- DocumentWellhead - Saquib Erbiluploaded by
Yasir Ahmed
- Document1. API Q1-6A-16A-16C-16D-17D(1)uploaded by
Yasir Ahmed
- DocumentWell Killing Job Cost Estimate 6th November 2020_Rev 4.0uploaded by
Yasir Ahmed
- DocumentWell Condition Sheetuploaded by
Yasir Ahmed
- DocumentIslamabad_PK.pdfuploaded by
Yasir Ahmed
- DocumentWell Completion Policy Note Adhi-14 (WO-2)uploaded by
Yasir Ahmed
- Documentsurface_safety_valves.pdfuploaded by
Yasir Ahmed
- Document1-pvt.pdfuploaded by
Yasir Ahmed
- DocumentAyesha-1 GC & BHP Jobuploaded by
Yasir Ahmed
- DocumentApproval Notes for purchase of material required to build the Scafffolding and shed for WHCPuploaded by
Yasir Ahmed
- DocumentILO Codes of Practice (past).pdfuploaded by
Yasir Ahmed
- Documentwcms_107850.pdfuploaded by
Yasir Ahmed
- DocumentMDEA Safety Datauploaded by
Yasir Ahmed
- Documentpmbok-guide-6th-errata.pdfuploaded by
Yasir Ahmed
- Document423_0.pdfuploaded by
Yasir Ahmed
- DocumentMaterial Shifting to Badar Field for IBRAHIM-1 WELLuploaded by
Yasir Ahmed
- DocumentFlange Slide Rule n°1 versioneuploaded by
Yasir Ahmed
- Document067.pdfuploaded by
Yasir Ahmed
- DocumentIslamabad PKuploaded by
Yasir Ahmed
- DocumentPrayers Timingsuploaded by
Yasir Ahmed
- DocumentNano Station M5uploaded by
Yasir Ahmed
- Document005-Modeluploaded by
Yasir Ahmed
- DocumentHalliburtonSurfaceWellTestingBrochure1.pdfuploaded by
Yasir Ahmed