- DocumentKeystone Butterfly Valve GRW-L Emerson cataloguploaded by
Kreshna Wisnu Brata
- DocumentTFP2005_06_2021 FOAM SPRINKLERuploaded by
Kreshna Wisnu Brata
- DocumentUG Cooling Water Pipe Interface Schedule_20230321 Ynuploaded by
Kreshna Wisnu Brata
- DocumentUG Cooling Water Pipe Interface Schedule_20230321uploaded by
Kreshna Wisnu Brata
- Document2. Sample Spool List to CMSuploaded by
Kreshna Wisnu Brata
- DocumentCA01-R-LR (11) 11CW01B.001 (EN)_1.0uploaded by
Kreshna Wisnu Brata
- DocumentCA01-R-LR (11) 11CW02B.001 (EN)_1.0uploaded by
Kreshna Wisnu Brata
- DocumentUntitleduploaded by
Kreshna Wisnu Brata
- DocumentCA01-R-LR (11) 11CW01A.001 (EN)_2.0uploaded by
Kreshna Wisnu Brata
- DocumentCA01-R-LR (11) 11CW02A.001 (EN)_1.0uploaded by
Kreshna Wisnu Brata
- DocumentUntitleduploaded by
Kreshna Wisnu Brata
- DocumentUntitleduploaded by
Kreshna Wisnu Brata
- DocumentUntitleduploaded by
Kreshna Wisnu Brata
- DocumentUntitleduploaded by
Kreshna Wisnu Brata
- DocumentLS 135-03_3 NDT Metallic piping welds (EN)uploaded by
Kreshna Wisnu Brata
- DocumentLS 141-74.T13_6 Cleanliness of surfaces in air separation plants and components- Process piping and tanks for oxygen service at construction sites (EN)uploaded by
Kreshna Wisnu Brata
- DocumentLS 133-02_6 Pressure testing, Piping and equipment at construction sites (EN)uploaded by
Kreshna Wisnu Brata
- DocumentUntitleduploaded by
Kreshna Wisnu Brata
- DocumentLS 142-05.T02_3 Cold Bending of Pipes, Manufacture and Testing (EN)uploaded by
Kreshna Wisnu Brata
- DocumentLS 164-04_6 Identification traceability of piping material on construction site (EN)uploaded by
Kreshna Wisnu Brata
- DocumentLS 145-10.T01_10 Welding of piping (EN)uploaded by
Kreshna Wisnu Brata
- DocumentLS 145-19_5 Welding of Al-piping prefabrication and site welding (EN)uploaded by
Kreshna Wisnu Brata
- DocumentLS 145-10.T01-F01_2 Welding of piping Welder performance test Record (EN)uploaded by
Kreshna Wisnu Brata
- DocumentCA01-L-ZL (84) 84CW95.003_3.0_Isometric CA01-L-ZL (84)uploaded by
Kreshna Wisnu Brata
- DocumentCA01-L-ZL (84) 84CW94.004_3.0_Isometric CA01-L-ZL (84)uploaded by
Kreshna Wisnu Brata
- DocumentCA01-L-ZL (84) 84CW95.002_3.0_Isometric CA01-L-ZL (84)uploaded by
Kreshna Wisnu Brata
- DocumentCA01-L-ZL (84) 84CW94.003_3.0_Isometric CA01-L-ZL (84)uploaded by
Kreshna Wisnu Brata
- DocumentCA01-L-ZL (84) 84CW95.001_3.0_Isometric CA01-L-ZL (84)uploaded by
Kreshna Wisnu Brata
- DocumentCA01 L-ZL (34) 34CW01.002_1 Isometric CA01-L-ZL (34) 34CW01.002uploaded by
Kreshna Wisnu Brata
- DocumentCA01 L-ZL (34) 34CW01.001_1 Isometric CA01-L-ZL (34) 34CW01.001uploaded by
Kreshna Wisnu Brata
- DocumentCA01 L-ZL (34) 34CW02.001_1 Isometric CA01-L-ZL (34) 34CW02.001uploaded by
Kreshna Wisnu Brata
- DocumentApproved Fire Hydrantuploaded by
Kreshna Wisnu Brata
- DocumentPanduan Pengisian Clearance dan Kartu Rencana Studi (KRS) Mahasiswa ver.01uploaded by
Kreshna Wisnu Brata
- DocumentKRS 2021uploaded by
Kreshna Wisnu Brata
- DocumentISO T210 (1)uploaded by
Kreshna Wisnu Brata
- DocumentIso T218Modeluploaded by
Kreshna Wisnu Brata
- DocumentIso Pipe Sleeper T218uploaded by
Kreshna Wisnu Brata
- DocumentCamScanner 02-05-2021 14.06uploaded by
Kreshna Wisnu Brata
- DocumentCamScanner 02-07-2021 21.41uploaded by
Kreshna Wisnu Brata