- DocumentC&E Mini Plantuploaded by
pavan
- DocumentDesign Basis POL Terminal Rasayani (1)uploaded by
pavan
- DocumentInput Data Required (3)uploaded by
pavan
- DocumentTech Spec Exp Bellow Input Sheet C-3992uploaded by
pavan
- DocumentTanks and Pumpsuploaded by
pavan
- DocumentSteam Consumption and line sizinguploaded by
pavan
- DocumentSteam Coil Sizinguploaded by
pavan
- DocumentWater cooled duct designuploaded by
pavan
- DocumentDuct Hydraulicsuploaded by
pavan
- DocumentCooling Water Line Hyduploaded by
pavan
- DocumentPwog Hzl 6033 Pr Pfd 001_process Flow Diagramuploaded by
pavan
- DocumentPWOG HZL 6033 PR CAL 002_Cooling Water Supply and Return Configurationuploaded by
pavan
- DocumentPWOG HZL 6033 PR CAL 001_New Dust Collector Design and Datasheetuploaded by
pavan
- DocumentDust Collector Designuploaded by
pavan
- DocumentDuct Modification Scope(1)uploaded by
pavan
- DocumentDuct Hydraulicsuploaded by
pavan
- DocumentDilution Dampeneruploaded by
pavan
- DocumentCooling Water Line Hyduploaded by
pavan
- DocumentATT 5uploaded by
pavan
- DocumentATT 4uploaded by
pavan
- DocumentATT 3uploaded by
pavan
- DocumentATT 2uploaded by
pavan
- Document500-400uploaded by
pavan
- DocumentATT 1uploaded by
pavan
- DocumentPUMP CALCuploaded by
pavan
- DocumentPSV Sizinguploaded by
pavan
- DocumentP&ID for Liquid Oxygen Storage Vesseluploaded by
pavan
- DocumentMailuploaded by
pavan
- DocumentPSV Sizing2uploaded by
pavan
- Document100 kl old caluploaded by
pavan
- Document100 VESSLE GA for Stiffeners-Modeluploaded by
pavan
- DocumentApplication Data- Foam Hangers- Falcon5 Projectuploaded by
pavan
- Document21 13 25 HIGH EXPANSION EXPANSION FOAM SYSTEMWITH SURGE ARRESTOR DETAILSuploaded by
pavan
- DocumentC1112-GIP1A00003 (VP8 Building Ventilation Project Equipment and Piping Proposed Layout) (2)uploaded by
pavan
- Document473-004uploaded by
pavan
- Document473-002uploaded by
pavan
- Document473-001uploaded by
pavan
- Document7S72-FF3-00-001-D rev07 FnG CauseEffect Matrixuploaded by
pavan
- Document50-551-MEL-C A-DS-004_CRSuploaded by
pavan
- Document50-551-MEL-C A-DS-005uploaded by
pavan
- Document7S72-PR1-00-023-08uploaded by
pavan
- Document50-551-MEL-C A-DS-003uploaded by
pavan
- Document50-551-MEL-C A-DS-004uploaded by
pavan
- Document50-551-MEL-C A-DS-003_CRSuploaded by
pavan
- DocumentHSSE-OHS-GL-01 GUIDELINE FOR LIFTING OPERATIONuploaded by
pavan
- DocumentFIG_01-SPLIT_SCOPE OF ELECTRICAL AND INSTRUMENTuploaded by
pavan
- Document3112002.03-PROJECT DESIGN BASISuploaded by
pavan
- DocumentAPPENDIX 8 PART1 BASIC DESIGN DOCUMENTuploaded by
pavan
- DocumentSafety Shower With Eye Wash- Typical Drawinguploaded by
pavan