- Documentvg30 (1)uploaded byAyan Dutta
- DocumentRoll Slip 12uploaded byAyan Dutta
- DocumentManish Kumaruploaded byAyan Dutta
- DocumentSOUMEN DIKPATI C.V (1)uploaded byAyan Dutta
- DocumentIMG_0002uploaded byAyan Dutta
- DocumentStatement UNLOCK2 (1)uploaded byAyan Dutta
- Document1. GSHPL-451 Dt. 29.12.2020 to Casta Reg.submission of Test Reports of Borrow Area-20 Reg_2uploaded byAyan Dutta
- Document1. GSHPL-451 Dt. 29.12.2020 to Casta Reg.submission of Test Reports of Borrow Area-20 Reg_1uploaded byAyan Dutta
- Documentfuploaded byAyan Dutta
- Documentf(1)uploaded byAyan Dutta
- Documentfuploaded byAyan Dutta
- Documentf(1)uploaded byAyan Dutta
- DocumentElectric Billuploaded byAyan Dutta
- DocumentStatement UNLOCK2 (3)uploaded byAyan Dutta
- DocumentRollSlip12uploaded byAyan Dutta
- DocumentPankaj Admit Carduploaded byAyan Dutta
- Document573 Letter 0573 Reg. Monthly Inspection of Project Road for the Month of October 2021uploaded byAyan Dutta
- DocumentDPR (2)uploaded byAyan Dutta
- Document1631628391_lakshmi Resume (1)uploaded byAyan Dutta
- DocumentAir India Web Booking eTicket (H2NYV) - Adakuploaded byAyan Dutta
- DocumentPankaj Admit Carduploaded byAyan Dutta
- Document1631628391_lakshmi Resume (1) (1)uploaded byAyan Dutta
- DocumentStatement UNLOCK2 (1)uploaded byAyan Dutta
- DocumentELECTRIC BILLuploaded byAyan Dutta
- DocumentRATHEEuploaded byAyan Dutta
- Documentupdate Milestone - 2 - Pkg1 (for RFI)uploaded byAyan Dutta
- DocumentTM NUMBERSuploaded byAyan Dutta
- DocumentOCTOBER WEATHER REPORTuploaded byAyan Dutta
- DocumentPRATAP_SINGHuploaded byAyan Dutta
- DocumentPankaj soni cv.uploaded byAyan Dutta
- DocumentNHAI DPRuploaded byAyan Dutta
- Document0+20 MISLENIOUS RFIuploaded byAyan Dutta
- Document0.000 TO 10.000uploaded byAyan Dutta
- Documentis.875.1.1987uploaded byAyan Dutta
- DocumentWMM AIV BACKuploaded byAyan Dutta
- Documentfinal proof checking of listed formatuploaded byAyan Dutta
- Documentfinal proof checking of format..uploaded byAyan Dutta
- Documentfinal proof checking of formatuploaded byAyan Dutta
- DocumentJGHPL-534 dt. 17.02.2021 to TL Casta Engineer reg. Submission of Design and drawing of ROB at km. 3+995uploaded byAyan Dutta
- DocumentGSHPL-524 dt.17.02.2021 to AEE-UHBVN-Bhalgaon reg.Completion Certificate under Electrical Estimate no. CER-222-2019-20uploaded byAyan Dutta
- Document237 Letter 0237 Reg. Undertaking for Casting of Deck Slab of LVUP @ 43+755.uploaded byAyan Dutta
- Document235 Letter 0235 Reg. Progress of the Project Highway.uploaded byAyan Dutta
- Document236 Letter 0236 Reg. Non-Fulfilment of Obligationsuploaded byAyan Dutta
- DocumentJGHPL-538 dt. 19.02.2021 to Casta Engineer-Submission of test reports of Wet Mix Macadam(Table no. 400-13 as per MORT & H, 5th Edition.uploaded byAyan Dutta
- DocumentIMG_0003uploaded byAyan Dutta
- DocumentIMG_0001uploaded byAyan Dutta
- DocumentIMG_0004uploaded byAyan Dutta
- DocumentBarwasini Camp Daily Concrete Production Update.. - Copy - Copyuploaded byAyan Dutta
- DocumentTCS Pkg-2uploaded byAyan Dutta