Professional Documents
Culture Documents
2 Major Component of Ddcmis
2 Major Component of Ddcmis
2 Major Component of Ddcmis
24 May 2012
PMI Revision 00
24 May 2012
INTEGRATED PLANT OPERATION THROUGH FULLY INTERCHANGEABLE OPERTAOR WORK STATIONS (OWS) FOR SG, TG AND BALANCE OF PLANT
(SOMETIMES THIS MAY NOT BE POSSIBLE DUE TO PACKAGING CONCEPT)
24 May 2012
PMI Revision 00
PROVISION OF EXTENSIVE SELFDIAGNOSTICS USE OF LARGE VIDEO SCREENS FOR PROJECTIONS OF VARIOUS PLANT MIMICS ETC. PROVISION OF FAULT ALARM ANALYSIS TO GUIDE THE OPERATOR TO THE MOST LIKELY EVENT PROVISION OF TREND ALARMS
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
DDCMIS CONFIGURATION
maxDNA SYSTEM
ENGG. STN FOR HMI HMI MMI LAN HMI REDUNDANT SERVERS ENGG.STN. FOR CONTROL SYS.
PROCONTROL SYSTEM
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
(DCS)
24 May 2012
PMI Revision 00
24 May 2012
PMI Revision 00
10
CONTROL SYSTEM
24 May 2012
PMI Revision 00
11
CONTROL SYSTEM
PROGRAMMING & CONFIGURATION MMIPIS SYSTEM M&S CLOCK
DCS
SG-C&I SYSTEM
CONSISTS OF BURNER MANAGEMENT SYSTEM (BMS), SOOT BLOWER CONTROL SYSTEM (SBC), SECONDARY AIR DAMPER CONTROL SYSTEM (SADC), AUXILIARY PRDS CONTROLS (APRDS) FOR BMS, SAFETY SYSTEM HARDWARE IS SPECIFIED, i.e. THE HARDWARE , WHICH MEETS THE REQUIREMENT OF RELEVANT NFPA AND VDE STANDARDS`
24 May 2012 PMI Revision 00 13
SG-C&I SYSTEM
TRIPLE REDUNDANT CONFIGURATION FOR THE FURNACE PROTECTION (MFT) PORTION OF BURNER MANAGEMENT SYSTEM (BMS) FOR SBC, SADC, APRDS,MILL & OIL ELEV. SEQUENCE, INTERLOCK AND PROTECTION, CONFIGURATION SIMILAR TO OLCS/CLCS (DESCRIBED LATER) FOR MILL & OIL ELEV. LOGICS, SAFETY SYSTEM HARDWARE SHALL BE USED
24 May 2012
PMI Revision 00
14
TG-C&I SYSTEM
CONSISTS OF TURBINE PROTECTION SYSTEM (TPS), AUTOMATIC TURBINE RUN-UP SYSTEM (ATRS), AUTOMATIC TURBINE TESTING SYSTEM (ATT), ELECTRO- HYDRAULIC TURBINE CONTROL SYSTEM (EHTC) FOR MAIN & BFP TURBINE, TURBINE STRESS CONTROL SYSTEM (TSCS), GLAND STEAM PRESSURE CONTROL GENERATOR SEAL OIL, PRIMARY WATER & HYDROGEN CONTROL SYSTEM (RECENT ADDITION).
24 May 2012 PMI Revision 00 15
TG-C&I SYSTEM
TRIPLE REDUNDANT OR 2 X 100 % REPEATED TWICE CONFIGURATION FOR THE TURBINE PROTECTION SYSTEM (TPS). FOR THIS, SAFETY SYSTEM HARDWARE / FAIL-SAFE HARDWARE SHALL BE USED FOR OTHERS, CONFIGURATION SIMILAR TO OLCS/CLCS (DESCRIBED LATER) TO BE USED
24 May 2012
PMI Revision 00
16
BOP-C&I SYSTEM
CONSISTS OF OPEN LOOP CONTROL SYSTEM (OLCS) AND CLOSED LOOP CONTROL SYSTEM (CLCS) OLCS -THE SEQUENCE CONTROL, INTERLOCK OF OF ALL THE PLANT SYSTEMS WHICH ARE NOT COVERED IN THE SG-C&I AND TG-C&I. THIS INCLUDES MAJOR AUXILIARIES LIKE FD/ID/PA FANS, AIR-PREHEATER, BFP/CEP/CWP/ BCWP , DMCWP/CLCWP AND ELECTRICAL BREAKERS.
24 May 2012
PMI Revision 00
17
BOP-C&I SYSTEM
(CLCS) -THE MODULATING CONTROL FOR VARIOUS IMPORTANT PLANT PARAMETERS, LIKE FW FLOW (DRUM LEVEL), FURNACE DRAFT, COMBUSTION CONTROL (FUEL FLOW AND AIR FLOW), PA HDR PRESSURE CONTROL, DEAERATOR/HOTWELL/HEATER LEVEL CONTROLS ETC.
24 May 2012
PMI Revision 00
18
MMIPIS
24 May 2012
PMI Revision 00
19
24 May 2012
PMI Revision 00
21
MMIPIS FUNCTIONALITIES
VPC OPERATION OTHER OPERATOR INFORMATIONS THROUGH VARIOUS DISPLAYS ALARMS, LOGS, HISTORICAL AND LONG TERM STORAGE. PERFORMANCE AND OTHER CALCULATIONS
24 May 2012
PMI Revision 00
22
24 May 2012
PMI Revision 00
23
24 May 2012
PMI Revision 00
24
24 May 2012
PMI Revision 00
25
24 May 2012
PMI Revision 00
26
24 May 2012
PMI Revision 00
27
24 May 2012
PMI Revision 00
28
24 May 2012
PMI Revision 00
29
24 May 2012
PMI Revision 00
30
24 May 2012
PMI Revision 00
31
24 May 2012
PMI Revision 00
32
SOE
24 May 2012
PMI Revision 00
33
ORIGINALLY THESE USED TO BE STAND-ALONE SYSTEM (DIODE AUCTIONEERING, DBTC ETC REQUIRED) NOW INTEGRATED -THEREFORE THE DIODE AUCTIONEERING, DBTC ETC NOT REQUIRED SOE - 1mS RESOLUTION, STORAGE OF REPOTRS FOR LONG DURATION ANNUNCIATION LOGIC THROUGH OLCS/CLCS CONTROLLERS.
24 May 2012 PMI Revision 00 34
24 May 2012
PMI Revision 00
35
24 May 2012
PMI Revision 00
36
Object-Oriented Configuration Graphical object-oriented configuration software tool Includes self-documentation of configuration True object-oriented features including encapsulation and inheritance Library of standard algorithms or objects
24 May 2012 PMI Revision 00 37
24 May 2012
PMI Revision 00
38
RECEIVES TIME SYNCHRONISATION SIGNALS EITHER FROM THE GEOPOSITIONARY SATELITE (NPL SIGNAL) DISTRIBUTES THIS SIGNAL TO THE MMIPIS AND THE CONTROL SYSTEM.
24 May 2012
PMI Revision 00
39
24 May 2012
PMI Revision 00
40
24 May 2012
PMI Revision 00
41
OPERATION PHILOSOPHY , CONTROL AREA AND BACK-UP INSTRUMENTATION & GEOGRAPHICAL DISTRIBUTION - COMBINED CYCLE PLANTS REDUNDANCY DESIGN CRITERIA
24 May 2012 PMI Revision 00 42
CONTROL SYSTEM POWER SUPPLY TWO SETS OF DC POWER SUPPLIES - ONE SET FOR SG/TG-C&I AND OTHER FOR BOP-C&I EACH WITH 2 X 100 % CHARGER AND 2 X 100 % BATTERY. OTHER IMPORTANT AC LOADS LIKE MMIPIS, PANEL INSTRUMENTS, ANALYSERS ETC. SHALL BE POWERED FROM UPS COMPRISING OF 2 X 100 % CHARGER, 2 X 100 % INVERTER AND 1 X 100 % BATTERY. HEAVY DUTY Ni-Cd BATTERIES HAVE BEEN ENVISAGED FOR LONGER LIFE & LESSER MAINTENANCE
24 May 2012
PMI Revision 00
43
24 May 2012
PMI Revision 00
44
FLAME MONITORING SYSTEM COAL FEEDER C&I ELECTROMATIC SAFETY VALVES FURNACE TEMP PROBES ACCOUSTIC PYROMETER FOR FURNACE TEMP PROFILE BOILER FLAME ANALYSIS SYSTEM COAL BUNKER LEVEL MONITORING SYSTEM ELECTRONIC DRUM/SEPARATOR LEVEL MONITORING SYSTEM TURBINE SUPERVISORY SYSTEM TDBFP TURBINE SUPERVISORY SYSTEM
24 May 2012
PMI Revision 00
45
OPERATION PHILOSOPHY
CENTRALISED OPERATION OF MAIN PLANT THROUGH OWS & LVS OFF-SITE PLANTS TO BE CONTROLLED FROM THEIR LOCAL STATIONS WITH STATION-WIDE LAN DATA LINK MINIMUM BACKUP INSTRUMENTATION ( ORIGINALLY CONSERVATIVE, NOW REDUCED. CRITERIA - HANDLING EMERGENCY & SAFE SHUT-DOWN) GEOGRAPHICAL DISTRIBUTION - ALTHOUGH NOT VERY USEFUL FOR POWER PLANTS AS COMPARED TO PROCESS/INDUSTRIES, BEING ADOPTED FOR FEW AREAS WHERE SIGNALS ARE CONCENTRATED (REDUCTION OF CABLING, MUCH LESS ERECTION & COMMISSIONING TIME)
24 May 2012
PMI Revision 00
46
DESIGN CRITERIA
PROVENNESS
SUPPLIERS EXPERIENCE SYSTEM EXPERIENCE PROVENNESS VS OBSOLESCENCE
RELIABILITY AVAILABILITY
HARDWARE QUALITY (PUBLISHED MTBF etc.) CONFIGURATION REDUNDANCY FAULT TOLERANCE
DESIGN CRITERIA
OPERABILITY
DESIGN CONCEPT - FAIL SAFE ETC. FALSE TRIP VS SAFETY OPERATOR CONVENIENCE DURING NORMAL RUNNING & EMERGENCY MANAGEMENT REPORTING
MAINTAINBILITY
STANDARDISATION (AS INDICATED ABOVE) MODULAR DESIGN AND EXPANDABILITY DIAGNOSTIC, FAULT IDENTIFICATION AND FAULT TOLERANCE GUARD AGAINST OBSOLESCENCE AVAILABILTY OF SPARES
OTHER CRITERIA
UNIT OPERATION PHILOSOPHY MARKET TRENDS AND EVOLUTION OF INFORMATION TECHNOLOGY FEEDBACKS FROM EXISTING SYSTEMS
24 May 2012 PMI Revision 00 48
THANK YOU
24 May 2012
PMI Revision 00
49