector 3 Micro size water droplet dust suppression 1
system
Bunker House Transfer Pulse Bag Dust Collector 2 Micro size water droplet dust suppression 1
system
Coal Yard
• Coal yard with the length of 175m and width of 98.6m will be designed in the plant.
• The total valid capacity of coal yard will be 202,000 tons which can meet the requirement of 30 days design coal
consumption for 1x335MW unit at BMCR.
• Two stacker & reclaimers with a common track will be equipped in the permanent coal yard.
• The gyration radius of the stacker & reclaimer will be 35m.
• Stacking capacity is 600t/h and reclaiming capacity is 450t/h.
• Two bulldozers and one wheel loader will be provided for coal yard.
• Spraying facilities will be installed in the coal yard to suppress coal dust flying.
Coal Crusher
• The first-stage crusher will be toothed-roll type crusher with rated capacity of 450t/h. The inlet size shall
be no more than 350mm and the outlet size shall be less than 50mm
• The screen will be vibrating screen with a rated capacity of 450t/h
• The second-stage crusher will be revisable hammer type fine crusher having a rated capacity of 350t/h.
The inlet size shall be no more than 50mm and the outlet size shall be less than 20mm
• Sampling devices which are be used to monitor the as fired coal characteristic will be installed in
the middle of belt conveyor C-5AB. It will be equipped with coal returning devices.
• Belt weighing with chain code checking device will be installed on the belt conveyor C-5AB.
Gravimetric coal feeder front Side Gravimetric coal feeder Rear Side
Item unit value Item unit value
Max. output t/h 50 Max. output t/h 140
Motor power kW 9 Motor power kW 18
Transmission m (about)11.8 Transmission m (about)27
distance distance
Quantity Set 8
Quantity Set 2
As coal is transported from mine to company, it passes through different phases of loading, unloading,
transportation and storage. At each of these phases, it experience loss in Quantity and Quality (in terms of heating
value) because of several reasons. As per International Energy Agency, coal is expected to undergo a loss of 0.1 –
0.3% in Quantity and 0.05 – 0.2% in Quality (in terms of heating value)
• Transportation losses
• Oxidation losses
• Dust losses
• Coal impurities
• Self ignition losses
• Coal Moisture losses
Hazards:
• Risk to respiratory health
• Explosion
• Reduced visibility
• Slipping hazards
Fire Safety
Coal Dust Suppression Measure
• Spraying facilities will be installed in the coal yard to suppress coal dust flying.
• The dust removing system will be adopted at every transferring point to suppresscoal dust flying.
• Water clearing will be adopted in coal trestles and transfer towers.
• Closed type feed channel will be adopted on every feeding point.