Inspection and Test Plan: Asawer&Zpeb Description of Work: DC System and Ups
Added by علي سعد مفلح
Document
12 Cover
Added by علي سعد مفلح
Document
Form-ELC-015: The Record of Motor Insulation Resistance
Added by علي سعد مفلح
Document
Handover Report - 10.11.22 To 23.11.22
Added by علي سعد مفلح
Document
Generator Installation Inspection Form: Sub-Contractor (Vicom) Contractor (Asawer/Zpeb) Pmc/Owner Signature Date
Added by علي سعد مفلح
Document
Off Line Test
Added by علي سعد مفلح
Document
Handover Report - 08.12.22 To 21.12.22
Added by علي سعد مفلح
Document
Handover Report - 27.10.22 To 09.11.22
Added by علي سعد مفلح
Document
FVGD
Added by علي سعد مفلح
Document
Site Survey Report - docxGRDS