- DocumentUpdates on Waterproofing Works From 12th -15th Flooruploaded byJoshua Midel
- Documentncr - rectified and floor tested at 3rd floor Garbage Roomuploaded byJoshua Midel
- Documentncr - plastering with chickhen wire for electrical and plumbinguploaded byJoshua Midel
- Documentncr - ceiling enclosureuploaded byJoshua Midel
- Documentinstallation of window panel at 11th flooruploaded byJoshua Midel
- Documentbalance of work (elevation & stair 1 & 2 )uploaded byJoshua Midel
- Document23uploaded byJoshua Midel
- DocumentRCDC-IRFI-10195-001 Functionality Test - Floor & Wall Finishes Installation Rev.1uploaded byJoshua Midel
- DocumentManpower Activity 11-10-2020uploaded byJoshua Midel