HDPE Liner Technical Presentation
HDPE Liner Technical Presentation
Table of Contents
Introduction & Purpose References HDPE Raw Materials Inspection Prior to installation Installation Testing and Inspection Final Inspection Lesson Learned Conclusion
Introduction
The HDPE (High Density Polyethylene) geomembrane is a material which is widely used for the tank foundations. This product is a high quality geomembrane to meet the requirements of lining application and to protect the environment from chemical contaminations.
Purpose
It is an impervious vapor barrier which can be used as water proofing membrane for oil tank foundations to prevent the intrusion of oil contamination to the soil.
References
SAUDI ARAMCO STANDARDS SAES-A-114 Excavation and Backfilling SAES-Q-001 Criteria for Design and Const. of Concrete Structures 32-SAMSS-005 - Manufacture of Atmospheric Tanks INTL STANDARDS API-650 Welded Steel Tank for Oil Storage SATIPs (SAUDI ARAMCO Typical Inspection Plan) SATIP-A-114-001 SATIP-Q-001-02 SATIP-HDPE-001- Installation of HDPE Liners LESSON LEARNED 1. CRWR-088 Tips on HDPE Installation
Installation
The surface over which the liner is installed shall be free from all debris, vegetation and sharp projections. The surface shall be prepared and compacted with a minimum of 98 % compaction. The field density test, lines and levels are inspected.
The sump is made according to the drawing. The size , shape and slopes are to be checked. The position and slope of leak detection pipes are to be verified.
The sump is filled by stone pebbles and the leak detection pipe mouth is covered by geotextile to prevent the sand in to pipe.
The liner should be cleaned, the over lap of each piece is in between 100 and 150 mm ,the number of joints shall be minimized.
Extrusion welding Used to repair large holes, tears and destructive locations All patches shall extend at least three inches beyond the edges of the defect and all corners of patches shall be rounded. Grinding and welding is used to repair section of extruded fillet seams. Spot welding or seaming is used to repair small tears, pinholes or other minor localized flaws.
Vacuum testing machine shall be calibrated. The technician should be familiar with it. If any damage or leak can be marked and rectified .
Final Inspection
Prior to covering the membrane with sand, the membrane installed shall be checked thoroughly to be backfilled that day. This is the final inspection for the installation of the lining system. This final inspection is made to make sure there exists no damage or leak that was found, or caused after the previous repair is left unrepaired.
Clean sweet sand of same grade for concreting with a compact fill of 150mm thick layers shall achieve dry density required by project specifications.
16
Top layer of sand-cement of 100 to 150 mm thick in which 3% of cement in terms of weight shall be compacted according to 32-SAMSS-005 Appx B.2.6- 1,2,3
Lesson Learned
CRWR-088 Tips on HDPE Installation
Leak-Barrier Burned During Welding of Tank Bottom
Flexible membrane (High Density Poly Ethylene liner) was installed as a leak-barrier to above-ground API 650 storage tank bottom. HDPE lining was extended onto upper horizontal surface of foundation with asphalt impregnated fiber board on top. During welding of tank bottom plate, there was heat transfer that led to burning of HDPE lining, in spite of a Bitumen impregnated board placed between lining and bottom plate.
BITUMEN IMPREGNATED FIBER BOARD (12 mm) TANK RC FDN CURRENT HDPE LINER EXTENDED ON UPPER SURFACE OF FDN
BITUMEN IMPREGNATED FIBER BOARD (12 mm) TANK RC FDN HDPE LINER SHALL BE EXTENDING TO THE INTERNAL TOP EDGE OF THE RING FOUNDATION