Bai Giang Thuc Hanh Mon Dien Co Ban 9748
Bai Giang Thuc Hanh Mon Dien Co Ban 9748
Company
LOGO
Content
I.The Electric Map and Circuits on family II. Power supply cord connection and V.O.M III. Motor 3 phase and motor 1 phase VI. Control circuit V. Measurement And Control Fan
1.Layout diagram
Funtion:Locate loads
KWh
2.Schematic diagram
6KV 10KVA 3 Includes circuit: - Three Phase Transformer 6KVA/0.38KV - Single phase electric meters - CB - 2 Fuses - 2 Switch - 2 Light,2 socket (10A,20A) 0,38KV 4 KWh 1~40 CB 30A R K2 R R R R K3 10A 20A K1
3.Wiring Diagram
6KV/ 0,38KV
- 4 light - 2 switch - 2 socket - Single phase electric meters - 5 Fuse KWh 1~40
10A
20A
Note
- System have wire mass - Wire on plastic pipe - Socket distance land 1.3m - Pile resistance < or = 4 om
Circuits on family
b. Branch connections (T-connector): - Place the wire A wire is perpendicular to the body B (the shell has been grooming and cleaning). - Wrap the wire A wire around the body behind the head string B of A, the first wire wrap - A round wire A to the front lines A and B wire wound on the body for about 7 to 10 ring-side. - Use pliers to tighten connections again
c. Lead solder - Plug the burner to reach maximum temperature. - Clean the surface with sandpaper connection. - Resin dots on the burner (the burner cleaned by acid in the resin). - Place the burner at an angle of 45 joints dovoi about 3 to 5 minutes (depending on the type of burner 40W or 60W) for connection to heat up. - How to put lead solder burner 1 to 2 mm for lead free flowing around the joints. - Connect the burner to reach maximum temperature. - Rats need to shell the string si. - Clean the surface of the wire. - Resin dots on the burner (the burner cleaned by acid in the resin). - Place the burner at an angle of 45 dovoi the wire about 3 to 5 minutes (depending on the type of burner 40W or 60W) for the wire to heat up. - How to put lead solder burner 1 to 2 mm for lead free flowing around the wire.
2. VOM - Meters VOM meter is called universal because it does much use. - VOM meter can measure currents, voltages, resistance. In addition, the - VOM can be used for Testing Transistor, determine the polarity of the diode ...
-Elevator (A): Calibration for Ohm (-0 from right to left as the -). - Elevator (B) and (C) dividing the Volt, Ampere DC, AC (DC.VA & AC.V) left to right, the maximum number of 0. - Scale (D) read Trasistor amplification factor (HFE = Ic / Ib). - Elevator (E) and uterus (F): read current polarization upon or against (leakage) of Diode. - Scale (G): one is to read the leaked ICEO of transistors ** Practices 1.Voltage measurements: - When you want to measure voltage alternating current (AC) or DC (DC), we adjust switch on the meter of the measuring period is denoted AC.V or DC.V - Select appropriate measurement period (larger) with a voltage to be measured. - Install parallel to the clock source to be measured.
-Read the voltage value measured on this scale. + 10 volt scale: each bar is 0.2 units. + 50 volt scale: each bar unit LA1. + 250 volt scale: each bar is 5 units. For example: choose period, we measured 250 index on the scale read 250 AC.V. Note: - When measuring AC voltage, attention select appropriate measurement range, avoiding - choose smaller voltage range to be measured or choose another measurement range voltage measurement.
2. DC current measurement:
-- When you want to measure DC DC (DC), we adjust the switch on clock period of measurement is denoted DC.mA - Select the period to match the measured current to be measured. - Install with the serial clock source to be measured. - Read the voltage value measured on the scale corresponds to the range measured.
3. Testers - When you want to measure the electrical resistance R, we adjust the switch on the measuring range is denoted . - Choose a suitable measuring range resistor to be measured. - Chap 2 measuring stick together and adjust the knob for the needle 0 standards. - Put the rod 2 measured in the first two resistors to be measured. - Read the index measured on the scale corresponds to the range measured.
U = 0v
Y A E B F H C
*INS:insclass *S.F: service factor *Frame:- structural parameters, such as structure height of the motor shaft from the floor, the distance of the axis of the fixed point the base installation. - example:Engine Frame: 215, then we get the first two numbers divided 4 so 5 * 1 / 4, this is the height of the shaft from the floor and 5 are set distance from a fixed point on the axis of the base (inch ) * U1U2=W1W2=V1V2
S. W : stort winding R. W: run winding RR. W > RS. W Experimental: RR. W = 50V, RS. W =20V
b.Contactor
NC(normally closed):0
NO(normally opened):
c.Thermal relay
d. Time relay
Step 1: Close CB Step 2: Press FOR Step 3: Test Machine Runs And then OFF Press
Step 1: Close CB Step 2: Press FOR Step 3: Press OFF and note direction of rotation of the engine REV Then click Back to make comparison engine => press OFF to stop engine
Step 1:close CB Step 2: Adjustment time relay 3 to 5 seconds Step 3:press FOR after 3 seconds of the transfer Step 4: press OFF
Step 1:close CB Step 2: press FOR Step 3: Mt press, engine performance at low speeds, the stator windings of the motor's auction Step 4: Mc Press, engine performance at high speeds, the stator windings of the motor's auction => Press OFF to stop engine
Requirements: - determine the correct position of the Closing Next, Open Your Contactor, Thermal relay, buttons - Check Point Next Good Or Not There - Connect the wires in place - Electrical Inspection Before Closing - Connect and notice how - Control relay time
Step 1: Wire played by 2 first, determine R4-R5 = Rmax Step 2: 3 wire connection head left and measurement with R4, R5 will determine R4, R5 (R5> R4) Step 3:Measure R4 top line top line with 3 remaining, define R1, R2, R3 (R1 >R2 >R3 )
The End