Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 4

Follow the direction in order:

Follow the direction in order:

1. Put a roller east of the mason. 2. Put construction road closed stand signs north of the heavy duty dump truck. 3. Put a digger south of the roller. 4. Put a dump truck west of the mason. 5. Put a bulldozer east of the heavy duty dump truck. 6. Put 3 metal beams north of the bulldozer. 7. Put construction pipes south of the digger.
Coordinates: A3-heavy duty dump truck; B1-mason

1. Put a dump truck north-west of the 4 construction cones. 2. Put a roller south of the 4 construction cones. 3. Put a digger north-east of the 4 construction cones. 4. Put a sand south-west of the 4 construction cones. 5. Put a scooper east of the dump truck. 6. Put a mason south-east of the 4 construction cones. 7. Put construction pipes north of the sand.

Coordinates: B2-4 construction cones; C2-2 construction signs

You might also like