PTW
PTW
23 May 2012
PMI Revision 00
23 May 2012
PMI Revision 00
PERMIT FOR WORK(PFW) RESTORATION OF MOTIVE POWER (ROMP). LIMITED WORK CERTIFICATE(LWC). SANCTION FOR TEST(SFT).
23 May 2012
PMI Revision 00
23 May 2012
PMI Revision 00
23 May 2012
PMI Revision 00
23 May 2012
DEFECTS PRIORITY. FAULT TYPE. PTW REQUIRED OR NOT. IMPACT OF BREAK DOWN. DESCRIPTION OF JOBS/WORK SPECIFICATIONS. MANPOWER REQUIRED. ESTIMATED DURATION. START OF MAINT. (DATE, TIME). COMPLETION OF MAINT.(DATE AND TIME) SPARES/CONSUMABLES USED. SPECIAL TOOLS AND TACKLES USED.
PMI Revision 00 6
PRIORITY OF DEFECTS:
E PRIORITY DEFECTS: E DENOTES WORK REQUIRING IMMEDIATE ATTENTION. THIS CATEGORY WILL COVER WORK, WHICH IS REQUIRING IMMEDIATE ACTION TO PREVENT INJURY TO PERSONNEL OR DAMAGE TO MAIN PLANT OR VITAL AUXILIARY PLANT OR TO PREVENT A SIGNIFICANT REDUCTION IN STATION OUTPUT. ONLY UNIT CONTROL ENGINEER CAN ISSUE THE E PRIORITY JOB CARD GIVING THE PROPER JUSTIFICATION.
23 May 2012
PMI Revision 00
A PRIORITY DEFECTS:
SUCH DEFECTS MUST BE PROCESSED QUICKLY SO THAT THEY CAN BE PROGRAMMED WITHIN 24 HRS. TO 72 HRS. SUCH DEFECTS ARE NOT URGENT AND CAN WAIT PROPER DIAGNOSTIC BY AREA ENGINEERS.
23 May 2012
PMI Revision 00
B PRIORITY DEFECTS: THE DEFECTS WHICH IF NOT ATTENDED WITHIN 72 HRS. TO ONE WEEK WILL RESULT LOSS OF GENERATION. C PRIORITY DEFECTS: THE DEFECTS, WHICH DO NOT HAVE ANY SIGNIFICANT EFFECT ON GENERATION, AVAILABILITY OR THERMAL PERFORMANCE.
23 May 2012
PMI Revision 00
10
PTW (ELECT.):
COMPLETE ISOLATION OF THE ELECTRICAL EQUIPMENT IS BEING DONE BEFORE ISSUING THE PTW. HT/LT BREAKERS, MODULES ARE TOTALLY ISOLATED FROM LIVE SYSTEM AND IT IS LOCKED AND THE KEY IS BEING PUT IN LOCK OUT BOXES. PROPER EARTHING IS BEING DONE. DANGER TAGS ARE FIXED ON MODULES AND ISOLATED BREAKERS.
23 May 2012
PMI Revision 00
11
PTW (MECH.):
ISSUING THE MECH. PTW FIRST CONNECTED ELECTRICAL SYSTEM IS ISOLATED. EQUIPMENT/SYSTEM FIRST ELECTRICALLY ISOLATED AND MECH. ISOLATION LIKE DEPRESSURIZATION, VENTING, DRAINING AND VALVE IS CLOSED AND LOCKED. ALL KEYS SHOULD BE PLACED IN LOCK OUT BOX.
23 May 2012
PMI Revision 00
12
23 May 2012
PMI Revision 00
13
23 May 2012
PMI Revision 00
14
23 May 2012
PMI Revision 00
15
23 May 2012
PMI Revision 00
16
OFFSITE ENGINEER:
HE IS RESPONSIBLE FOR OPERATION AND CONTROL OF EQUIPMENT INSTALLED AT CW PUMP HOUSE, AUX. PUMP HOUSE, CLARIFLOCULATORS, CLARIFIED WATER PUMP HOUSE, ASH SLURRY PUMP HOUSE, ASH WATER PUMP HOUSE. HE IS RESPONSIBLE FOR ISSUE AND CANCELLATION OF THE PTWS RELATING TO HIS AREA OF OPERATION INCLUDING PROPER ISOLATION AND FIXING OF DANGER TAGS.
23 May 2012
PMI Revision 00
17
THANK YOU