Chap 016
A Case Study: Freddie the Newsboys Problem (Section 16.1) Bidding for a Construction Project (Section 16.2) Project Management: Reliable Construction Co. (Section 16.3) Cash Flow Management: Everglade Golden Years Co. (Section 16.4) Financial Risk Analysis: Think-Big Development Co. (Section 16.5) Revenue Management in the Travel Industry (Section 16.6) Choosing the Right Distribution (Section 16.7) Decision Making with Decision Tables (Section 16.8) Optimizing with OptQuest (Section 16.9) Monte-Carlo Simulation with Crystal Ball (UW Lecture) 16.216.24 16.2516.31 16.3216.43 16.4416.49 16.5016.55 16.5616.61 16.6216.83 16.8416.99 16.10016.118 16.11916.137
These slides are based upon a lecture from the MBA core course in Management Science at the University of Washington (as taught by one of the authors).
McGraw-Hill/Irwin
16.1
McGraw-Hill/Irwin
16.2
Order Quantity
Simulated Demand Demand (rounded) Sales Revenue Purchasing Cost Salvage Value Profit
Uniform
McGraw-Hill/Irwin
16.3
McGraw-Hill/Irwin
16.4
McGraw-Hill/Irwin
16.5
McGraw-Hill/Irwin
16.6
The McGraw-Hill Companies, Inc., 2003
Pa ste D a ta C le a r D a ta R u n P re fe ren c es S ta rt S i m u la t io n Sto p S i m u la t io n Reset S im u la ti on S in g le S te p Foecas t W in d o w s O v e rla y C h art T re n d C h a rt S e n s it iv ity C h a rt C re a te R e p ort E x tra c t D a ta C ry s ta l B a ll H e lp
McGraw-Hill/Irwin
16.7
McGraw-Hill/Irwin
16.8
McGraw-Hill/Irwin
16.9
McGraw-Hill/Irwin
16.10
McGraw-Hill/Irwin
16.11
McGraw-Hill/Irwin
16.12
McGraw-Hill/Irwin
16.13
McGraw-Hill/Irwin
16.14
McGraw-Hill/Irwin
16.15
McGraw-Hill/Irwin
16.16
McGraw-Hill/Irwin
16.17
McGraw-Hill/Irwin
16.18
McGraw-Hill/Irwin
16.19
McGraw-Hill/Irwin
16.20
The mean standard error can be reduced by increasing the number of trials. However, cutting the mean standard error in half typically requires approximately our times as many trials.
McGraw-Hill/Irwin
16.21
McGraw-Hill/Irwin
16.22
750 trials were required to get the 95% confidence interval around the mean within $1.
McGraw-Hill/Irwin
16.23
This table shows the precision obtained for the various percentiles of profit after 750 trials.
McGraw-Hill/Irwin
16.24
McGraw-Hill/Irwin
16.25
Competitor Distribution Parameters (Proportion of Our Project Cost) Minimum 95% 110% Most Likely 130% 125% Maximum 160% 140% Competitor Distribution Parameters ($millions) Minimum 4.323 Most Likely 5.915 Maximum 7.280 Minimum Competitor Bid ($million) Our Bid ($million) Win Bid? Profit ($million) 5.688 5.400 1 0.800 (1=yes, 0=no) 5.005 5.688 6.370
McGraw-Hill/Irwin
16.26
McGraw-Hill/Irwin
16.27
McGraw-Hill/Irwin
16.28
McGraw-Hill/Irwin
16.29
McGraw-Hill/Irwin
16.30
McGraw-Hill/Irwin
16.31
Question: What is the probability that the project will complete by the deadline?
McGraw-Hill/Irwin
16.32
FINISH 0
McGraw-Hill/Irwin
16.33
Triangular distribution
m Elapsed time
McGraw-Hill/Irwin
16.34
Activity A B C D E F G H I J K L M N
Project Completion
McGraw-Hill/Irwin
16.35
McGraw-Hill/Irwin
16.36
McGraw-Hill/Irwin
16.37
McGraw-Hill/Irwin
16.38
McGraw-Hill/Irwin
16.39
McGraw-Hill/Irwin
16.40
McGraw-Hill/Irwin
16.41
McGraw-Hill/Irwin
16.42
McGraw-Hill/Irwin
16.43
Question: How large of a long-term loan should Everglade take out now?
McGraw-Hill/Irwin
16.44
Year 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
McGraw-Hill/Irwin
16.45
-6.649
>= >= >= >= >= >= >= >= >= >= >=
McGraw-Hill/Irwin
16.46
A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Year 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
LT Interest -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47
LT Payback
ST Loan 0.85 3.07 7.51 5.39 0.39 0.00 2.36 0.00 0.00 0.00
-6.65
Ending Balance 0.50 0.50 0.50 0.50 0.50 2.60 0.50 5.10 3.64 14.17 7.05
>= >= >= >= >= >= >= >= >= >= >=
Minimum Balance 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
McGraw-Hill/Irwin
16.47
McGraw-Hill/Irwin
16.48
McGraw-Hill/Irwin
16.49
McGraw-Hill/Irwin
16.50
Hotel Project Year 0 1 2 3 4 5 6 7 Cash Flow ($1,000,000s) 80 Normal (80, 5) Normal (80, 10) Normal (70, 15) Normal (+30, 20) Normal (+40, 20) Normal (+50, 20) Uniform (200, 844) Year 0 1 2 3 4 5 6 7
Shopping Center Project Cash Flow ($1,000,000s) 90 Normal (50, 5) Normal (20, 5) Normal (60, 10) Normal (+15, 15) Normal (+25, 15) Normal (+40, 15) Uniform (160, 600)
McGraw-Hill/Irwin
16.51
5 10 15 20 20 20 844
(mean, st. dev.) (mean, st. dev.) (mean, st. dev.) (mean, st. dev.) (mean, st. dev.) (mean, st. dev.) (min, max)
-90 -50 -20 -60 15 25 40 387.5 Think Big's Simulated Cash Flow ($millions) -24.999 -19.755 -15.822 -19.416 6.917 9.878 13.494 136.931 18.120
5 5 10 15 15 15 615
(mean, st. dev.) (mean, st. dev.) (mean, st. dev.) (mean, st. dev.) (mean, st. dev.) (mean, st. dev.) (min, max)
McGraw-Hill/Irwin
16.52
McGraw-Hill/Irwin
16.53
McGraw-Hill/Irwin
16.54
McGraw-Hill/Irwin
16.55
Question: How many reservations should Transcontinental accept for this flight?
McGraw-Hill/Irwin
16.56
Normal
152
Binomial
150 2
McGraw-Hill/Irwin
16.57
McGraw-Hill/Irwin
16.58
McGraw-Hill/Irwin
16.59
McGraw-Hill/Irwin
16.60
McGraw-Hill/Irwin
16.61
McGraw-Hill/Irwin
16.62
McGraw-Hill/Irwin
Some value most likely (the mean) Values close to mean more likely Symmetric (as likely above as below mean) Extreme values possible, but rare
16.63
The McGraw-Hill Companies, Inc., 2003
McGraw-Hill/Irwin
Some value most likely Values close to most likely value more common Can be asymmetric Fixed upper and lower bound
16.64
The McGraw-Hill Companies, Inc., 2003
McGraw-Hill/Irwin
Some value most likely Positively skewed (below mean more likely) Values cannot fall below zero Extreme values (high end only) possible, but rare
16.65
The McGraw-Hill Companies, Inc., 2003
McGraw-Hill/Irwin
16.66
Random value above some number (location) Shape > 0 (usually 10) Shape < 3 becomes more positively-skewed (below mean more likely) until it resembles exponential distribution (equivalent at Shape = 1) Symmetrical at Shape = 3.25, becomes negatively skewed above that Scale defines width
16.67
The McGraw-Hill Companies, Inc., 2003
McGraw-Hill/Irwin
McGraw-Hill/Irwin
Random value between 0 and some positive number (Scale) Shape specified using two positive values (alpha, beta) Alpha < beta: positively skewed (below mean more likely) Beta < alpha: negatively skewed
16.68
The McGraw-Hill Companies, Inc., 2003
Widely used to describe time between random events (e.g., time between arrivals) Events are independent Rate = average number of events per unit time (e.g., arrivals per hour)
McGraw-Hill/Irwin
16.69
Describes the number of times an event occurs during a given period of time or space Occurrences are independent Any number of events is possible Rate = average number of events per unit of time, assumed constant over time
McGraw-Hill/Irwin
16.70
Describes number of times an event occurs in a fixed number of trials (e.g., number of heads in 10 flips of a coin) For each trial, only two outcomes are possible Trials independent Probability remains the same for each trial
McGraw-Hill/Irwin
16.71
Describes number of trials until an event occurs (e.g., number of times to spin roulette wheel until you win) Probability same for each trial Continue until succeed Number of trials unlimited
McGraw-Hill/Irwin
16.72
Describes number of trials until an event occurs n times Same as geometric when Shape = n = 1 Probability same for each trial Continue until nth success Number of trials unlimited
McGraw-Hill/Irwin
16.73
Enter set of values with varying probabilities For each discrete value, enter Value and Prob. (leave other boxes blank) Clicking Enter clears boxes for entering next discrete value
16.74
The McGraw-Hill Companies, Inc., 2003
McGraw-Hill/Irwin
McGraw-Hill/Irwin
Enter range of discrete values, each equally likely Enter lower and upper end of range in Value and Value2 Enter the total probability for the whole set in Prob. Enter the distance between discrete values in Step
16.75
The McGraw-Hill Companies, Inc., 2003
Enter the lower and upper end of range in Value and Value2 Enter the total probability for the range in Prob. Leave Step blank for a continuous distribution Drag the corners of the distribution graph up or down to change relative probabilities Dragging corners may affect total probability. Click on Rescale to reset total probability.
McGraw-Hill/Irwin
16.76
Any combination of discrete values, ranges of discrete values, or continuous distributions can be entered Input each element, click on Enter, input next element, etc. If cumulative probabilities do not add to 1, click on Rescale
16.77
The McGraw-Hill Companies, Inc., 2003
McGraw-Hill/Irwin
McGraw-Hill/Irwin
16.78
16.79
McGraw-Hill/Irwin
16.80
McGraw-Hill/Irwin
16.81
McGraw-Hill/Irwin
16.82
McGraw-Hill/Irwin
16.83
Crystal Ball can be used to evaluate a particular value of the decision variable by providing a wealth of output for the forecast cells. However, this approach does not identify an optimal solution for the decision variable(s). Trial and error can be used to try different values of the decision variable(s).
Run a simulation for each, and see which one provides the best estimate of the chosen measure of performance.
The Decision Table tool in Crystal Ball does this approach in a systematic way.
McGraw-Hill/Irwin
16.84
McGraw-Hill/Irwin
16.85
McGraw-Hill/Irwin
16.86
McGraw-Hill/Irwin
16.87
McGraw-Hill/Irwin
16.88
McGraw-Hill/Irwin
16.89
McGraw-Hill/Irwin
16.90
McGraw-Hill/Irwin
16.91
McGraw-Hill/Irwin
16.92
McGraw-Hill/Irwin
16.93
McGraw-Hill/Irwin
16.94
McGraw-Hill/Irwin
16.95
McGraw-Hill/Irwin
16.96
McGraw-Hill/Irwin
16.97
McGraw-Hill/Irwin
16.98
McGraw-Hill/Irwin
16.99
McGraw-Hill/Irwin
16.100
McGraw-Hill/Irwin
16.101
McGraw-Hill/Irwin
16.102
McGraw-Hill/Irwin
16.103
McGraw-Hill/Irwin
16.104
McGraw-Hill/Irwin
16.105
McGraw-Hill/Irwin
16.106
McGraw-Hill/Irwin
16.107
McGraw-Hill/Irwin
16.108
Revenue ($millions) if Successful Project Up Stable Choice Hope Release R&D Investment ($millions) $400 300 600 500 200 Success Rate 50% 35 35 20 45 Mean $1,400 1,200 2,200 3,000 600 Standard Deviation $400 400 600 900 200
McGraw-Hill/Irwin
16.109
A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Revenue ($millions) (if Successful) 1,400 1,200 2,200 3,000 600 Total profit ($millions)
Decisions 0 0 0 0 0
McGraw-Hill/Irwin
16.110
McGraw-Hill/Irwin
16.111
OptQuest for Tazers Project Selection: Selecting Variables and Specifying Constraints
McGraw-Hill/Irwin
16.112
McGraw-Hill/Irwin
16.113
McGraw-Hill/Irwin
16.114
McGraw-Hill/Irwin
16.115
McGraw-Hill/Irwin
16.116
McGraw-Hill/Irwin
16.117
McGraw-Hill/Irwin
16.118
5. Run Simulation
Run the simulation. If you would like to change parameters and re-run the simulation, you should reset the simulation (click on the Reset Simulation button on the toolbar or in the Run menu) first.
6. View Results
The forecast window showing the results of the simulation appears automatically after (or during) the simulation. Many different results are available (frequency chart, cumulative chart, statistics, percentiles, sensitivity analysis, and trend chart). The results can be copied into the worksheet.
McGraw-Hill/Irwin
16.119
McGraw-Hill/Irwin
16.120
The McGraw-Hill Companies, Inc., 2003
Pa ste D a ta C le a r D a ta R u n P re fe ren c es S ta rt S i m u la t io n Sto p S i m u la t io n Reset S im u la ti on S in g le S te p Foecas t W in d o w s O v e rla y C h art T re n d C h a rt S e n s it iv ity C h a rt C re a te R e p ort E x tra c t D a ta C ry s ta l B a ll H e lp
McGraw-Hill/Irwin
16.121
Order Quantity
Simulated Demand Demand (rounded) Sales Revenue Purchasing Cost Salvage Value Profit
Uniform
McGraw-Hill/Irwin
16.122
McGraw-Hill/Irwin
16.123
McGraw-Hill/Irwin
16.124
McGraw-Hill/Irwin
16.125
McGraw-Hill/Irwin
16.126
McGraw-Hill/Irwin
16.127
McGraw-Hill/Irwin
16.128
McGraw-Hill/Irwin
16.129
McGraw-Hill/Irwin
16.130
McGraw-Hill/Irwin
16.131
McGraw-Hill/Irwin
16.132
McGraw-Hill/Irwin
16.133
Fitting a Distribution
Crystal Ball can be used to fit a distribution to data. The following data has been collected for the previous 100 phone calls to a mail-order house:
A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 99 100 101 102 103 104 B C D E F G H I
Phone Data
Customer # 1 2 3 4 5 6 7 8 9 10 95 96 97 98 99 100 Arrival (minutes) 8.22 12.25 12.27 16.26 18.06 18.87 23.46 23.53 28.73 30.56 194.02 195.48 195.87 196.84 197.81 200.43 Interarrival Time 8.22 4.03 0.02 3.98 1.81 0.81 4.58 0.08 5.20 1.83 0.28 1.46 0.38 0.98 0.97 2.61 Length of Call (minutes) 3.77 4.53 4.04 3.70 5.38 4.36 4.41 5.14 4.76 4.68 4.26 3.37 4.45 5.06 5.20 4.25 Interarrival Length of Call Time (minutes) 2.004 4.51
Averages
Simulation
McGraw-Hill/Irwin
16.134
McGraw-Hill/Irwin
16.135
McGraw-Hill/Irwin
16.136
McGraw-Hill/Irwin
16.137